A 7-metre swim spa is one of the heaviest, most awkward items in a villa or resort order. It travels by sea, changes hands at both ends of the journey, and then has to be lifted onto a slab that was poured for it. Most disputes about these units do not start with the shell or the jets — they start with what arrived, how it arrived, and who was standing at the gate when the truck did. Before you place an order for Outdoor Swim Spa WS-PC07ST-S, settle the packaging questions below in writing. They decide your freight cost, your site-preparation plan and who pays when something is damaged.

In short: for a unit of this size you are not buying a box — you are buying a transport assembly. Confirm how the shell is protected, what the spa ships with (and separately), which container type carries it, what the packing list says, and who unloads and sets it down on your side.

Why Packaging Decides The Cost And Risk Of A Swim Spa Order

The catalogue lists this model at 7000 × 2400 × 1470 mm. Treat that as the starting point for every conversation, not the finished answer: a crated or skidded assembly is always larger than the shell itself, and in ocean freight the outer dimensions — not the water volume — drive whether you can use a shared container or need special handling. Two buyers ordering the identical spa can end up with very different landed costs purely because one accepted a standard stow and the other needed out-of-gauge treatment.

The second reason packaging matters here is that this product line is configurable. The catalogue for WS-PC07ST-S shows water jets, LED lighting, ozone and a swim training system, with an automatic cover listed as an option, while optional accessories such as heat pumps, sand filtration, insulation and steps are offered across the range. Every one of those items has its own packing method, its own handling risk, and its own customs line on the paperwork. A single "spa delivered" sentence in a purchase order cannot cover all of it.

Shell Protection: What To Ask Before Production Starts

The shell is the expensive part and the part that cannot be patched on site. Acrylic and composite shells crack or craze from point loads, and they scratch long before they fail. Ask your supplier, specifically:

  • Edge and corner protection. The rim and the corners of a 7 m shell take the first impact when the unit is slung or slid. Confirm protective padding is fitted to edges and corners, not just a wrap around the middle.
  • Surface facing and interlayer. Ask what sits directly against the finished surface, and whether layers are separated so the wrapping cannot rub during sea vibration.
  • Base support along the full length. A long shell resting on two narrow bearers will flex in the middle. Confirm the support layout under the base, and that the unit is secured so it cannot shift inside its restraint at sea.
  • Weather protection for the crossing. Ocean containers sweat. Ask what keeps moisture off the shell, electrical components and any timber during a multi-week voyage.
  • Lifting points and how the unit is meant to be handled. Ask for the marked lifting arrangement and whether slings must avoid specific zones. Your rigging crew needs this before they arrive, not when they are already on site.

Ask for photographs of the finished packing — top, side, corner detail and securing method — before the container is loaded. This costs nothing and becomes your reference point if a claim follows.

Equipment And Accessories: One Crate Or Several

Never assume that everything you ordered travels inside the spa. Pumps, control systems, swim training equipment, lighting, ozone and sterilisation components, heat pumps and steps each have different handling needs, and some are better shipped loose than fitted.

  • Confirm what is fitted to the unit on arrival and what arrives separately. Loose equipment is easier to inspect and reduces the risk of fittings being damaged in transit, but it also means more items for your installer to reconcile.
  • Ask how loose items are identified. Numbered crates that match a packing list save hours on site; unlabelled cartons guarantee confusion between the spa, the cover and the plant.
  • Check whether optional equipment changes the crate count. A heat pump or sand filtration unit is usually its own package with its own handling requirements.
  • Ask where spare parts sit. If you want spares on site at handover, they should be listed and boxed as spares — not mixed into installation cartons.

Electrical items deserve their own line in the packing discussion

The catalogue for this model shows a total power figure of 6.55 kW, and it also notes that the water pump is not listed in the captured specifications for this model. Do not resolve either point from a datasheet alone. Confirm in writing which equipment is included in your configuration, what supply it needs, and how those components are packed and protected — electrical parts are the ones most often damaged by poor packing and the hardest to prove were damaged before arrival.

Container Type, Dimensions And Load Planning

This is where a 7 m unit forces a decision. A standard general-purpose container has an internal length under 7 m at the narrow end of the range, so a crated assembly built around a 7000 mm shell will not simply roll into one. Ask your supplier how this model is normally loaded, and get the crated dimensions and gross weight in writing before you price freight.

Question to ask Why it matters to your budget
Crated length, width and height (outer dimensions) Outer dimensions, not catalogue shell dimensions, determine container type and whether out-of-gauge surcharges apply.
Gross weight and centre of gravity Drives the crane, forklift or spreader beam your site needs — and whether the local haulier can quote accurately.
Number of packages for the complete order One spa plus separate plant, cover and accessory crates may need two bookings instead of one.
Shared or dedicated container, and how many units per container Multi-unit orders change the loading plan; confirm whether your quantity affects how each unit is restrained.
Loading photographs at the port of shipment Your evidence that the goods were properly stowed before the voyage — useful for any insurance claim.

SANTERSON's logistics service covers freight forwarding by sea, air and rail along with customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. That scope is an advantage only if the packaging details above are agreed before production. Confirm Incoterms, what the quoted price includes at each end, and whether cargo insurance is part of your quotation or something you arrange yourself — terms and coverage should be settled case by case for your destination, not assumed from marketing material.

The Packing List Is A Procurement Document, Not An Afterthought

Customs clearance runs on the packing list and commercial invoice; so does your own inspection. Ask for a draft of both before shipment and check that they match what you actually ordered.

  • Model designation matches the order. The order, the crates and the paperwork should all say WS-PC07ST-S with your configuration, so a customs officer and your site team read the same thing.
  • Package count, marks and weights per package. Individual weights let your rigger plan; a single total weight does not.
  • Every accessory and option itemised. Automatic cover, steps, heat pump, filtration — each should appear as its own line if it is its own package.
  • Supporting documents confirmed early. Certificates of origin and import permits for your country take time; ask what your supplier provides and what you must arrange locally.

Unloading, Site Access And Handover

Packaging only ends when the crate is off your site. A 7 m shell needs an access route that fits it: gate width, turning space, overhead clearance, and a slab or base ready and level before delivery day. Confirm who provides the crane or heavy forklift at the delivery point, whether the driver unloads or you do, and how far from the truck the unit may be placed.

Then agree the inspection window. Open the packing with the transporter or your agent present, photograph any damage to the packaging before removing the shell, and record it against the package mark on the packing list. Damage found after the delivery vehicle leaves is far harder to attribute. Installation, snagging and after-sales support are part of SANTERSON's service scope; check what applies to your project — including installer availability at your location, warranty terms and exclusions — rather than relying on general claims.

A Confirmation Checklist To Put In Your Purchase Order

Copy these points into your enquiry and require answers in writing before production begins. An order that carries them is a much easier order to defend if something goes wrong at sea.

  • Crated outer dimensions and gross weight per package, for this model and configuration
  • Packing method: shell protection, base support, securing arrangement, marked lifting points
  • Which equipment is fitted and which ships loose, with crate identification matching the packing list
  • Included versus optional items for WS-PC07ST-S, and the electrical supply each one requires
  • Container type, stowage plan and loading photographs from the port of shipment
  • Draft packing list and commercial invoice approved before shipment
  • Incoterms, insurance responsibility, and who unloads and sets the unit at your site
  • Inspection window, damage reporting route and spare-parts handling at handover

Coordinate The Spa With The Rest Of The Project

Swim spas rarely arrive alone. In villa and resort work they land alongside poolside furniture, paving, lighting and outdoor fixtures, and the same site-access constraints apply to all of them. Ordering the spa together with the rest of your swimming pools and swim spas selection — and coordinating it through one logistics and door-to-door delivery plan — means one packaging discussion, one loading plan and one delivery window instead of several competing ones.

If you are specifying this model for a project, send your drawings, site access photos and configuration list with the enquiry. That lets the packing and loading plan be designed around your site rather than improvised when the truck arrives.