A submittal is the package a specifier, main contractor or buyer reviews before a wall finish is approved for a project. For a flexible wood grain cement wall panel, the paperwork matters more than it would for a standard rigid board: the material bends, it carries a mineral base, and it is usually supplied from overseas. The documents below are what we normally send so that approval does not stall on site.
1. Product identification and scope sheet
Start with a page that states plainly what is being offered: product name, the supplier offering it, the project reference and the areas it is quoted for. Our company profile is at About, and the same information belongs in the submittal so the reviewer can match the panel to the line item on the schedule of finishes.
List where each finish is going. Interior feature walls, external facade cladding, curved walls and arches, renovation overlays, lobbies and lift lobbies are different exposure conditions, and a reviewer will ask which is which before signing anything off.
2. Composition and physical data
State the make-up of the sheet in the reviewer's own terms: a cement-based mineral decorative sheet with a moulded wood grain face, supplied in roll form. Give thickness, sheet or roll dimensions, weight per square metre, the minimum bending radius, and the substrate the panel is designed to be fixed to. Where a figure depends on the format being quoted, say so rather than publishing one number that later contradicts the packing list.
The product page at Flexible Wood Grain Cement Wall Panel describes the material as lightweight, water and moisture resistant, non-combustible in its base material, and workable on site by cutting, drilling and bending. Confirm each of these against the batch being supplied, and attach the test documentation your project actually needs — fire performance classification is a per-market question, and the report must be the one your authority or head contractor accepts.
3. Sample board and colour schedule
Ship a physical sample of the exact grain and colour on the schedule, not a printed brochure image. Wood grain reads differently from a photograph once the light hits a corridor at an angle. If the design calls for a painted finish, note that the raw surface is supplied in white and can be finished on site; then state who applies the topcoat, what product is used, and whether that coating is inside or outside our scope.
4. Substrate, fixing method and detail drawings
Flexible cladding is only as good as the wall behind it. Include a typical fixing section: substrate preparation, adhesive or mechanical fixing, edge trims, internal and external corners, expansion allowance, and how the sheet wraps an arch or a column. Mark the minimum radius you will warrant for bending, and show how returns are handled at reveals and skirtings.
For curved work, attach a setting-out drawing that shows the radius against our stated bending limit. If the design radius is tighter than the panel allows, raise it in the submittal as a query — this is exactly the point where rigid boards fail and where a bendable mineral sheet earns its place.
5. Installation method statement
Write the sequence out: site survey and dimensional check, substrate moisture and flatness check, cutting and dry fit, fixing, joint treatment, finishing, protection. Name the tools, the adhesives or fixings, ambient temperature limits, and what makes a substrate acceptable. Our Installation & After-sales Support service covers on-site installation, inspection and snags, so the method statement should match what our own crews will actually do.
6. Packaging, quantity and delivery plan
Because the panels roll, packaging and freight are part of the technical story. Show how the goods are packed, what container or pallet arrangement is proposed, quantities per area, spare allowance for cuts and breakage, and the delivery split by zone. This ties directly to our Logistics & Door-to-Door Delivery arrangements, including freight forwarding, customs paperwork and container loading. Confirm Incoterms, duties and transit time for the specific destination in writing rather than carrying over figures from another job.
7. Comparable project references
Reviewers approve materials faster when they can see the same product working on a similar building. Our Project Cases page lists villa and hospitality work in Sydney, Melbourne, Perth and North Turramurra, along with commercial interiors. Attach the references that match the project type, and state the scope honestly — the case listing alone does not describe every trade we performed on site.
8. Warranty, care and what is excluded
State the warranty period we are offering for this supply, what it covers, and what voids it — substrate movement, unapproved adhesives, coatings applied by others, or impact damage. Add a short cleaning and maintenance note so facilities staff do not strip a finish with the wrong product.
9. Commercial terms and lead time
Include the quotation with unit rates, currency, validity period, payment terms, production lead time from confirmed drawings, and the named contact who answers technical queries. Where a finish needs prototyping before volume production, our Custom & OEM Service covers bespoke finishes and material selection — say in the submittal whether custom colour or grain work is assumed, because that changes the lead time.
A short pre-submittal checklist
- Product name, project reference and schedule-of-finishes line item all match
- Thickness, weight, roll size and minimum bending radius stated for the quoted format
- Fire and moisture documentation attached is the version this market accepts
- Physical sample of the exact grain and colour shipped with the package
- Fixing sections, corner details and curved setting-out drawings included
- Installation sequence, acceptable substrate conditions and site limits written out
- Packaging, quantities, spares and delivery zones confirmed against the drawing pack
- Warranty terms, exclusions and maintenance note stated in plain language
- Open queries listed rather than left for the site team to discover
If you are specifying flexible cladding for a villa, hotel or commercial fit-out, send us the finish schedule and the drawings and we will build the submittal pack around them. As a one-stop furniture and building materials supplier, SANTERSON handles material selection, production, documentation and delivery through one coordination channel — start at the Contact page with your project location and areas of cladding.
Test documentation, fire classification, warranty terms and lead times are confirmed per project and per destination market. Figures quoted in a submittal should always be the ones issued for the specific batch being supplied.