A swim spa in a hotel garden, a resort terrace or a serviced-apartment wellness deck has to do two jobs at once: it has to serve guests reliably every day, and it has to survive a procurement process that involves designers, M&E consultants, main contractors and an overseas supplier. The Outdoor Swim Spa WS-PC01 is one of the configurable units in our swimming pools and swim spas range, and it is a useful example to work through, because a compact unit like this exposes every weak point in a hospitality purchase plan well before the concrete is poured.

This guide walks through the procurement sequence we follow on project orders: fixing the duty of the unit, checking the site conditions, locking down the specification, agreeing commercial terms, and planning delivery, installation and handover. It is written for procurement managers, FF&E buyers, contractors and hotel operators who need a swim spa to arrive on site ready to be commissioned rather than becoming a programme risk.

Start With the Job the Unit Has to Do

Hospitality projects buy swim spas for very different reasons, and the reason determines the specification. Before you request a quotation, decide which of these three roles the unit is filling:

  • Guest wellness. Hydrotherapy and lap-style use in a hotel spa deck or villa garden. Jet layout, water temperature stability and seating comfort matter most.
  • All-season attraction. A heated unit outdoors extends the usable season for a resort or restaurant terrace, which raises the value of insulation and heating options.
  • Programme fit. Where a full pool is impossible because of space, structural load or cost, a compact spa delivers a water feature without excavation. Footprint and weight then drive the whole decision.

Write that role down in the project brief and attach it to your enquiry. Suppliers answer enquiries with standard catalogue data; if the brief says what the unit is for, you get a specification proposal instead of a datasheet.

Read the Catalogue Data as a Starting Point, Not a Finished Specification

The published data for WS-PC01 gives you a footprint and an equipment set to work from. Treat these figures as catalogue values that your final order must confirm line by line:

ModelWS-PC01
Catalogue dimensions3000 × 1050 mm
Control system1 set
Water pump2 pcs
Filter pump1 pc
Jet total53 pcs
LED lights1 pc
Total power (catalogue)6.65 kW
Features listedWater jets, LED lighting, ozone

Two of those lines need special care. The total power figure is a catalogue value for a particular configuration; heat pumps and other options change the electrical load, so the number your M&E engineer designs to must come from the confirmed order, not from the brochure. The swim training system is not listed in the published data for this model, so if your project promises lap swimming to guests, that function has to be specified and confirmed in writing rather than assumed.

The same caution applies across the range. If you are comparing options, request the data sheets for several models at once: Outdoor Swim Spa WS-P001, Outdoor Swim Spa WS-PC01A and Outdoor Swim Spa WS-PC02 sit close to it in the catalogue but differ in dimensions and equipment, so a like-for-like table is the only fair way to compare them.

Check the Site Conditions Before You Commit to a Model

Most swim spa problems on hospitality sites are site problems, not product problems. Ask your design team to answer these questions in the tender stage:

  • Structure and access. A 3000 mm unit still has to reach its position. Confirm crane or forklift access, route widths, door openings and the load rating of any deck, podium or rooftop slab, with water weight included.
  • Power supply. Supply capacity, protection devices and cable routing must match the confirmed configuration. Hand the electrical engineer the equipment list from your quotation, not the marketing page.
  • Drainage and overflow. Backwash, drainage and any overflow route need a decision before finishes are fixed.
  • Water treatment regime. Ozone appears as the treatment feature in the published data. If your operator or local authority requires a specific disinfection method, confirm the treatment package for the order rather than assuming what is fitted.
  • Local approvals. Pool and spa barriers, signage and electrical inspection rules differ by state and municipality. Your local consultant owns that scope; ask the supplier only for the documentation those rules require.

Specify Options in the Order, Not On Site

The catalogue lists options for this range including control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option you want must be named on the quotation and repeated on the proforma invoice.

For hospitality duty there are three options worth pricing early:

  • Heat pump. Determines whether the unit is genuinely usable outside summer, and it materially changes electrical demand.
  • Insulation. Affects running cost for any heated outdoor installation, which operators will feel every month the asset is open.
  • Steps and access detailing. Guest-facing units need safe, comfortable entry that also matches your paving and deck levels.

Where a project needs something outside the catalogue, such as a finish detail, a control interface or a non-standard configuration, our Custom & OEM Service covers bespoke design and prototyping alongside standard production. Send the requirement with drawings early enough that it sits inside the production window instead of after it.

Get the Commercial Terms Right Before Production Starts

Once the specification is frozen, the commercial terms decide whether delivery is smooth. For an imported spa on a hospitality programme, agree all of the following in one document:

  • Delivery term and who carries which risk. State the Incoterm explicitly, and confirm who arranges import clearance, duties and inland transport to site.
  • Packaging and container loading. Spas travel with acrylic shells, glass components and jet assemblies; ask for the packing method and the container plan before you commit to a shipping window.
  • Cargo insurance. Decide whose policy covers the unit in transit and what evidence is needed for a claim.
  • Documentation pack. Commercial invoice, packing list and any certificates your customs broker will ask for should be listed in advance.
  • Inspection point. Agree when you can inspect or approve before shipment, and what happens if the delivered configuration differs from the approved one.

Our Logistics & Door-to-Door Delivery service covers freight forwarding, customs paperwork and container loading planning, but the practical terms, meaning duties, insurance cover, transit window and delivery scope to your address, are confirmed per project. Do not let a marketing promise become a contractual expectation.

Plan Commissioning and Handover as Part of the Purchase

A spa is only finished when it has been set, filled, tested and handed over with operating instructions. Build these steps into your programme:

  • Set and level the unit on the prepared base, with the service side left accessible for maintenance.
  • Connect power, bonding and controls to the approved design, witnessed by your electrical inspector.
  • Fill, balance and run the unit through a full cycle with pumps, jets, lighting and treatment checked one by one.
  • Record a snag list before the operator accepts the asset, and keep the spares and consumables list on file.
  • Train the maintenance team on daily water care so warranty claims do not start with neglect.

Our Installation & After-sales Support service covers on-site installation support, inspection and snagging, warranty handling and spare parts. Warranty terms, response times and installer arrangements vary by country, so confirm them for your site in the contract instead of relying on published claims.

A Procurement Checklist You Can Attach to the Enquiry

  • Role of the unit: guest wellness, all-season attraction or space-saving alternative to a full pool.
  • Site pack: access route, slab load, power capacity, drainage and treatment requirements.
  • Confirmed specification: dimensions, pumps, jets, lighting, treatment, options and electrical load.
  • Like-for-like comparison of two or three candidate models from current data sheets.
  • Commercial terms: Incoterm, insurance, duties, documentation and inspection point.
  • Programme: production window, shipping window, installation window, commissioning and handover dates.
  • Operating pack: spares list, consumables and maintenance training for the operator team.

If your project needs a swim spa coordinated with the rest of the fit-out, meaning outdoor furniture, bathroom fixtures, lighting, cabinetry and finishes from one supplier, that is what Furniture and Building Materials Project Procurement under our one-stop service is built for. Send the drawings and the unit list, and we will return a specification proposal with options priced.

Frequently Asked Questions

Is WS-PC01 suitable for a rooftop or podium deck?

It can be, provided the structural engineer confirms the load with water included and the access route allows the unit to reach the position. Send the plans so we can advise on handling before production.

Can I order the heat pump and insulation as options?

Yes, both appear in the option list for this range. Availability and compatibility vary by model, so we confirm them on your quotation before production.

Do you supply spares such as jets and pumps later?

Yes. Keep the confirmed specification sheet from your order, since it is what identifies the exact parts for your unit.

SANTERSON manufactures furniture and building materials in China and supplies project packages worldwide, with swim spas supplied as part of wider hospitality and villa programmes. Send us your drawings and requirement list to receive a specification proposal for this model or the closest fit in the range.