When a design intent calls for rugged stone on a curved wall, an arch or a column wrap, most procurement teams hit the same wall twice: real stone is heavy and rigid, and rigid cladding cannot follow a radius. A flexible rock stone panel solves both problems at once — it carries the texture of natural rock in a thin mineral sheet that bends, rolls and fixes to shaped surfaces. But specifying it well takes a different information set than ordering rigid slabs. The list below is what our project team needs from you to turn a drawing into a priced, shippable panel package.

1. Wall geometry: flat area plus every radius

Flexible panels are chosen precisely because the substrate is not flat, so geometry drives the whole quotation.

  • Total flat cladding area in square metres, taken from elevations rather than floor plans.
  • The radius of every curved run — inside or outside — and whether the curve is a single sweep or a compound shape. Give the radius to the drawing dimension you already have; no survey is needed at enquiry stage.
  • Whether arches, columns, fire surround reveals or bulkheads are part of the same scope, since these generate cut waste that flat area alone does not show.
  • Corner and reveal details: mitred external corners, or a butt joint with a trim profile.

2. Interior or exterior exposure

The same base panel is used indoors and out, but the fixing method, adhesive and joint detailing change with exposure. Tell us whether the surface sits inside a conditioned space, under an eave, or fully exposed to rain and sun. For facades we also need the substrate behind the panel — cement render, fibre cement board or existing masonry — because the panel bonds to a sound, flat base rather than replacing it.

3. Texture and colour reference

Rock-stone panels are moulded from natural surfaces, so the pattern you see on a sample matters more than a colour code. Send us a reference image of the stone face you want — split-face, rough-cast, layered sedimentary or weathered — and state whether the finish should stay in the mineral tone or be custom surface painted to a Pantone or RAL value. Custom painting is available; we produce from your approved sample rather than from a screen proof.

4. Substrate, fixing and local applicator

On site the panel is cut, drilled and bent with ordinary tools and fixed to the prepared base with tile adhesive. That means your local tiling or drywall contractor can install it, which is why we ask early who is applying the material. If your project uses its own trades, we supply panels, technical fixing guidance and joint detailing. If you prefer a finished wall, tell us at enquiry stage so the scope is quoted accordingly.

5. Quantities, phasing and packaging

Because the material rolls, it ships in far smaller volume than rigid stone for the same wall area — a point that matters on villa and hotel projects where freight is the constraint. Still send us: total square metres by zone, any phased delivery schedule tied to site access, and the destination port or door address. Phasing information lets us group curved-run cuts with the flat runs they close off, instead of shipping two partial batches.

What we need from you — a short checklist

  • Elevations with cladding areas, marked by zone
  • Radius dimensions for each curved run, arch or column
  • Interior / exterior classification and substrate type per zone
  • Stone-face reference image plus finish decision (mineral tone or custom paint)
  • Total quantity, phasing plan, delivery address
  • Who installs: your trades or a supplied fit-out scope

Send drawings in PDF or DWG. Where a radius is not dimensioned on the drawing, a photograph of the curved element with a tape measure across its face is enough for us to advise on feasibility before you commit to a detail.

Related flexible cladding in the same range

If the project needs a different surface language, two other bendable mineral sheets share the same fixing logic and can be mixed on one wall scheme. The flexible wood grain cement wall panel reproduces timber figure on a cement-based sheet for curved feature walls and facade reveals where real timber cladding would need fixing battens. The MCM flexible rammed earth panel reproduces the strata of traditional rammed earth, a common choice for restaurants, homestays and cultural projects wrapping columns and barrel-vaulted surfaces.

Where the wall is flat and the requirement is a finished joinery surface rather than a stone face, our wall panel systems are made to measure with selected materials and finishes. For projects combining cladding with other fit-out packages, our turnkey solutions cover design, custom production, door-to-door delivery and installation support under one coordination scope.

Send your elevations, radii and a stone-face reference, and we will confirm panel feasibility for each curved run and return a quotation with quantities by zone. Email santerson@qq.com or reach us on WhatsApp +86-13928214007 to start the review.