An open concept kitchen is rarely specified as a single item. The cabinetry has to agree with the flooring, the wall finish, the lighting and the seating beyond it, because nothing hides behind a door or an internal wall. That is why open concept kitchen cabinets need a longer conversation at quotation stage than a closed kitchen does. Below are the customisation points we ask project buyers, builders and designers to settle before an open-plan cabinet package goes into production.

1. Layout: where the kitchen stops and the living space starts

In a closed kitchen the cabinets sit inside four walls. In an open plan they become joinery that reads as furniture, so the first decision is not the door panel but the boundary line between cooking and living. Tell us which side of the run faces the sofa or dining table, because that face is usually detailed differently from the working side.

  • Which wall or island carries the sink, hob and preparation zone, and how far the seating sits from them.
  • Whether tall units can run to the ceiling on the visible side, or whether they need a finished return panel.
  • Where appliances sit — under the bench, in a tall housing, or behind cabinet-matched panels.
  • Whether an island doubles as dining, and if so how the overhang and knee clearance are handled.

Send the room drawing with dimensions and ceiling heights. We design the layout around it rather than forcing a standard module into an unusual plan; open plan kitchen cabinetry is made to measure, so a wall that is out of square or a beam at an awkward height can be taken up inside the carcass instead of being filled on site.

2. Door style and hardware: how much visual detail you want

From across a living room, door hardware is the most visible element in a kitchen elevation. Buyers comparing samples up close often miss this, so decide it with a viewing distance of three or four metres in mind.

  • Handleless fronts remove protruding pulls for continuous surfaces, and drawer and door fittings are supplied with soft-close action to reduce noise in shared living space. Some configurations use a touch-to-open mechanism.
  • Framed or shaker-style panels give shadow lines that suit classic and transitional interiors.
  • Glass-front upper cabinets and lit display niches break up a long run, but they show their contents, so decide what goes on display and what stays behind a solid panel.
  • Integrated or concealed doors let a tall pantry unit disappear into the wall lining when the rest of the room is paneled.

Our handleless minimalist kitchen cabinets are built on this principle: base units, wall units and tall pantry units tailor-made to the space, with no protruding hardware. If a project needs that look but with visible pulls for accessibility or habit, we detail it the other way.

3. Panel material, surface finish and colour continuity

Open-plan cabinets sit next to flooring, wall panels and doors, so colour has to be agreed as a set rather than one room at a time. Cabinet layout, panel material, colour and surface treatment are all customised on our side, and the same finish can usually be carried through to wardrobes, media walls and vanities elsewhere in the project so the whole floor reads as one joinery package.

  • Matte solid colours for a quiet, flat surface that reflects very little light.
  • High gloss or lacquered fronts that bounce light back into a shared living area — test them against your lighting plan before committing.
  • Wood-effect and veneer panels, which need deliberate matching against the engineered oak flooring rather than being left to chance.
  • Two-tone schemes: a darker working zone with a lighter or wood-toned front on the living-facing side.

Surfaces are specified for wear resistance, water resistance and easy cleaning, which matters more in an open plan where cooking splatter and handling are visible from the seating area. Ask us for physical panel samples in your selected colours; a colour card on a screen is not a reliable basis for a whole-apartment specification.

4. Storage structure, worktop and splashback

Internal configuration is where an open kitchen either works or ends up with clutter on display. We customise cabinet dimensions and internal partitions, so send the appliance list and the owner's storage habits with your enquiry.

  • Tall housing sized to the selected ovens and refrigerator, with ventilation and electrical requirements confirmed before production.
  • Drawer stacks, pull-out corners, shelf-focused units or tall pantry and utility zones, depending on what the plan can take.
  • Worktop and splashback material specified with the cabinets so edges, upstands and joint lines are detailed in the factory instead of cut on site.
  • Matching hardware — hinges, drawer slide rails, support legs and connecting brackets — supplied with the package so the installer on site is not sourcing parts locally.

5. Lighting built into the cabinetry

In an open plan the kitchen lighting becomes living-room lighting, so it needs a circuit and a switch location agreed with the electrician before the carcass is built. Recessed warm LED strips inside open shelves and glass display cabinets highlight tableware and soften the edge of the kitchen at night; task lighting under wall units belongs to the working zone. Tell us where power for the strips will come from, and we reserve the positions in the panels.

6. Matching fixtures for the rest of the project

Because we manufacture other interior fixtures as well, buyers frequently consolidate the joinery package: custom built-in kitchen cabinets for the units themselves, plus wardrobes, media walls, doors and wall paneling in the same material and finish. One factory, one batch of panels and one set of colour references reduces the risk of a slightly different tone arriving from a second supplier.

7. Hospitality, serviced apartments and multi-unit projects

For serviced apartments, hotel suites and villa developments the same design repeats across many units, so specify it once properly: fixed dimension ranges, a locked colour schedule, defined hardware sets, and a spare-parts list held for maintenance. Panels and finishes are selected for long-term use and simple cleaning, and repeat orders can follow the approved reference instead of being re-specified each time.

8. Drawings, supply sequence and site coordination

Custom cabinetry goes wrong on site over paperwork more often than over materials. Before production we confirm drawings and details with you; after that the sequence is production, packing, freight and delivery, then installation support and after-sales service. As a one-stop furniture and building materials supplier we prepare the drawings, coordinate production and handle the shipping documentation for the package; site guidance can be arranged where a project needs it.

What we ask you to confirm in writing: final room dimensions and floor levels, the appliance schedule with cut-out sizes, the electrical and plumbing set-out, the selected panel and worktop samples, and who signs off the shop drawings. Those five points settle most disputes before they cost anyone money.

What to send with your enquiry

If you want a usable quotation instead of a ballpark, send: the floor plan with dimensions and ceiling heights; elevation sketches or reference images of the look you are working toward; the appliance list; your preferred door style and finish direction; the number of identical units if it is a multi-unit project; and the delivery destination. We come back with a layout proposal, a material and hardware schedule, and pricing against that package.

Send your drawings and appliance schedule to us through the enquiry form on the SANTERSON website, or start from the wider range of Interior Fixtures.