Outdoor Swim Spa WS-S06CT-L is the longest unit in a narrow, six-metre-plus family of swim and hydrotherapy cabinets: 6670 × 2380 × 1400 mm, with a swim training system, 31 jets, four LED lights, temperature setting, ozone sanitation and a catalog total power of 8.35 kW. Those numbers make it an easy specification to approve on paper — and an equally easy one to regret once the site plan, the electrical intake and the delivery route have been compared against what was actually ordered.

If you are a builder, landscape contractor, villa developer or procurement lead putting this model into a tender, the useful question is not whether WS-S06CT-L exists in a catalogue. It is whether it is the right member of that catalogue. Below is how we would evaluate it against the alternatives in our own swimming pools and swim spas range, and what to confirm before a single unit is produced.

Start from the site constraint, not the model number

Every alternative decision in this product family is driven by three physical questions. Write the answers down before you look at jet counts.

  • What length can the site actually receive? The narrow-cabinet family runs from about 5,800 mm to nearly 12,000 mm in overall length. A unit that fits a terrace plan on a drawing sheet still has to pass gates, corners and lifting access.
  • What width do you need to sit or swim in? The narrow bodies above are 2,200–2,500 mm wide. Wider cabinets change both the swimming experience and the deck footprint.
  • What is the cabinet for? Continuous swim training, hydrotherapy seating, or a mix of the two. Models that list a swim training system and models built around water features are not interchangeable, even when their length looks similar.

What WS-S06CT-L actually specifies

As published on the product page, WS-S06CT-L carries one control system, one swim training system, one water pump, one filter pump, 31 jets in total, four LED lights and a catalog total power of 8.35 kW, with water jets, temperature setting, LED lighting, ozone and a swim training system shown as features.

Two things stand out for procurement. First, the swim training system is listed as included, so this is a swimming-first cabinet that also offers massage seating — not a spa seat with a jet aimed at you. Second, the single water pump and single filter pump arrangement means the equipment set is compact rather than duplicated; anything beyond it (heat pump, UV sterilisation, sand filtration, additional insulation, steps) is an option to be quoted, not an assumption to be carried into a fixed-price tender.

The closest alternatives, side by side

Every model named below is one we manufacture and can quote. Each row links to its product page; figures are the catalog dimensions and equipment shown on that page.

Model Catalog dimensions (mm) Swim training system Jets / pumps / LED Total power
Outdoor Swim Spa WS-S06CT-L 6670 × 2380 × 1400 1 set (listed) 31 jets; 1 water pump, 1 filter pump; 4 LED lights 8.35 kW
Outdoor Swim Spa WS-S06CT 5880 × 2380 × 1400 1 set (listed) 31 jets; 1 water pump, 1 filter pump; 4 LED lights 8.35 kW
Outdoor Swim Spa WS-S06B-T 5800 × 2200 × 1420 1 set (listed) 40 jets; 1 water pump, 1 filter pump; 3 LED plus 26 small LED lights 8.75 kW
Outdoor Swim Spa WS-S07B-T 7000 × 2200 × 1365 1 set (listed) 44 jets; 1 water pump, 1 filter pump; 3 LED plus 26 small LED lights 8.75 kW
Outdoor Swim Spa WS-S06C 5880 × 2380 × 1400 Not listed on this model's page 33 jets; 3 water pumps, 1 filter pump; 2 LED lights 9.95 kW
Outdoor Swim Spa WS-S08CT 8000 × 2400 × 1420 1 set (listed) 35 jets; 1 water pump, 1 filter pump; 6 LED lights 8.35 kW
Outdoor Swim Spa WS-S06M 5900 × 2200 × 1610 Not listed on this model's page 48 jets plus 4 water columns; 2 water pumps, 1 filter pump; 17 LED lights 6.95 kW
Outdoor Swim Spa WS-S06 5820 × 2220 × 1110 Not listed on this model's page 56 jets plus 4 water columns; 2 water pumps, 1 filter pump; 2 LED plus 18 small LED lights 6.35 kW
Outdoor Swim Spa WS-SP500 5000 × 2500 × 1600 1 set (listed) 6 jets; 1 filter pump; water pump not listed on this model's page; 4 LED lights 9.35 kW
Outdoor Swim Spa WS-PC08ST-L 8490 × 2400 × 1470 1 set (listed) 6 jets; 1 filter pump; water pump not listed on this model's page; 4 LED lights 6.55 kW
Outdoor Swim Spa WS-S12-T 11740 × 2200 × 1470 1 set (listed) 73 jets; 2 water pumps, 1 filter pump; 1 LED plus 50 small LED lights 7.65 kW
Catalog dimensions and equipment counts are transcribed from each product page for the standard configuration. Confirm included equipment and electrical requirements for the exact configuration you are ordering before you issue drawings to a civil or electrical subcontractor.

Same equipment, longer shell: WS-S06CT

WS-S06CT shares the 2380 mm width and 1400 mm depth, and on the published pages it carries the same equipment set — one swim training system, one water pump, one filter pump, 31 jets, four LED lights, 8.35 kW total power. The difference is roughly 790 mm of length: 5880 mm against 6670 mm.

That single dimension is usually the whole decision. Where a tight terrace, an existing deck footprint or a lifting route makes the extra length expensive to deliver, WS-S06CT does the same job in a shorter cabinet. Where the client wants meaningful uninterrupted swim length — lap work, drill sets, rehabilitation walking against the current — the additional shell on WS-S06CT-L is what they will use every day. Compare the two pages directly: WS-S06CT and WS-S06CT-L.

More jets in a shorter, narrower body: WS-S06B-T and WS-S07B-T

If the brief is hydrotherapy-first with a swim current as a secondary requirement, the B-T variants are worth pricing. Both list a swim training system, both run 8.75 kW, and both carry more jets than the CT models — 40 and 44 respectively — in narrower 2200 mm bodies at slightly greater depth (1420 mm and 1365 mm). They also show more small LED lights.

The trade is width. A 2200 mm cabinet gives a tighter swim channel than a 2380 mm one, which matters if the user is a tall swimmer or if the seating zone needs to serve two adults at once. Choose the B-T models when jet density and a narrower footprint matter more than shoulder room.

Spa features instead of a swim current: WS-S06C, WS-S06M, WS-S06

These are the models clients most often mistake for near-equivalents. They are not. On their published pages, none of them lists a swim training system. Instead they build around jets and water features: WS-S06C with 33 jets across three water pumps at 9.95 kW; WS-S06M with 48 jets plus four water columns in a deeper 1610 mm shell at 6.95 kW; WS-S06 with 56 jets, four water columns and a waterfall in a shallow 1110 mm cabinet at 6.35 kW.

For a wellness-led programme — cold-hot contrast, seated massage, children's play depth — these are the better fit and often the cheaper build. For anyone who intends to swim against a current, they are the wrong answer regardless of how attractive the jet count looks on a comparison sheet.

More length and width: WS-S08CT

Where the site allows it, WS-S08CT extends the same idea to 8000 × 2400 × 1420 mm, keeps a listed swim training system, and stays at 8.35 kW total power with 35 jets and six LED lights. It is the natural step up when two people need to use the cabinet at once — one swimming, one in the seating zone.

A different construction brief: the custom-shape range

When the architecture, not the client, sets the shape — a curved terrace edge, a circular courtyard, an inset installation into a spa deck — our customizable shape outdoor spa is specified instead of a fixed catalog cabinet. It is built with an acrylic shell and balanced structural reinforcement and can be produced in square, round, oval or curved plans to suit the space.

Five checks that decide the specification

  • Confirm the swim training system is on the line for your model. It is listed on the published page for WS-S06CT-L and the other -T variants, and not listed on several same-length models. Never infer it from the length.
  • Reconcile total power against the supply. The catalog figures above run from 6.35 kW to 9.95 kW, and longer cabinets in the wider range are specified at higher totals still. A cabinet that is right on dimensions can still be wrong for the available intake, protection and cabling route — confirm the electrical requirement for the selected configuration with your engineer.
  • Priced options are quoted, not assumed. Control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps appear as catalog-listed options whose availability and compatibility vary by model. Put them in the quotation line by line.
  • Match depth to users. Depth across this range varies widely — about 1,110 mm on WS-S06 against 1,610 mm on WS-S06M. That single number decides whether the cabinet works for adults, children or seated hydrotherapy.
  • Check delivery before you lock the length. Overall length is the constraint that turns a good specification into a crane day — the models above span 5,000 mm to nearly 12,000 mm. Confirm the access route for the longest unit you are considering.

How this fits a wider villa or resort package

Swim spas rarely arrive alone. On villa and resort packages we supply the cabinet alongside poolside lounging, dining and shading from our outdoor furniture for villas and resorts, together with interior fixtures, wall and floor finishes and lighting for the adjoining spaces. Coordinating one supplier across the wet areas, the deck furniture and the interiors keeps finishes, schedules and site handover on a single document set — which is the point of our turnkey villa furnishing service, from design consultation and material selection through production, logistics and installation.

The short version. Specify WS-S06CT-L when the site can receive a 6670 mm cabinet and the brief is genuine swim training with hydrotherapy alongside. Step down to WS-S06CT when the same equipment set has to fit a shorter delivery route; step across to the B-T variants for higher jet counts in a narrower body; and drop the swim current entirely in favour of WS-S06C, WS-S06M or WS-S06 when the programme is spa-led. Every figure above is a catalog value for a standard configuration — confirm equipment and electrical requirements for the exact build before you tender.

Send us the site plan, the available power supply and the intended use, and we will return a configuration sheet with dimensions, included equipment and options priced line by line.