A request for quote for wall panels rarely fails because the buyer forgot to ask the price. It fails because the panel being priced in the quotation is not the panel the site will need on the day the sheets arrive. Wall panelling is a made-to-order finish: size, substrate, surface, edge detail and fixing method are all decided by the documents that come with the enquiry.

Before you send an enquiry for modern decorative wall panel work, collect nine items: the room-by-room schedule, measured elevations, substrate condition, panel category and surface, the custom dimensions and pattern you need, the fixing detail, the quantities with spares, the delivery terms and site access, and your inspection and acceptance point. Everything below explains what each item should contain and what a supplier can actually price from it.

Why the panel RFQ is different from a furniture RFQ

With loose furniture, a sample or a photograph usually settles the specification. With wall panels, the same product code covers several different deliveries. The catalogue lists decorative panels under more than one category — decorative wall panel for interior home decoration appears both in the ceiling and wall-panel listings and in the carpet and wall-panel listings, with different descriptions on each page. A quotation that names only the product title can therefore describe a rigid flat sheet in one offer and a moulded three-dimensional sheet in another.

The practical consequence: quote requests succeed when they define the panel as an assembly — face material, thickness range, board size you want cut from, surface finish, edge treatment, substrate it will be fixed to and the fixing method itself. Product marketing language on its own does not carry that information.

Item 1: The room-by-room panel schedule

Send a table, not a paragraph. One line per wall or feature area is enough. Each line should carry the project name and reference, the room or zone, the wall identifier from your drawings, the finish name used in your specification, the area in square metres, and whether that wall is straight, curved or interrupted by reveals, skirting, architraves or services.

This matters commercially because panel pricing moves with the number of cuts, not only the number of square metres. A 40 m² run of full sheets on one straight wall and 40 m² spread across six hotel rooms with switch plates and a dado return are different production jobs. If your schedule does not separate them, the supplier will either price the simple case and add variations later, or price conservatively and look expensive against a competitor who did not read the drawings.

Item 2: Measured elevations, not floor plans

Attach dimensioned elevations for every wall that is being panelled. Floor plans show where walls are; they do not show heights, reveals, the position of a headboard, a picture rail, a concealed door line or a service chase. What we need in the enquiry is:

  • Net finished height and width for each panelled area, with the datum you measured from
  • Setting-out intent — horizontal joints, vertical joints, shadow gaps, or a continuous run
  • Openings and penetrations: sockets, switches, air diffusers, wall-hung basins, brackets, TV fixings
  • Inside and outside corners, returns, and any reveal where the panel meets stone, glass or plasterboard
  • Ceilings and bulkheads if the same finish continues over them

For curved or shaped walls, say so explicitly and give the radius. Rigid boards cannot follow a tight curve. That is where a bendable sheet belongs: our flexible wood grain cement wall panel is a mineral decorative sheet that can be rolled for packing and cut, drilled and bent on site to follow arches and shaped structures. A quote request that simply says "feature wall, curved" without the radius will not produce comparable pricing.

Item 3: Substrate condition and site moisture

State what the panels will be fixed to and what condition it is in: new plasterboard, existing tiled wall, render, masonry, or a steel frame. Give the flatness tolerance where you have measured it, and note any wall you expect to be damp — bathrooms, spa areas, external walls on the wet side of a build, basements.

Decorative panel copy on our product pages describes moisture resistance for humid indoor environments, and the 3D panels are described as moisture and impact resistant. Those descriptions guide where a product family is normally used; they are not a substitute for your own specification of substrate preparation, waterproofing and any local code requirement. Tell us the environment and let us confirm which panel category suits it, rather than assuming one sheet covers every wall in the building.

Item 4: Panel category and surface, chosen deliberately

Name the family you are enquiring about and explain what the surface has to achieve. Our panel range is not one product:

  • Flat decorative panels for background walls, lobbies, bedrooms, offices and retail — surfaces that imitate stone, wood or fabric, cut and assembled on site.
  • Luxury decorative 3D wall panel where relief and shadow are the design intent — TV background walls, hotel lobby feature walls, restaurant and office accent walls.
  • Flexible mineral sheets for curved walls, arches and renovation over existing finishes, including wood-grain cement sheets that can be painted from a white raw surface.
  • Wall panel systems where panelling is part of a built-in joinery package and must coordinate with wardrobes, media walls and concealed doors.

Also state the finish requirements you care about: sheen level, grain direction, pattern repeat, colour reference (send the RAL, Pantone or a physical sample), and whether visible joints are acceptable. A quote request that says "wood look" gets one answer; a quote request that gives grain direction, board width and a sample reference gets an answer you can compare.

Item 5: Custom dimensions, MOQ and how much flexibility you need

Panel suppliers price standard sheet sizes and cut-to-size work differently. In the RFQ give:

What to stateWhy the supplier needs it
Panel size or module you want, with toleranceDetermines cutting layout, waste and joint pattern on site
Thickness or thickness range requiredAffects substrate preparation, edge detail and fixing choice
Total quantity per wall and total project quantityBatch pricing and consistent dye lot / pattern matching
Spare sheets for future repairLater reorders may not match the original batch
Acceptable MOQ and whether phased delivery is requiredWhether production can be split by room or floor

Our custom and OEM service covers bespoke dimensions, colours, surface patterns and finishes, with flexible minimum order quantities. If your project needs a private-label or branded packaging arrangement, say that in the RFQ as well — it changes production planning and should be priced at quotation stage, not after an order is placed.

Item 6: Fixing method and installation responsibility

Panel descriptions commonly mention light weight and on-site cutting without specialist tooling. That still leaves a decision your RFQ must answer: how the sheets are fixed and by whom. Specify adhesive, mechanical fixing or a battened sub-frame; say who supplies trims, corner beads and edge profiles; and state whether your own trades install or whether you want installation support from the supplier.

If you want supplier-side fitting, installation and after-sales support covers on-site fitting, inspection and snag lists. Put that in the RFQ so labour, tools and access equipment are priced rather than assumed. If your own crew installs, ask for the fixing specification and a written installation sequence, and confirm what void or service access you need behind the panels.

Item 7: Delivery terms, packaging and site access

Panels are large, flat and easily chipped at the corners, so logistics belong in the quote request:

  • Incoterm and named place of delivery, and whether you want door-to-door or port only
  • Mode — sea, air or rail — with the required arrival date on site, not the ship date
  • Packaging standard: edge protection, interleaving, pallet layout, and container loading plan
  • Documents you need for clearance: commercial invoice, packing list, certificate of origin
  • Site access: lift dimensions, stair width, delivery window, storage on site

We handle freight forwarding and door-to-door delivery, including customs paperwork, so the RFQ only needs your terms and dates. What it should not do is leave transit time to be guessed later — a phased panel delivery that misses a decoration programme costs more than the panels.

Item 8: Quality checkpoints and acceptance

Write into the enquiry what you will check and when. In practice that means: an approved physical sample or first-article sheet before bulk production; a colour and texture approval signed by your designer; tolerance limits for joints and level differences between sheets; and the snag process at handover. State who signs off, and whether production starts only after approval.

This is also where you protect yourself on claims. Product pages describe materials as eco-friendly or environmental and mention durability and low maintenance. Ask for the specific documentation your project requires — material composition, test reports, fire classification for the country of installation — instead of repeating a marketing adjective in your specification. We will supply what we can substantiate; anything you cannot verify should not appear in your own tender documents either.

Item 9: Budget band and comparison basis

A budget range helps a supplier propose the right panel category quickly. More important is the comparison basis: require every quotation to state the same things so you can read them side by side — price per square metre for the specified module, cutting and machining charges, packaging, freight to your named place, spares, and installation labour if included. Ask each supplier to confirm exclusions in writing.

If you are sourcing panels together with other finishes on the same job — ceiling panels, engineered flooring, joinery or lighting — say so. Consolidating wall finishes with related products under one procurement reduces the number of interfaces to manage, and it is a question worth asking before you lock in separate orders.

RFQ checklist: send these nine attachments

  • Panel schedule by room, with area and wall identifiers
  • Dimensioned elevations, including heights and openings
  • Substrate description and moisture exposure per zone
  • Panel family, surface finish and colour or sample reference
  • Custom sizes, thickness, quantities, spares and acceptable MOQ
  • Fixing method and who installs
  • Incoterm, delivery place, mode and required on-site date
  • Approval points: sample sign-off, tolerances, snag list
  • Documents required for import clearance

Common questions buyers ask before quoting

Can I quote from a photograph of a panel?

You can start the conversation with one, but do not accept it as the specification. A photograph does not state thickness, substrate, edge detail or fixing method, and similar surfaces exist across several product families. Send the photo plus your elevations and finish requirements.

Should I specify the panel by the catalogue title?

Use the catalogue page as a starting point and then define the assembly in your own words. Some titles appear in more than one category with different descriptions, so the title alone does not pin down the product.

What if part of my wall is curved?

Give the radius and separate that area in your schedule. Curved work usually needs a bendable sheet rather than a rigid board, and it should be quoted as its own line item.

How many spare panels should I order?

Order enough to cover on-site cutting waste plus a repair stock for the life of the finish, because a later reorder may not match the original colour batch. Ask the supplier to confirm batch consistency and store a record of your approved sample.

SANTERSON is a China-based manufacturer and one-stop supplier of furniture and building materials, operating since 2008, with custom and OEM production, freight and door-to-door delivery, installation and after-sales support. Send your panel schedule, elevations and finish references to request a quotation — phone and WhatsApp +86-13928214007 (PHILLIP), email santerson@qq.com. Browse the full range in wall panels and wall cladding.