A swim spa order is decided long before the first cutting begins. On a project as large as Outdoor Swim Spa WS-130CⅢ, the difference between a clean handover and an expensive rework usually comes down to how much usable information the buyer hands over at the enquiry stage. If you are specifying one of these long-range units for a villa, resort or private estate, this is the brief we ask our project teams and customers to prepare.

Why the Brief Matters More on an 11-Metre Shell

The WS-130CⅢ sits at the long end of our configurable swim and hydrotherapy range, with catalog dimensions of 11830 × 3000 × 1430 mm. A shell that length crosses two practical thresholds at once. It normally arrives as more than one piece or on an oversize transport arrangement, and it needs a slab, deck or podium engineered to carry a full water load over a long span. Neither of those things can be settled from a product photo, so the manufacturer has to be given the site picture before pricing is meaningful.

The same brief also fixes which version of the model you are actually buying. The catalogue carries WS-130CⅢ and WS-130CⅢ-U side by side at the same 11830 × 3000 × 1430 mm footprint, but they are not interchangeable: the CⅢ is listed with a swim training system and one water pump, while the -U variant is listed without a recorded swim training system and with multiple water pumps. Quote requests that only say "13-foot-class swim spa" or "the 130C" produce the wrong equipment schedule every time.

The Six Items to Put in Writing

1. Site and access drawings, not photographs

Send the plan view of the intended location with dimensions: overall length and width available, clear height under any pergola or roof structure, distance from the nearest wall or boundary, and the finished level relative to the ground. Add the delivery route — gate widths, turning radius, overhead cables, lift or crane access if the unit is going to a rooftop terrace or an upper-level deck. A single dimensioned plan removes most of the questions that otherwise take three email rounds to settle.

2. Structural support arrangement

Tell us what the shell will sit on: a perimeter strip footing, a fully reinforced slab, a steel frame, or a raised timber deck over bearers. Give the bearing points and, if you have them, the engineer's allowable load. For an in-ground or semi-recessed installation, include the retaining detail and drainage plan around the shell. Water is heavy and a long shell concentrates that load along its full length, so this is the item we most often see left blank.

3. Electrical supply

The catalogue lists total power for WS-130CⅢ at 10.85 kW. Treat that figure as a starting point for your electrician, not as the final load, because options such as a heat pump change it. Provide the available supply — single or three phase, voltage, breaker capacity and the distance from the main distribution board to the plant area — and confirm who is responsible for the dedicated circuit, isolation and earthing on site.

4. Equipment scope you want included

The standard specification shown on the site covers one control system, one swim training system, one water pump, one filter pump, twenty jets and seven LED lights, with water jets, LED lighting, ozone and a swim training system listed as the features shown. Everything beyond that is selected. Our catalogue options include additional control systems, UV sterilisation, extra water pumps, heat pumps, sand filtration, insulation and steps. State which of these you want and which your local contractor will supply, so nobody quotes the same pump twice.

5. Intended use and user profile

A unit specified for daily lap training by a triathlete is commissioned differently from one installed mainly for hydrotherapy and children's play in a resort garden. Tell us who will use it, how often, and whether the relaxation end or the swim channel matters more. If the project needs a separate therapy area alongside the swim channel, look at the Long Outdoor Swim Spa with Hydrotherapy & Relaxation Pool as an alternative layout before you commit to a single-channel shell.

6. Programme, delivery terms and installation responsibility

Give the required site-ready date and work backwards, because the shell, the civil works and the electrical works have to meet in the middle. Confirm the Incoterms you want, the discharge port or address, and who handles import clearance on your side. Then state plainly who is doing the setting, levelling and commissioning: our team, your builder, or a split arrangement. We handle production, freight coordination and door-to-door delivery; site preparation and local electrical connection normally sit with the buyer's contractor.

Specification Snapshot to Attach to Your Enquiry

ItemCatalogue reference for WS-130CⅢ
Overall size11830 × 3000 × 1430 mm
Control system1 set
Swim training system1 set
Water pump / filter pump1 pc / 1 pc
Jets20 pcs total
LED lights7 pcs
Total power10.85 kW (confirm with the selected options)
Features shownWater jets, LED lighting, Ozone, Swim training system

Print this table, mark up what you want changed, and send it back with your drawings. That single page is the fastest way to get a quotation that matches what will actually be delivered.

When a Different Model Fits Better

If the site cannot take an 11.8-metre shell, do not force it. The Outdoor Swim Spa WS-130AⅢ carries the same equipment pattern — swim training system, twenty jets, seven LED lights, 10.85 kW — in a shorter 8000 × 3000 × 1400 mm envelope, which fits standard decks and normal delivery arrangements far more easily. The wider Swimming Pools and Swim Spas range covers shorter shells through to larger configurations, so the length can be set by the site rather than by habit.

Where the architecture calls for a non-rectangular footprint instead — a circular courtyard, an oval terrace, a curved spa room — our Customizable Shape Outdoor Spa line is built on an acrylic shell with structural reinforcement and can be produced in square, round, oval or curved forms. In that case the brief shifts from model selection to shape, siting and access, but the six items above still apply.

What a Complete Brief Unlocks

With those six inputs in hand we can confirm the model variant, lock the equipment schedule, advise on the support arrangement, price the freight correctly and put the shell into production against your programme. Without them, every party is guessing, and corrections on a shell of this size are paid for twice — once in the factory and once on site.

Before you send the enquiry: dimensioned site plan and delivery route; support structure and allowable load; available electrical supply; selected equipment options; intended use pattern; required site-ready date and delivery terms. Six items, one email.

Send Us Your Drawings

SANTERSON manufactures swim spas alongside outdoor furniture for villas and resorts, interior fixtures and building materials, so the spa, the poolside lounging set and the surrounding finishes can be coordinated from one factory rather than reconciled across several suppliers. If you are specifying WS-130CⅢ or weighing it against a shorter shell, send the drawings and the six items above and we will come back with a specification-matched quotation.

SANTERSON — China-based manufacturer and one-stop supplier for furniture and building materials, serving villa, hospitality and office projects since 2008.

Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com

Enquiries: https://www.santerson.com/contact/