A quotation for a compact swim spa usually arrives as a single line: model number, one price, delivery term. Two proposals that look identical on paper can still differ sharply in what reaches your site, because the shell is only part of the cost. The checklist below walks through Outdoor Swim Spa WS-PC01 as a worked example, so you can read any manufacturer's proposal for this model, or any plunge spa of similar size, and know what you are agreeing to before the deposit clears.
Start with the footprint, not the price
The WS-PC01 is listed at 3000 × 1050 mm. Those two numbers decide far more than the spa itself: the slab you pour, whether a crane or simply a small crew is needed to set it, how the delivery vehicle approaches the site, and where the plant room or equipment bay ends up.
Ask for the shipping dimensions as well as the finished shell dimensions. A spa that fits the terrace on the architect's plan but cannot pass the side gate is a variation-order conversation you will have later, at someone else's rates.
Read the equipment schedule line by line
The catalogue record for this model lists one control system, two water pumps, one filter pump, a jet total of 53 and one LED light. Compare that list against your quotation item by item, because a jet count means different things in different offers — some suppliers count every nozzle on a seat cluster as a separate line, others package them together.
Three questions settle most disputes:
- Which pumps are included in the base price, and which appear as add-ons?
- Is the filter pump sized for the shell volume, or is it the smallest unit in the range?
- Does the control system shown on the drawing match the make named on the quotation?
The same catalogue also lists Outdoor Swim Spa WS-PC01A at 3000 × 930 mm, with a different jet total and a lower rated power draw. Same plan length, different hydraulics. If a proposal quotes the model code without stating the configuration, you may be comparing two different machines.
Treat the options list as part of the price
Catalogue-listed extras for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so confirm each one against the configuration you are buying. None of these are decoration: a heat pump changes your running-cost profile, insulation changes how much of that cost you keep, and sand filtration changes the maintenance routine your facilities team follows after handover.
Get each option priced separately, with the make and model stated. An "inclusive of all options" line is where budget overruns are born.
Check the electrical load before the electrician does
Total power for this configuration is listed at 6.65 kW. That figure should reach your electrical consultant in writing, together with the supply requirement and confirmation of whether a heat pump is counted inside it or added on top. A spa delivered to a site whose board cannot carry the load sits in its crate while the switchgear is reworked.
Confirm what "features shown" actually means
Product pages in this range show water jets, LED lighting and ozone. Marketing imagery and the supplied specification are not the same document. Ask for a signed specification sheet naming every item included in your configuration, and treat anything not on that sheet as an extra.
Judge the manufacturer by the whole delivery
A swim spa is a small building service, and it arrives through the same chain as cabinetry or outdoor furniture. That is why we assess these units as part of the wider proposal: custom and OEM production where dimensions or finishes need to change, logistics and door-to-door delivery with the export paperwork handled at our end, and installation and after-sales support once the unit is on site. A proposal that covers the spa inside a package already supplying your outdoor furniture, wall finishes and bathroom fixtures gives you one coordination point instead of four.
Score every manufacturer on three practical questions: who sets the unit on the slab, who signs off the plumbing and electrical connection, and who answers the call in year two when a pump fails. Write the answers into the contract.
A short comparison sheet before you sign
| Item to confirm | Where it should appear |
|---|---|
| Shell dimensions and shipping dimensions | Specification sheet, both figures |
| Pump count and filter sizing | Equipment schedule with makes |
| Jet count and how jets are counted | Equipment schedule |
| Total power and supply requirement | Electrical data sheet |
| Options priced separately | Quotation line items |
| Setting, connection and warranty responsibility | Contract scope of works |
Send us the proposal you are holding and we will mark it up against this list. If the WS-PC01 shell is the wrong size for your site, the range covers several other configurations, including a deeper seat layout and longer shells with a swim training system, and a machine that suits the plan is worth more than a good price on one that does not.