A quotation request for an outdoor swim spa usually gets one of two answers. If the enquiry only names a model number, you receive a price and nothing else. If it states how the unit will be used, what the site can supply and which options matter to you, the supplier can quote a complete configuration: shell, equipment set, electrical assumptions, delivery terms and installation support in one document. The difference is usually half a day of work on your side, and it removes most of the price surprises that appear later.

Below is the information we ask buyers to put in a request for quote when the product under discussion is Outdoor Swim Spa WS-PC07ST-S, a configurable swim-and-hydrotherapy unit from our swimming pool range. The same checklist works for the closely related WS-PC07ST and the longer WS-PC07ST-L.

1. The model reference and the shell size you can actually site

Name the exact model in the first line of the enquiry, because the suffix changes the equipment list and the footprint. In our catalogue WS-PC07ST-S is listed at 7000 × 2400 × 1470 mm, while WS-PC07ST-L is listed at 7490 × 2400 × 1470 mm — the same width and depth, a longer shell. Treat those figures as catalogue dimensions and confirm them against your prepared base, not the other way round.

Send us three measurements with the model number: the clear internal length and width of the plinth or pad you intend to build, the width of every access route the shell has to pass along on delivery day (gate, side passage, garage opening, turning radius), and the position of the nearest power supply relative to the plant area. A 7 m shell that fits the garden but cannot get through a 900 mm side gate is a specification error, not a logistics problem, and it is far cheaper to fix at quotation stage.

2. How the spa will be used — this decides the equipment set

Tell us whether the unit is for daily swim training, for hydrotherapy and relaxation, or for both. The catalogue specification for WS-PC07ST-S lists one control system, one swim training system, one filter pump, six water jets, four LED lights and a total power figure of 6.55 kW, with water jets, LED lighting, ozone and a swim training system shown as features. If your household or your project's guests will mostly sit in the jets rather than swim against the current, say so — we can rework the configuration instead of quoting a swim-first build you will not use.

Also state the intended water temperature band and how many months a year the unit is expected to run. That single line determines whether a heat pump belongs in the quote and how much insulation is worth specifying.

3. Options you want priced, and options you do not

Catalogue-listed extras for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps; an automatic cover is shown as an option on WS-PC07ST-S. Availability and compatibility vary by model, so ask for each item as a separate priced line rather than a bundled "full package". That way you can delete the lines you do not need without re-quoting the whole project.

For comparison, if your site calls for a non-standard footprint — an oval, curved or recessed installation — the Customizable Shape Outdoor Spa page is the right place to start instead, and we quote those on drawings rather than on a model number.

4. Site services: power, base, crane, water fill and drainage

Be explicit about what your side will provide. In most projects the buyer handles the reinforced concrete pad, the dedicated electrical supply with the protection device required by the local electrician, the initial water fill, and a drain or pump-out route for maintenance. We handle manufacture, packaging, freight and — where the project scope includes it — on-site installation and inspection. State clearly which of those you want us to cover, because an enquiry that assumes everything is included and a quotation that assumes nothing is are not comparable.

Include your local supply details: single-phase or three-phase, voltage and frequency. If the electrical requirements for a chosen configuration are unclear on your side, write that too; we will flag which items in the specification need confirming before production rather than after order.

5. Delivery terms, destination and access

Give the delivery address with a postal code, tell us whether the site is residential or commercial, and say whether a truck can approach the property directly. Our service covers freight forwarding by sea, air and rail, export paperwork, packaging and container loading, shipment tracking and door-to-door delivery, so the more precise the destination and access information, the more accurate the landed cost we return. If you normally buy on your own Incoterms — FOB, CIF or DDP through your own forwarder — say which one, and tell us whether you want cargo insurance quoted with the shipment.

For villa and hospitality projects that also involve furniture, flooring, cabinetry or finishes, it is worth sending the swim spa enquiry together with the wider turnkey project scope. One coordinated package lets us consolidate containers and align production stages instead of shipping a spa on its own.

6. Documents and decisions that should be settled before order

  • The configuration sheet, signed back with the options you accepted and the ones you removed.
  • Confirmation of included equipment and electrical requirements for the selected build — model listings vary, so this is the line item worth reading twice.
  • Your preferred payment stages and production schedule, matched to the site programme.
  • The installation and after-sales scope you want: on-site installation, inspection and snags, spare parts, warranty terms as written for your configuration.

If custom work is involved — a bespoke shape, a different finish, branding, or a quantity beyond a single unit — send drawings or reference photos with the request and mark it as an enquiry under our Custom & OEM service. Prototyping and material choices change both price and lead time, so they should appear in the quotation from the start.

A short enquiry template you can copy

Model reference; intended use (swim training / hydrotherapy / both); site measurements for pad and access routes; supply details (phase, voltage, frequency); options wanted as separate lines; services you expect from us versus your own contractor; delivery address with postal code and Incoterms; target installation month; drawings or photos if custom work is involved.

Send that through our contact page and the first response we return is a configuration you can compare against other quotes line by line, rather than a single number with assumptions buried underneath it.