A floating modular system looks simple on a mood board: open shelves, closed cabinets and a lit niche arranged across one wall. The difficulty appears when the drawing reaches the factory floor. Because these units are made to measure rather than picked from a stock list, the quality of your enquiry decides how firm the quotation is and how few surprises arrive later. Below is the information our team works through with architects, builders and procurement managers on residential projects, using Santerson Floating Modular Systems as the reference example.
Start with the wall, not the cabinet
Floating units carry their load through the wall, so the substrate matters before any door style is chosen. Send us:
- A dimensioned elevation of the wall, with overall width and height, plus the position of skirting, cornices, downlights, switches, sockets and any radiator or pipework in the run.
- The wall construction — masonry, stud partition with lining, existing joinery or a new framed box. If the build is still open, tell us whether blocking can be added; that single note changes the fixing detail and sometimes the carcass depth.
- Finished floor level and finished ceiling level, not structural ones. Tolerance differences between the two are what cause gaps at the top of a run.
If you have a 3D model or a set of coordinated drawings, send them as they are. We work from PDF, DWG and most common model exports, and matching your drawing conventions saves a revision round.
Layout and how the units will be used
The same elevation can be built several ways, so we quote against a defined layout. Useful details:
- Which modules are open shelving, which are closed cabinets, and the shelf spacing you expect in each open bay.
- What actually goes on the shelves — books, ceramics, a television, audio components, glassware. A book bay and a display bay are not engineered the same way.
- Door type and swing where cabinets are closed: hinged, sliding, lift-up or handleless push-open, and whether handles are acceptable on the scheme.
- Television size and mounting method if media is involved, together with where the equipment sits and how cables are routed.
Where a living wall has to mix display and concealed storage, Santerson Mixed Open & Closed Systems is the closer starting point; where the run must reach the ceiling with no visible gap, Santerson Floor to Ceiling Modular Systems resolves the head detail differently.
Dimensions, materials and finishes
For every configurable system in this range we list made-to-measure sizing together with material and finish options. To price the job rather than a placeholder, we need:
| Item | What to send |
|---|---|
| Carcass and shelf substrate | Your preference, or the specification line from your schedule. Tell us if a moisture-resistant board is required anywhere in the run. |
| Front finish | Lacquer, veneer, laminate or acrylic, with the colour or grain reference. Where a brand and code exist, quote them; where they do not, send a physical sample or a photograph taken in daylight. |
| Sheen | Matte, satin or high gloss. Gloss shows fingerprints and edge wrapping differently from matte, which affects both cost and detailing. |
| Edge and profile | Matching edge banding, mitred edges, bullnose, or a shadow gap against the wall. State which one your drawing intends. |
| Hardware | Hinge and runner brand if your project has an approved list, soft-close requirements, and loading expectations for drawers. |
If finishes are still undecided, say so and send the room's palette. We can propose two or three configurations at different price points instead of guessing at one.
Lighting, services and load-bearing details
Integrated lighting is where enquiries most often come back incomplete. Please confirm:
- Whether lights sit in shelves, in niches or behind panels, and whether you want a warm or neutral colour temperature.
- Where the driver and transformer will be accessible for servicing, and where the switch or dimmer is located.
- Socket and spur positions relative to the elevation. A unit drawn before electrics are set out usually needs a second drawing round.
- Point loads. Televisions, fireplaces and heavy display pieces need to be identified on the elevation so the carcass and fixings are built for them.
For schemes where lighting is central to the design rather than an afterthought, Santerson Modular System with Lighting (Living System) shows how the cabling and profiles are resolved in the carcass itself.
Commercial and delivery information
The rest of a workable enquiry is administrative, but it changes the number you see:
- Quantities — how many walls or dwellings the scheme repeats across. Repetition allows us to standardise modules and reduce unit cost.
- Project location and delivery address, plus who receives goods on site and whether there is lift access for long panels.
- Your programme: the date the units must arrive, and any trade sequence that fixes it, such as decoration or flooring being completed first.
- Incoterms you want quoted — ex-works, FOB, CIF or door-to-door delivery. Our logistics service covers freight forwarding, customs paperwork and container loading, so tell us which responsibility you want to carry.
- Whether installation is by your own trades or whether you want our on-site installation and inspection support.
- Company details for the proforma: entity name, contact person and purchasing reference.
What happens after you send the enquiry
Our cooperation steps follow a short sequence: project brief and design proposal, then quotation with detail confirmation, then production, shipment and follow-up. From your pack we produce a configuration drawing showing module sizes, shelf spacing, door lines, lighting positions and finish callouts, and price against that drawing. You approve the drawing before anything is cut.
Two habits make the difference between a smooth job and a costly one. First, send the wall as it will be finished, not as it stands today. Second, name the items the system has to hold. Everything else we can work out with you.