A swim spa of this size is a factory-built product, not something you pick off a shelf. Before you send a purchase order to an overseas supplier, the real work is confirming what the catalogue actually promises and what your site needs around it. This guide walks through sourcing the Outdoor Swim Spa WS-130CⅨ-U from our factory in Foshan, China — model selection, specification confirmation, freight and site preparation.

Know the Model Code Before You Ask for a Price

Our swimming pool range is listed with model codes that look similar, and the difference matters when you compare quotations. Within the 130 series we publish three shell lengths, each offered in two variants:

  • WS-130AⅨ — 8000 × 3000 × 1400 mm
  • WS-130BⅨ — 9950 × 3000 × 1430 mm
  • WS-130CⅨ — 11830 × 3000 × 1430 mm

The WS-130CⅨ is shown in our catalogue with a swim training system, water jets, LED lighting and ozone. The Ⅸ-U version carries the same 11830 mm shell but a different equipment set — see the table below. If two quotations look different, check which variant is being priced rather than assuming one supplier is cheaper.

Specifications Published for WS-130CⅨ-U

ModelWS-130CⅨ-U
Catalogue dimensions11830 × 3000 × 1430 mm
Control system1 set
Water pump4 pcs
Filter pump1 pc
Jet total23 pcs
LED lights5
Total power11.85 kW
Features shownWater jets, LED lighting, Ozone

These figures are transcribed from the product page for this model. The swim training system is not listed in the captured specification block for the Ⅸ-U variant, while it is shown for the WS-130CⅨ. Confirm the equipment list in writing for the exact configuration you order.

What to Confirm in Writing Before Production Starts

1. Equipment included versus optional

Catalogue-listed options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so ask the factory to price each option separately instead of accepting one bundled figure.

2. Electrical supply and power connection

Total power for this configuration is published as 11.85 kW. Supply voltage, phase, circuit protection and the location of the isolator are your local electrician's decisions — send them our connection requirements early so electrical work happens before the shell arrives, not after.

3. Foundation, access and crane path

An 11830 mm shell needs a level, load-bearing base and a clear route from the truck to that base. Confirm the delivery address can take the vehicle, and check gate widths, overhead lines and any terrace or roof-load limits on your side before we book the container.

4. Water treatment and drainage

Ozone is listed as a feature on this model; filtration is handled by the filter pump noted above. Agree in advance who supplies the water fill, overflow and drainage connection, and whether sand filtration is added to your specification.

Ordering Through a One-Stop Supplier

We are a China-based furniture and building materials manufacturer working on villa, hospitality and office projects, which means a swim spa rarely travels alone. Poolside outdoor furniture for villas and resorts, pergolas and daybeds, wall cladding, paving and lighting are usually consolidated into the same shipment to reduce freight handling and site coordination.

Our published service scope runs from design consultation and material selection through manufacturing, project management, installation and handover. For a swim spa line we also offer custom furniture design and prototyping where a surround, cover or cabinet has to be built to the shell dimensions rather than bought off the catalogue.

Freight, Documents and Arrival

We arrange freight forwarding by sea, air and rail, together with packaging and container loading, customs paperwork and shipment tracking. Import terms, duties and insurance are decided case by case for each destination, so ask us for a landed-cost breakdown instead of an FOB number alone. Our furniture logistics and door-to-door delivery service covers the journey to site; installation and after-sales support are handled as a separate scope.

Practical sequence: confirm the model variant and equipment list in writing → lock electrical and foundation requirements on site → agree freight terms and documents → book production → plan installation access before delivery day.

Related Products in the Same Range

Browse the full swimming pools and swim spas category for dimensions across the range, then send us your site plan and required equipment list. We will quote the configuration rather than a generic model number.

Tell us the model code, the site city, and which options you want included — control system, heat pump, UV sterilization, insulation, steps — and we will return a specification sheet and landed-cost quotation for that exact build.