A swim spa quotation only works when the specification behind it is complete. For the Outdoor Swim Spa WS-SP600-MS, most of the disagreements that appear later in a project — different jet counts, missing pumps, an electrical supply that cannot carry the load — trace back to a specification written loosely at enquiry stage. This guide sets out what to state, line by line, so that the model you compare is the model you receive.
The unit sits in our configurable outdoor swim and hydrotherapy range, alongside WS-SP600, WS-SP500-MS and the wider swim spa catalogue. Two units that share a shell can carry very different equipment packages, which is exactly why the specification sheet matters more than the model name.
Start with the envelope, not the features
Before anything else, fix the physical footprint. The catalogue lists WS-SP600-MS at 5900 × 2500 × 1600 mm. Put those three numbers into your drawing as a clear zone, then add what the manufacturer cannot know for you: access routes from the delivery vehicle to the pad, working clearance for the equipment compartment, and room for steps or seating around the rim. A swim spa that fits the plan but not the side gate is still a failed installation.
State whether the unit will sit on a slab, a deck or a plinth, and confirm that the supporting surface is level and rated for a full water load. This is site information you supply; it belongs in your enquiry so that the factory designs the base and access panels around it rather than guessing.
Write the equipment list as counts, not descriptions
Marketing copy describes features. A purchasing specification records quantities. For WS-SP600-MS, the captured catalogue data lists the following, and this is the level of detail your purchase order should repeat:
| Specification line | Catalogue value for WS-SP600-MS |
|---|---|
| Model | WS-SP600-MS |
| Catalogue dimensions | 5900 × 2500 × 1600 mm |
| Control system | 1 set |
| Swim training system | 1 set |
| Water pump | 1 pc |
| Filter pump | 1 pc |
| Jet total | 29 pcs |
| LED lights | 4 |
| Total power | 11.55 kW |
| Features shown | Water jets, LED lighting, Ozone, Swim training system |
Read the table as a starting point to be confirmed, not as an order document. The catalogue carries the same 5900 × 2500 × 1600 mm envelope for WS-SP600 while that variant shows a different jet total and power figure, so the shell tells you nothing about the equipment inside it. Ask for the confirmed list in writing against your chosen configuration before you compare two quotations.
Separate standard equipment from options
Catalogue-listed options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Each of those changes price, power draw and lead time, so decide them now rather than at handover:
- Heat pump. Determines whether the spa runs as a year-round warm-water pool or a seasonal one. Specify it if you intend winter use.
- Insulation. Relevant to running cost in cooler climates and to transport damage risk. Ask what is fitted as standard and what is added.
- Filtration. Sand filtration versus cartridge changes the maintenance routine your client or facilities team will follow.
- UV and ozone. Both appear in water-treatment discussions; confirm which is included and what chemical dosing is still required.
- Steps and access. Affects the footprint calculation you made earlier, so settle it before the pad is poured.
Put every option in a single column headed "included / not included" on your purchase order. That one column prevents most delivery disputes.
Specify the surrounding outdoor space at the same time
A swim spa is rarely bought alone. Poolside lounging, shade and storage are usually ordered in the same window, and coordinating them with the spa dimensions avoids two separate freight arrangements. Our outdoor furniture collections — aluminium-frame loungers, pergolas and cabana daybeds — are specified to the same drawings as the spa, so the deck clearances you set for the equipment compartment also cover circulation around the seating.
For villa and resort buyers, this is where a single supplier earns its place. As a one-stop furniture and building materials supplier, we can quote the swim spa together with the terrace furniture, exterior cladding and any adjacent bathroom fit-out on one set of drawings, one production schedule and one shipment.
A pre-order checklist
- Model code written exactly as quoted, including the configuration suffix.
- Dimensions confirmed against the final configuration, not just the catalogue envelope.
- Every pump, jet count, light and control set listed with quantities.
- Total power plus voltage, phase and breaker requirement supplied in writing.
- Options marked included or not included, with the effect on power noted.
- Site conditions stated: pad type, level, access route, crane or lift needs.
- Freight terms and delivery address agreed, with customs paperwork named.
- Spares and consumable filters identified before the unit ships.
Send us your draft specification
If you are specifying WS-SP600-MS for a villa, resort or private residence project, send the enquiry with the checklist above and we will return a confirmed equipment list, the electrical requirements for that configuration, and a quotation covering freight to your site. Project teams working across several product categories can combine the swim spa with their wider furniture and building materials package under one coordination schedule.