Wall panels are specified early, installed late and inspected closely. A panel that reads beautifully on a mood board can still fail on site if the dimensions, substrate, finish and fixing method were never agreed in writing. Before a wall panel system goes into production, buyers should walk through the options below with the supplier and record every decision in the drawing set.
1. Substrate and material family
The same visual effect can be achieved through very different materials, and each one behaves differently on a wall. Our catalogue covers rigid decorative sheets, composite aluminium panels and thin bendable mineral sheets, so the first conversation is about what sits behind the surface.
- Modern Decorative Wall Panel for Interior Decoration — lightweight interior sheets that reproduce stone, wood and fabric effects, cut and assembled on site.
- Aluminium Honeycomb Panel for Building Exterior & Interior Wall Cladding — aluminium face sheets over a honeycomb core, chosen when large flat modules and outdoor exposure matter; a stone veneer surface is available.
- Flexible Wood Grain Cement Wall Panel — a bendable mineral sheet with a moulded timber surface, supplied on rolls for arches, curved walls and shaped structures.
- Flexible Rock Stone Wall Panel — the same flexible format with a rugged stone texture, used on feature walls and facades where real stone would be too heavy.
Ask which material the supplier actually recommends for your exposure condition, and whether the finish is factory-applied or finished after installation. For a project mixing interior feature walls with external cladding, expect two different product families rather than one board used everywhere.
2. Dimensions, module size and tolerance
Standard stock sizes are rarely the right answer on a fitted project. Our Wall Panel Systems and the wider paneling collections are made to measure, so the specification needs the actual set-out rather than an average room dimension.
- Panel width, height and thickness for every wall, including short return panels that installers tend to cut on site.
- Module rhythm — where joints fall relative to doors, reveals, skirting, architraves, switches and any built-in furniture.
- Tolerance allowance against the substrate. Concrete, plasterboard and timber framing rarely match architectural drawings exactly.
- Cut allowances for outlets, air grilles, handrails, joinery lines and service access panels.
For a made-to-measure order, site-verify dimensions after the substrate is complete. A panel produced from design-stage drawings against an unfinished wall is one of the most common causes of on-site rework.
3. Surface finish, colour and texture
Finish decisions are where a sample earns its keep. Our Luxury Decorative 3D Wall Panel range is offered in custom size, colour and pattern, and the paneling collections include matte lacquer, textured, glass and glossy, stone and marble, and wood veneer surfaces. Agree the following before production:
- The reference standard for colour — a physical sample, an existing panel from another phase, or a written code.
- Sheen level and how it interacts with lighting. A matte surface hides fingerprints on a corridor wall; a glossy surface reflects light fittings.
- Grain direction and pattern repeat across adjoining panels, especially for wood-look surfaces.
- Whether the raw surface may be painted on site. Some flexible mineral sheets are supplied in a white raw state for exactly that reason.
Order physical samples of the selected finish and approve them against the actual lighting condition, not a render. Photograph the approved sample and attach it to the purchase order.
4. Edge detail, joints and how panels meet other trades
Detailing questions are cheap in an email and expensive on site. Settle these before tooling is set up:
- Inside and outside corner treatment — mitred, boxed, or a purpose-made corner profile.
- Expansion allowance between modules and at perimeter abutments.
- Trims and end caps at reveals, floor lines and ceiling lines, and who supplies them.
- Interface with flooring, plaster, joinery and lighting: which trade closes the gap and to what line.
5. Fixing method and substrate preparation
Panel weight dictates the fixing strategy. Light interior sheets are cut and fixed with simple site tools; a large aluminium honeycomb module for a facade needs an engineered support system agreed with the façade or structural engineer. Confirm adhesive type, mechanical fixings, subframe material and spacing, whether the substrate must be levelled or primed first, and access requirements for anything behind the panels.
Also confirm who installs. Our installation service covers on-site fitting, inspection and snagging, but many buyers use their own trades. If local labour is installing, request the fixing detail drawings and a written installation sequence in English before shipment, so the site team is not improvising.
6. Customisation beyond the panel itself
Where wall panels sit inside a wider fit-out, buyers can extend the same finish into adjoining elements through our Custom & OEM Service. That page describes bespoke material and finish selection, prototyping, flexible minimum order quantities and brand marking such as engraving or embossing. Practical options to discuss include:
- Continuing the panel surface into niches, integrated doors and joinery reveals for a flush, uninterrupted wall.
- Matching veneers or surfaces across cabinetry and panelling supplied in one shipment.
- Private labelling or packaging when panels are resold under your own brand.
- Prototype or mock-up panels before the full production run.
Confirm current capability, minimum order quantity and lead time for each option on your specific enquiry. Not every finish is available in every format, and availability changes with production scheduling.
7. Packaging, shipment and sequencing
Rigid panels are bulky; flexible mineral sheets can be rolled, which reduces the volume they occupy in a container and simplifies handling on site. Decide panel-by-panel which format suits the design, then plan the delivery around the installation programme: wall panels that arrive before the substrate is finished become a storage problem and a damage risk. Our logistics service handles freight by sea, air and rail, packaging and container loading, customs documentation and door-to-door delivery. Confirm Incoterms, insurance cover and the receiving arrangement at each site for your order.
8. Documentation to request in writing
Before releasing production, collect from the supplier: an approved shop drawing with set-out and levels; a signed-off finish sample reference; the fixing detail and subframe specification; packing list by wall or room; and the installation sequence. Any performance claim you intend to rely on — fire behaviour, moisture resistance, weathering — should be confirmed for the exact product and configuration you are buying, since these properties differ between our rigid, composite and flexible panel families.
Bringing it together
Buyers who treat wall panel systems as a coordination package rather than a surface purchase avoid most of the costly surprises. Settle material family, made-to-measure dimensions, finish reference, edge detailing, fixing method and delivery sequence in one round of correspondence, and let production start only once those answers are on paper. Send us your drawings and we will return a specification for review before anything is manufactured.
SANTERSON — furniture and building materials manufacturer, one-stop project supplier. Phone / WhatsApp: +86-13928214007 (PHILLIP) · Email: santerson@qq.com · Enquiries: Contact Us