A rendering of a living room wall tells you what the Santerson Floating Modular Systems should look like. It does not tell a factory what to build. The gap between those two things is where most custom joinery enquiries stall: dimensions that were never measured, finishes named by feel rather than by sample, and storage requirements left implied. Below is the checklist we use to turn a design intent into an enquiry our project team can quote against.

Start with the wall, not the catalogue

Modular living systems are made to measure, so the first item in any enquiry is the opening itself. Give us the full width and height of the wall, floor finish to ceiling line, and note everything that interrupts the run: skirting, architraves, radiators, downlights, switch plates, door swings and any return into an adjacent room. Where a unit has to pass under a bulkhead or around a structural column, a simple sketch with two or three recorded dimensions saves more time than a mood board.

If the wall also carries a television, say so at this stage rather than later. Cable routes, ventilation for equipment and the mounting method all affect the carcass, and it is far cheaper to design them in than to cut them out on site.

Decide how the system will be used before choosing a look

Two rooms can share exactly the same footprint and produce completely different systems. A household that stores books and display objects needs open shelving and load-bearing spans. A household that wants a clean wall needs closed doors, drawers and deep storage hiding behind a flat front. Write down what actually has to live in the unit — glassware, linen, files, toys, record players, a vacuum — and how often each item is reached for.

That decision usually settles itself once you compare the configurations side by side. Where open shelving is the priority, Santerson Floating Modular Shelves is the closer starting point. Where a full-height wall of mixed storage is needed, Santerson Floor to Ceiling Modular Systems gives you a different proportion and fixing logic to price against.

Name the finishes with references, not adjectives

"Grey oak" means four different things to four different suppliers. In your enquiry, group what you want by material family — wood veneer, lacquer, laminate, glass, metal framing — and attach a reference for each: a sample number, a photograph of an existing surface in the property, or a competitor-free image from your own drawing pack. Where a finish has to match something already installed, send a physical sample or state clearly that it must be matched on site.

Also record the surfaces you are matching against: flooring, wall panelling, doors and stone. A floating unit specified in isolation often clashes with the joinery already produced for the rest of the property, and by then the trade packages are locked.

Flag lighting and services early

Integrated lighting changes both the profile and the electrical coordination. Recessed channels, driver access, switching position and dimming method all need a decision before production drawings are issued. If your scheme includes lit niches or shelf lighting, start from Santerson Modular System with Lighting (Living System) and send the electrical drawing alongside the layout, so the transformer location and access panel are designed in rather than improvised.

For any configuration, confirm the dimensions, storage layout, finish schedule and electrical specification of the final version in writing before production is released. That confirmation document, not the original rendering, is what protects the project.

What to attach to the enquiry

  • Room name, wall elevation and a dimensioned sketch or measured drawing (PDF or DWG).
  • The reference product you are pricing — for example Santerson Floating Modular Systems.
  • Finish schedule with sample references for carcass, doors, shelves and any glass.
  • A short note on intended use: open display, concealed storage, media wall or a mix.
  • Electrical requirements, including lighting positions, switching and equipment ventilation.
  • Project type, delivery city, and whether the units are for one property or several repeats.
  • Your programme: site handover date and the date the units must arrive.

Repeat quantities matter more than most buyers expect. A villa with three identical guest suites can be engineered once and produced as a set, which changes both cost and lead-time planning. If your project has repeats, mark them clearly on the drawings.

What happens after you send it

A complete enquiry moves quickly through the same three steps we apply to every custom project: brief and design proposal, quotation with detail confirmation, then production, shipment and follow-up. You receive configuration options and a quotation against the specification you sent, not against an assumption. From there our team handles manufacturing and quality control, door-to-door logistics and site coordination, and installation support at handover.

If you are assembling several product groups for one project — joinery, wardrobes, kitchen cabinetry, vanities, flooring or lighting — send them together. Coordinating the whole fit-out against a single set of drawings keeps finishes consistent across rooms and reduces the number of separate production runs.

Send your brief

Open the product page, note the reference, and send us your elevation drawing, finish schedule and use list. Our project team will come back with configuration options for the space you have measured, so the first number you receive is a real one.

Send your Floating Modular Systems enquiry — SANTERSON, furniture and building materials manufacturer since 2008, China headquarters with offices in Vietnam, Singapore and South Africa.