An outdoor swim spa is difficult to change once a project has approved it. The shell, the plant and the power supply are fixed by the time the unit arrives, so any correction afterwards means rework on site. Before your team signs off on Outdoor Swim Spa WS-S04B, work through the six confirmations below. Each one is something we ask buyers to close out with us at design stage, because it changes either the price or the specification.

1. Footprint and how the shell reaches the ground

Catalog dimensions for this model are 3900 × 2200 × 1450 mm. Put those numbers on the drawing instead of treating them as a rough idea of size, then check four things:

  • The clear route from the delivery vehicle to the final position, including gate widths, overhead obstruction and the working space needed to lower the shell into place.
  • Whether the spa sits above finished ground level, partially recessed, or inset with an overflow edge. Each option changes the substructure and the drainage detail.
  • The base design. A dry shell is manageable; a filled one is not, so the slab or plinth should be checked by the project's structural engineer against actual site soil conditions.
  • Distance from the spa to the equipment bay. Access panels have to stay reachable for filter and pump servicing for the whole life of the asset, not just at handover.

2. Jet layout and water treatment as specified

The catalog entry for WS-S04B lists water jets, LED lighting and ozone as the featured systems, with 31 jets in total including 6 water columns, 3 water pumps and 1 filter pump. Two points need a decision before approval:

  • What the spa is actually for. A hydrotherapy-led brief, a recreation brief and a lap-swimming brief pull the jet layout in different directions. Tell us the intended use and we will confirm whether this configuration suits it, rather than assuming the catalog default is correct for your project.
  • How ozone fits into your wider water-treatment plan. Ozone supports sanitisation but does not by itself satisfy what a local authority expects for a shared or commercial pool, so agree the dosing and testing arrangement with us at the same time as the equipment list.

Note that the catalog record for this model does not state a swim training system. If lap swimming is part of the brief, raise it explicitly — otherwise you will receive a spa configured for jet therapy and relaxation.

3. Electrical supply and connected load

Total power is given as 10.35 kW in the catalog entry. That figure is the starting point for a conversation with your electrical consultant, not a number to approve on its own:

  • Available capacity at the distribution board, phase configuration and cable route. Check whether adding a heat pump later would exceed what the board can carry.
  • Protection devices, earthing and bonding as specified for the installation. We confirm equipment requirements; compliance sign-off against local wiring rules remains with the project's electrical engineer.
  • Where the control system is located and who operates it. A facility team running the spa on a set schedule needs different control access from a private household.

If heating, insulation or additional plant is under discussion, ask us for the revised power figures for that specific configuration before the electrical design is fixed. A figure quoted for one build does not transfer to another.

4. Which options are in your quotation, and which are not

Catalog-listed optional accessories include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so an option that exists somewhere in the range is not automatically available for this one. Read the table below as the catalog record for WS-S04B — it is where we start, not what you will be invoiced for.

ModelWS-S04B
Catalog dimensions3900 × 2200 × 1450 mm
Control system1 set
Water pump3 pcs
Filter pump1 pc
Jet total31 pcs, including 6 water columns
LED lighting2 pcs, plus 28 small LED lights
Total power10.35 kW
Features shownWater jets, LED lighting, Ozone

Ask for a configuration sheet that repeats this data and then states, line by line, what your order includes. If a figure on that sheet differs from the table above, ask which one applies before you approve anything.

5. Servicing plan and responsibility after handover

Running cost is largely a function of maintenance, so approval should come with an agreed servicing arrangement rather than an assumption:

  • Filtration run times and filter replacement intervals for the installed filter pump, plus who purchases consumables.
  • Insulation and cover arrangements where year-round outdoor use is expected. Insulation is a catalog option, so confirm it appears in your specification if the local climate needs it.
  • Spare parts for pumps, jets, ozone equipment and LED fittings, ordered with the shell rather than after the first failure.
  • Warranty scope and exclusions in writing, together with the support arrangement for your region. Installation and after-sales support are part of our service offering; the exact terms should be confirmed for your project before contract.

6. How the spa fits into the rest of the package

Swim spas rarely arrive on their own. On villa and hospitality projects they normally travel with poolside loungers, shade structures, changing-area joinery, exterior lighting and paving. Coordinating those items with the spa shell prevents two familiar problems: finishes that do not line up at the edges, and deliveries arriving out of sequence so that one trade waits on another.

As a one-stop furniture and building materials supplier, we put that scope into a single production and shipping plan — design consultation and space planning, material and product specification, manufacturing and quality control, then logistics and site coordination. If the terrace is awkward and a standard shell will not sit in it, that is a custom and OEM conversation to have at design stage, well before a standard model has been approved.

Pre-approval checklist

  • Dimensions placed on drawing, with delivery access and servicing clearance confirmed.
  • Base and structural support signed off by the local engineer.
  • Jet configuration matched to the intended use: therapy, recreation or training.
  • Board capacity checked against the configured total power, including any heat pump.
  • Options listed line by line in the quotation, with compatibility confirmed for this model.
  • Maintenance intervals, consumables and spare parts agreed before handover.
Send us the site drawing, the intended use case and your target completion date. We will return a configuration sheet for this model with confirmed equipment, electrical requirements and dimensions for that specific build — and if the site calls for a different shell size or shape, we will tell you before you commit to approval.

Project teams can start with the site drawing and use case through our contact page. Business hours are Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8), and enquiries receive a response within 24 hours.