A wood-grain wall that wraps an arch, rolls around a column and still reads as timber from a couple of metres away — that is the reason flexible wood grain cement wall panel keeps appearing on hospitality and villa schedules. It also creates a coordination problem: this material is bonded to the substrate rather than framed like a rigid board, so whoever writes the installation plan has to settle bending radii, adhesive coverage and joint detailing before the panels arrive on site. Below is what we ask project teams to resolve before ordering, and what SANTERSON supplies at each stage.
1. A drawing of every surface the panel has to cover
Send a set-out drawing, taken from a site survey where the building is existing work, that marks flat runs separately from curved ones. Note the radius or the direction of curvature for arches, columns, reception desks and feature niches, because a bendable mineral sheet behaves differently when it is wrapped around a tight cylinder than when it drapes over a shallow arch. Record substrate type as well: cement render, gypsum board and existing tiled walls each take a different preparatory coat, and the fixing method follows the substrate rather than the panel.
Two details decide whether the job runs smoothly or turns into on-site improvisation:
- Minimum bending radius per surface. State it as a number on the drawing, not simply as "curved wall". Our technical team reviews each curve against the panel's flexibility and flags any radius that needs a different build-up or a segmented approach.
- Panel orientation and grain direction. Wood grain reads differently when it runs vertically on a tall feature wall than horizontally along a corridor. Mark the direction on the elevation so cut pieces are laid out consistently, and so offcuts from one run do not end up in another.
2. A written decision on colour and finish
The panel is supplied with a moulded wood-grain surface that reads close to real timber while the body stays cement-based, and it is also offered with a white raw surface that can be painted on site once installed. That choice belongs in the plan, not in a site conversation. Decide before production:
- a pre-finished grain colour from our available range, matched to a sample you have approved physically;
- or the white raw surface, with the paint system and applicator named in the plan, including who supplies the coating and where the trial patch goes.
For exterior facades and renovation work on older buildings, we also produce flexible rock stone wall panel with a rugged natural-stone surface, and the MCM flexible rammed earth panel for curved walls that need an earthy, matte texture. If one project mixes wood-grain interiors with stone-look exteriors, list both in the plan so the fixings and edge trims are specified once instead of twice.
3. Adhesive, coverage rate and open time
Flexible mineral sheets are bonded rather than framed. The plan should name the tile adhesive being used on site, state whether it is a cement-based or polymer-modified product, and give the trowel notch size and coverage rate per square metre. This is where budget errors creep in: an installer estimating adhesive for flat walls underestimates what full-coverage bonding on curved runs consumes.
Add three practical lines to the plan:
- Substrate preparation. Flatness, dust, and whether the existing surface needs priming or a levelling coat. Bending a panel onto an uneven wall telegraphs every bump through the finished face.
- Open time and batch sequence. How many square metres one crew bonds per shift, so panels are not left waiting while the adhesive skins over.
- Cutting and drilling on site. The product page notes these sheets can be cut, drilled and bent with simple tools. Name the tooling and the edge-finishing method for internal and external corners before work starts.
4. Joint, corner and transition detailing
Joint treatment is what separates a convincing timber look from an obvious cladding. Specify how panels meet at internal corners, how external edges are finished, and how the sheet terminates against skirting, door frames and joinery. For feature walls that change material partway up — a wood-grain lower band meeting a painted surface above — show the transition strip or shadow gap on the detail drawing.
For curved work, state whether joints are butted, overlapped or run into a recessed reveal, and where the breaks fall so they sit in visually quiet positions rather than at eye level on the apex of the curve.
5. Packaging, handling and logistics notes
Because the material rolls, it packs more compactly than rigid boards of the same coverage — the product page credits rolled packaging with reducing logistics cost, which is one reason projects specify it for international delivery. Handling assumptions change accordingly, so record them: roll or sheet form, package dimensions, container loading plan, and the number of handlers needed to move a roll without creasing it. Where a project orders this panel alongside other finishes from our wall panels and wall cladding range, consolidating them in one shipment reduces freight cost and the number of deliveries the site has to receive.
Our logistics and door-to-door delivery service covers freight arrangements, packaging and container loading, customs paperwork and shipment tracking. Confirm import terms, duties and delivery scope for your specific destination with us in writing before the order is placed.
6. Site conditions, sequence and acceptance criteria
Sequencing causes more cladding problems than material faults do. The plan should say which trades finish first — wet trades, electrical, plumbing, joinery — and when the wall is handed over for cladding. Add a storage instruction: panels kept dry and stored as packaged, flat or upright, and acclimatised on site before fixing in renovation work where the existing building is damp.
Then state how the job will be signed off. For a wood-grain feature wall that usually means grain alignment across joints, no visible telegraphing through the finished face, consistent joint width, and clean edge treatment at openings. Agree those criteria with the main contractor before installation begins; they are far easier to write into the plan than to argue about afterwards.
The product page describes the panel as non-combustible, lightweight and resistant to water and moisture, which is one reason it is specified for corridors, lobbies and areas exposed to damp. What a certifier or head contractor asks for as evidence is project-specific, though. Tell us the application — interior feature wall, exterior facade, old-building renovation, curved reception desk — and we will confirm which panel build-up and which documentation apply to that use, rather than assuming one specification covers every case.
7. Responsibilities and contact points
A plan without names stalls at the first query. List who supplies the panels, who prepares the substrate, who fixes, who inspects, and who answers technical questions during installation. As a furniture and building materials manufacturer working on villa, hotel and office projects, SANTERSON supports that side of the job as well: custom and OEM service for size, finish and texture decisions made before production, and installation and after-sales support once the material is on site.
Send us your elevations with the curved surfaces marked, the substrate type for each wall, and your colour decision. We will return a panel specification, a quantity take-off and the fixing notes your installer needs to price the work properly.