A request for quote is only useful when the supplier can price exactly what you intend to install. For a wall hung ceramic basin 1004B, that means more than a photograph and a quantity. The model number, the wall behind the finished surface, the drainage arrangement and the delivery terms all change the quotation, and every gap in the enquiry turns into an email exchange — or a change order — further down the line. Here is the information we ask project buyers to send so that one RFQ comes back with a firm, comparable price.
Lead with the model number and the suite you want
Quote by model, not by appearance. The 1004B is the wall-hung basin in our 1004 sanitary series: a trapezoid bowl in vitreous ceramic with a glossy glaze, carried on the wall from a back panel, with a tap hole prepared for a single faucet. If your drawings call for matching pieces, list them in the same enquiry so they are priced and packed together — the washdown one piece toilet 1004A and the freestanding ceramic pedestal basin 1004S follow the same styling, and the wall hung bidet 1004F completes the set where a bidet is specified. Ordering a suite on one line also keeps glaze tone consistent from room to room.
If a room is too tight for the 1004B, say so rather than leaving us to interpret the drawing. We can quote another wall-hung format in place of it, such as the wall hung ceramic basin 1051B with its curved profile, and show you what each option does to the unit price.
Give wall build-up and drainage, not just room size
A wall-hung basin is supported by the wall, so the enquiry should state what sits behind the tiles or panelling: stud partition, masonry or steel framing; whether a concealed cistern or in-wall framing has already been designed; and where the finished wall line falls. Then describe the drainage — the position of the waste connection relative to floor and finished wall, and whether the trap runs horizontally into the wall or vertically through the floor. The 1004A in this series is offered with both P-trap and S-trap rough-in options, which illustrates why we ask: plumbing arrangements change from bathroom to bathroom on the same job, and the basin needs the same information.
For each bathroom or washroom, send the dimensioned layout, the waste and water-supply positions, and the tapware you plan to specify. The 1004B is prepared for a single faucet, so if your specification calls for a multi-hole or deck-mounted mixer, raise it at RFQ stage. That is a different fitting arrangement, and it belongs in the same quotation rather than appearing as an addition after production has started.
Break quantity down by model, room and delivery point
A quantity that reads "100 pcs" tells us very little. A useful line looks like this: 40 units of 1004B for guest bathrooms, 12 of 1004S for the spa wing, delivered in three consignments to two addresses. That lets us pack by room or by floor, which is what actually saves time on site — a single drop of loose cartons means somebody re-sorts everything before the installers can start. If you need carton markings keyed to your room schedule, request it in writing. If the project carries your own brand or a distributor label, mention that too: our OEM furniture manufacturing and custom production covers finish selection and branding, and it costs less to build in from the start than to retrofit later.
Ask for the technical sheet and check it against your drawings
Product pages carry overall dimensions and a description; the working numbers live on the technical data sheet. Our listing gives the 1004B an overall size of 510 × 420 × 380 mm for the trapezoid bowl. Treat that as the published figure and ask us to confirm it — together with waste outlet position and fixing centres — against the current technical sheet before your contractor sets out the wall. We would far rather answer that in week one than after the tiles are on. If your structural engineer has requirements for the framing or carrier frame, include them in the enquiry; that design work normally sits with others, so it needs to be visible from the start.
Set out delivery terms and what happens after arrival
Ceramics travel badly when freight is an afterthought in the enquiry. Give us the destination port or site address, whether you are weighing sea, air or rail, and your preferred Incoterms — ex works, FOB or delivered to the door. Our furniture logistics and door-to-door delivery service covers freight forwarding, export paperwork, packing and container loading, and shipment tracking, so we can return both a port price and a delivered price for you to compare on the same sheet. For an RFQ that is genuinely comparable, also ask for carton dimensions, total volume and gross weight, the packing specification for fragile ware, and lead time measured from confirmed drawing approval. Those four figures are the ones buyers most often forget to request and later need.
State what you expect after delivery as well: installation support, snag inspection, spare parts or replacement terms. Our furniture installation and after-sales support covers on-site fitting, inspection and spares, but the warranty period and its exclusions should appear in the quotation you sign, not be assumed from a web page.
A short RFQ checklist to copy into your enquiry
- Model numbers and quantities, split by room or building, with matching suite items grouped together.
- Tapware type and hole configuration; any colour or finish requirement.
- Wall build-up, who is designing the framing, waste position and trap arrangement for each bathroom.
- Dimensioned layouts, plus your room schedule if cartons are to be labelled by room.
- Destination, Incoterms, delivery split, and the lead time your programme requires from drawing approval.
- Documents requested: technical data sheet with fixing and waste dimensions, carton volume and weight, packing specification.
- After-sales expectation: installation, snag list, spares holding.
Send that much and a quotation for the 1004B comes back complete on the first pass — priced, packed and scheduled against your programme. Send less, and the first reply will simply be the questions above. Browse our bathroom sanitary fixtures range to fix the models you want quoted, then send the enquiry through the contact page.