A wall-hung basin looks simple on a rendering, and that is exactly where procurement trouble starts. The Wall Hung Ceramic Basin 1051B, Modern Wall Mount Bathroom Sink is a compact, back-panel-mounted ceramic basin intended for guest bathrooms, apartments, boutique hotels and villa renovations. On site it either disappears neatly into the wall or it fights with the framing, the waste outlet and the tapware behind that wall. The difference between those two outcomes is almost never the basin itself — it is the paperwork the procurement team assembled before the order was placed.
The list below is the documentation set we ask buyers to complete for this model. It follows the same sequence our project team uses when bathroom fixtures are supplied together with vanities, wall panels and flooring on a single turnkey furniture and building materials package.
1. The exact product record: model, dimensions and mounting method
Never order from a photograph or a shortened line item. The purchase record should carry the full published title — Wall Hung Ceramic Basin 1051B, Modern Wall Mount Bathroom Sink — together with the model code 1051B, so that replacements and repeat batches can be traced years later. For this basin the product page states an overall size of 400×380×450 mm and a wall-mounted fixing secured by a back panel, without a supporting cabinet. Treat those figures as the published page data and confirm them against the current technical drawing before any wall is closed up; dimensions and rough-in details are re-issued when a product revision is made.
Record the mounting method explicitly. A back-panel-fixed basin transfers its load into the wall structure, so the substrate behind the tiles has to be agreed and drawn by others — this is where an undocumented assumption becomes a site variation. Note in the same row whether the wall is stud framing, steel framing or masonry, and who signs off the reinforcement.
2. Waste, water supply and tapware interface
The 1051B has a pre-drilled hole for a single-faucet installation. That single line answers several questions at once and raises others the buyer still has to close out:
- Which faucet is being bought — basin mixer height, spout reach, and whether it sits on the basin or on a shelf beside it.
- Where the hot and cold outlets land relative to the finished wall face, and who sets that out before tiling.
- How the waste is routed and what trap arrangement the local plumbing design assumes for a wall-hung fixture.
- Whether the shut-off valves and connectors are included in our supply or left to the local contractor.
The published product page does not define the trap or rough-in geometry, so do not infer it from a similar project. Ask for the current technical data sheet and attach it to the requisition; that single attachment prevents most of the disputes we see at handover.
3. Where the 1051B sits inside the 1051 suite
This basin belongs to a coordinated range, and specifying it in isolation is how a hotel ends up with three different ceramic whites across one floor. The 1051 set also covers a wall-hung WC, a freestanding pedestal basin and a one-piece washdown toilet, all sharing the same soft curved profile and glaze. Where a project mixes room types — guest bathrooms in one size, main ensuite in another — document which rooms take the wall-hung 1051B and which take the pedestal or vanity-mounted option, then hold that mapping in one schedule rather than across e-mail threads.
The same glaze and profile logic carries into adjacent ranges such as the Wall Hung Ceramic Basin 1004B, which uses a trapezoid outline and a larger footprint. If a designer swaps between them mid-project, the change ripples into wall setting-out and tap positions, so record the swap date and the rooms affected.
4. Room-by-room schedule for multi-unit projects
For an apartment block or a boutique hotel, one line item is not enough. Build a schedule keyed to room numbers, and let each row carry everything a site team needs without opening another document.
| Field to record | Why procurement needs it |
| Room / unit number and floor | Ties the fixture to a physical location for delivery sequencing and snagging. |
| Model code and full product title | Protects repeat orders, spares and any later extension of the same range. |
| Confirmed overall dimensions | Drives clearances to side walls, doors and mirrors before tiling starts. |
| Wall build-up and reinforcement responsibility | Back-panel fixings need an agreed substrate; this is a classic interface gap. |
| Faucet model, finish and supply scope | Single-hole basin; the mixer, valves and connectors still need an owner. |
| Waste and trap arrangement per local design | Confirm with the technical sheet rather than from a previous job. |
| Packaging, protective packing and carton count | Ceramics are counted by carton on site; mismatches surface as short deliveries. |
| Batch / colour code of glaze | Keeps whites consistent across rooms ordered at different times. |
| Inspection and acceptance criteria | Gives the site team a written basis for accepting or rejecting cartons. |
5. Specification, finish and long-term maintenance
The 1051B is made from vitreous ceramic with a dense glossy glaze that resists water marks and limescale, which is the practical reason it suits high-turnover guest bathrooms. Procurement should still write down what cleaning agents the operator will allow, because aggressive acidic or abrasive products damage even a good glaze and shorten the life of the installation. Capture the maintenance instruction in the handover pack next to the warranty terms, and note who provides spare parts if a basin is damaged after the works are complete.
6. Pairing the basin with vanities, mirrors and lighting
A wall-hung basin is often specified precisely because no cabinet is needed — but many projects then add storage and mirror lighting beside it. Where that happens, document the combination as a set: the Single Vanity for rooms that need storage, or a Santerson LED Mirror Cabinet where the mirror doubles as cabinetry. Both are made to measure, so their dimensions and finishes have to be locked at the same time as the basin setting-out; otherwise the mirror ends up centred on a wall that no longer matches the basin position.
Electrical items in that group need their own line in the record. Lighting and electrical specifications for a bathroom zone are confirmed per project, so keep the wiring responsibility with the local contractor clearly separated from our supply scope. The same separation applies to shower systems ordered on the same package.
7. Delivery, packaging and after-sales records
Ceramic fixtures fail at the handover stage for unglamorous reasons: cartons arrive without a matching packing list, or nobody photographed the goods at the container. Our logistics scope covers freight by sea, air and rail with the associated paperwork — commercial invoice, packing list, certificate of origin — and door-to-door delivery to site. What procurement should add on its side is a receiving procedure: count against the packing list, photograph damaged cartons before signing, and log any breakage the same day so replacement can be raised under the after-sales process rather than argued about months later.
Keep three documents in one project folder and you have covered most of what a dispute requires: the signed product specification with model code, the confirmed technical drawing, and the packing list that matches the delivered cartons.
8. Common documentation gaps we see on real projects
- A shortened description in the purchase order that drops the model code, making a later repeat order ambiguous.
- Wall reinforcement treated as somebody else's scope until the basin is ready to be hung.
- Tapware chosen after tiling, so the spout reach no longer suits the basin depth.
- Rough-in assumptions copied from an earlier project instead of taken from the current sheet.
- No record of glaze or batch code when rooms are fitted out in phases.
9. A quick pre-order check for the 1051B
Confirm before you release the order
- Model code 1051B and full product title recorded in the requisition.
- Current technical data sheet attached, with dimensions cross-checked against the setting-out drawing.
- Wall build-up, reinforcement and who signs it off — named, with a date.
- Faucet model and finish selected; supply split between our scope and local contractor written down.
- Waste and trap arrangement confirmed by the local plumbing design.
- Room-by-room schedule complete, including phased rooms and batch codes.
- Receiving and inspection procedure agreed with the site team before shipment.
The basin itself is the easy part. A compact curved ceramic bowl with a single tap hole and a back-panel fixing will serve a guest bathroom for years without attention. What needs documenting is everything behind the wall and around the order — and that documentation is what lets a furniture and building materials supplier deliver the same result on unit 4 as on unit 40.
Send us the room schedule and the setting-out drawings, and our project team will return the confirmed technical sheet for model 1051B together with a specification that matches your package — including vanities, mirror cabinets, shower systems and the rest of the bathroom fit-out under one coordination scope.