The Outdoor Swim Spa WS-SP500 is one of the more compact formats in our configurable swim and hydrotherapy range, with catalogue dimensions of 5000 × 2500 × 1600 mm. On a drawing it looks settled: the shell fits a villa terrace, a resort pool deck or an apartment rooftop setback, and the equipment list is short enough to review in one sitting. What decides whether the finished spa looks and works as intended is a second list — the finish details that never appear in a model number. Below is the checklist we ask project buyers, contractors and designers to close out before a WS-SP500 order goes into production.
Why finish confirmation matters more on a swim spa than on a site-built pool
A conventional in-ground pool is finished by the contractor on site. A Swimming Pool and Swim Spa unit of this type arrives as a manufactured product: shell, cabinet surfaces, steps, lighting, plant and controls are fixed in the factory, shipped, then set and connected. Anything left unspecified at order stage gets decided by someone else, usually late and at the site's expense. That is why we treat finish confirmation as a formal step that sits between the quotation and the production release.
1. Shell interior: colour, surface texture and how the water reads
Confirm the interior shell colour and its finish — gloss level and texture — against the physical sample you approved, not a screen image. The same pigment reads lighter or darker depending on shell depth and site light exposure. With 1600 mm of overall height, the waterline band is visible from the coping, so edge colour matters as much as basin colour. Ask for the finish to be named in writing, state whether it is a standard option or bespoke, and confirm which sample reference the production order carries.
2. Cabinet and exterior cladding: the face you actually see
The outer shell is the visible join between the spa and your paving, decking or planter box. Confirm the cladding material, colour and board direction, and whether the cladding wraps all four sides or only the exposed faces. On a terrace where one side abuts a wall, a partial wrap saves cost; on an island installation a full wrap is what you want. Mark this on the drawing, with the side carrying equipment access clearly identified.
3. Steps, coping and edge details
Steps appear among the catalogue options for this range, alongside insulation, sand filtration, water pumps, heat pumps, UV sterilisation and control systems. Decide early whether steps are integrated into the shell or added as a separate element, because that choice changes the footprint you reserve on site and the height of the finished edge. Confirm the slip texture of the step surface and how the coping meets it — a mitred, flush detail is what makes an integrated spa read as built-in rather than dropped in.
4. Jets: count, position and trim finish
The WS-SP500 specification shows six jets in total. Jet count on its own is not a decision; jet layout is. Confirm the position of each jet relative to the seating and lounger ledges, because a jet aimed at an empty stretch of shell does nothing for the person using it. Then confirm the trim finish — chrome, dark or shell-matched — since a contrasting trim becomes a visible design element once the water is still.
Two configurations share this footprint. Outdoor Swim Spa WS-SP500-MS lists 29 jets and a water pump, against the WS-SP500's six. If your brief calls for a massage-led spa in the same 5000 × 2500 mm envelope, compare both before you lock the jet layout.
5. Lighting: fixture count, colour mode and control grouping
Four LED lights are shown in this specification. Confirm where they sit — spaced along the long sides or clustered at one end — and whether they run on a single circuit or can be grouped separately from the water features. Decide now whether you want fixed white, a colour-changing mode with a preset scene, or dimming tied to the same control as the poolside lighting. Re-grouping controls after installation is where budgets quietly grow.
6. Swim training system: setting and access
The swim training system is listed as one set in this specification. Confirm the counter-flow unit's mounting position, its adjustment range, and how it is reached for servicing. For a lap-swim brief, ask what flow setting the unit is commissioned to at handover and who sets it — our team, your plumber, or both on site.
7. Water treatment: ozone plus whatever you add to it
Ozone appears in the features shown for this model. Ozone is a sanitising layer, not a complete regime, so confirm what it is paired with: filtration type, whether sand filtration or UV sterilisation is added, and where the filter pump sits relative to the access panel. Settle dosing arrangements and routine maintenance clearances at the same time as finishes. Access panels look neat only when they are planned around the equipment rather than cut to fit afterwards.
8. Power, control system and the commissioning record
Total power for this specification is 9.35 kW, with one control system listed. Treat that figure as the starting point for your electrical designer rather than the final one: adding a heat pump or water pump changes the load, and the WS-SP500-MS variant is rated at 11.55 kW, which shows how far equipment options move the number. Confirm supply voltage and phase for the delivery country, circuit protection, cable route and isolator position before the slab is poured. Ask for the commissioning sheet at handover, recording the settings each system was left on.
9. The documentation pack to hold before production release
Before we release a unit to production, we ask the buyer to sign off a short pack: the dimensioned setting-out drawing with access sides marked; the named shell and cladding finishes with sample references; the layout drawing for jets, lights and the swim unit; the equipment schedule stating exactly which pumps, filters and treatment options are included; and the electrical schedule for the destination site. Whatever is missing from that pack is what gets argued about on site.
How the spa finishes sit inside a wider fit-out order
Spa finishes rarely stand alone — paving, screens, pergolas, loungers and poolside joinery all meet the same edge. Coordinating them in one order is simpler than reconciling four suppliers on site, which is the purpose of our Custom & OEM Service: bespoke finishes and materials are specified once and produced together. Our Installation & After-sales Support then covers on-site inspection, snags and spare parts, so the finish list you signed off is the finish list handed over.
If you are specifying a spa for a villa or hospitality project, send us the setting-out drawing and the equipment schedule you have been given. We will mark up which finish and configuration decisions remain open on the WS-SP500 — including whether the -MS variant suits your brief better — and return a specification sheet your team can sign off.