A compact, configurable swim spa only performs the way its data sheet promises if the buyer hands the factory a complete brief. This guide shows builders, villa owners and project buyers exactly what to send when specifying the Outdoor Swim Spa WS-PC01, so the quotation, the electrical design and the site works all line up before production starts.

Most swim spa disputes do not start with a defective shell. They start with an enquiry that says only "one unit, 3 metres, delivered to Melbourne". The factory then quotes a standard configuration, while the buyer expected a heated unit with steps, insulated walls and a specific control arrangement. By the time the unit lands on site, the power supply has been sized for the wrong load and the pit dimensions do not allow access for the filter pump. A short, precise brief removes all of that.

Start with the published baseline, then state what changes

The WS-PC01 is part of our configurable outdoor swim and hydrotherapy range. The published catalogue entry gives you a baseline to write against, so your brief should reference the model name first and then list every deviation from it. For orientation, here is what the catalogue currently shows:

ItemCatalogue figure for WS-PC01
Footprint3000 × 1050 mm
Control system1 set
Water pump2 pcs
Filter pump1 pc
Jet total53 pcs
LED lighting1 pc
Total power6.65 kW
Features shownWater jets, LED lighting, Ozone
Swim training systemNot listed for this model

Treat these numbers as the starting point of a conversation, not as an order. The range is configured per project, so confirm the included equipment and the electrical requirement for the exact specification you are buying. If your design needs a different footprint or a different jet count, say so in the first message — we also publish adjacent models such as Outdoor Swim Spa WS-PC01A, and comparing two model pages side by side is often faster than describing a modification in words.

The six items a manufacturer needs before quoting

Send these in your first enquiry. Each one removes a round of questions and prevents a re-quote later.

  • Intended use. Daily lap-style exercise, guest hydrotherapy at a boutique property, or occasional family relaxation? Jet layout and how you want the 53 jets distributed across seating and lounger positions follow from this.
  • Installation setting. Above-ground on a slab, semi-recessed, or fully recessed with an equipment access hatch. Tell us the finished deck level and where the plant access will be.
  • Water volume and temperature target. State whether year-round heating is required in your climate, because that decision drives the heat pump and insulation line items rather than being handled as a late accessory.
  • Power supply. Voltage, phase, available circuit rating and where the isolator will sit. Total power for this model is listed at 6.65 kW; your electrician needs that figure early, not after the unit ships.
  • Options you want priced. The catalogue options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. List what you need included in the quotation and what your local contractor will supply.
  • Delivery terms and site access. Port or door address, delivery vehicle access, crane or forklift needs, and who handles on-site placement.
Practical tip: write the brief as a table with three columns — "catalogue standard", "what we need", "who supplies it". A manufacturer can price that in one pass, and your client or builder can sign off on the same document.

How the brief travels through the project

SANTERSON works as a furniture and building materials manufacturer handling complete fit-out packages, so a swim spa rarely arrives alone on our projects. On villa and hospitality jobs it usually travels with poolside loungers, pergolas, bathroom ceramics and lighting from the same order. That is the practical reason to brief the swim spa properly: the specification you send also sets the delivery window for everything else in that outdoor zone.

Our turnkey workflow runs through consultation, design and planning, production, logistics, installation and after-sales. Your brief feeds the first two stages directly. A clear specification lets us confirm the configuration, issue drawings for your builder to prepare the slab and power, and only then release production. Vague input produces a quotation that is technically valid but commercially misleading.

The same applies to custom and OEM work. If you are specifying for a resort brand or a developer with a repeat standard, tell us which elements must be consistent across units — control placement, jet zoning, finish colour, branding on the shell — so prototyping and material selection start from your standard rather than ours.

Confirm before production: five checks that protect the buyer

  • Equipment list signed off line by line. Confirm pumps, control set, lighting and sanitisation as named items with quantities, not as "as per standard".
  • Electrical requirement in writing. Ask for the confirmed supply specification for your configuration and pass it to your electrician before first fix.
  • Dimension drawing with clearances. The 3000 × 1050 mm footprint is the shell; you need the access clearances for the filter pump and service points drawn on.
  • Freight and packaging plan. Confirm how the unit is packed, what lifting equipment your site needs, and who clears customs if you are importing.
  • Commissioning and support scope. Agree in advance who fills, tests and hands over the unit, and what spare parts you should hold on site.

Send those five confirmations as a single sign-off sheet. Once your team has initialled it, production is unblocked and both sides are working from the same document.

A short example brief you can copy

"Model reference: Outdoor Swim Spa WS-PC01. Site: villa pool deck, semi-recessed with side access hatch; finished deck level 42.00. Use: guest hydrotherapy plus morning exercise, year-round heating required. Supply: 400 V three-phase available at the plant room wall, isolator within 5 m. Options to price: heat pump, insulation, steps, UV sterilisation, sand filtration. Builder supplies: slab, deck finishes, electrical first fix and final connection. Delivery: door address to follow; 3 t truck access confirmed, crane needed for placement." That is enough for a manufacturer to quote accurately and to tell you immediately if any request falls outside the model's configuration.

If you are specifying a swim spa as part of a wider outdoor or interior package, send your model reference, drawings and option list together and we will confirm the configuration, power requirement and delivery plan before production. Browse the full swim spa range on our site, or contact us through the contact page with your project details.