A swim spa quote is only comparable when every supplier is pricing the same thing. Two quotations for Outdoor Swim Spa WS-SP500-MS can differ a great deal in price because one includes a heat pump and insulation while the other does not, or because one covers delivery to site and the other stops at the port. Before you compare numbers, send each supplier the same written request for quote with the same information on it.
Below is the checklist we use when a buyer asks us to price this model. Work through it in order and your quotations will line up item by item.
1. Site dimensions, access and water
The catalogue shows WS-SP500-MS at 5000 × 2500 × 1600 mm. Send the supplier the clear internal space you have available, plus the outside route the shell will travel: gate width, turning radius, steps, overhead wires and whether a crane or forklift is needed. Tell us whether the spa will sit fully above ground, partly recessed, or on a raised deck, because that changes access panels and the type of base required.
Also state what services already exist at the position: where the power supply comes from, where drainage connects, whether there is an outdoor water tap, and how far those points are from the spa. A supplier who sees these details can flag problems before production instead of after delivery.
2. Equipment you actually want in the shell
The published specification for this model lists a control system, a swim training system, one water pump, one filter pump, 29 jets and 4 LED lights, with water jets, LED lighting, ozone and a swim training system shown as fitted features. Ask the supplier to confirm, in writing, which of these are included in the quoted price and which are options. Jet count is easy to misread: within the same 5000 × 2500 mm shell size, the WS-SP500 variant is listed with 6 jets while WS-SP500-MS is listed with 29. If you received two quotes for a "5 metre spa" at very different prices, jet package is one of the first places to look.
The catalogue also lists options such as an additional control system, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. State which of these you want quoted as separate line items so you can decide later what to drop without re-pricing the whole order.
3. Power, heating and running assumptions
Total power for this configuration is listed at 11.55 kW. Give the supplier your local supply arrangement — single or three phase, available circuit capacity, and whether an electrician will run a dedicated circuit and any required isolation. Ask the supplier to state the electrical requirement for the exact quoted configuration, not for the range in general.
Heating is where running cost is decided. Tell us your climate, the water temperature you want to hold, how many months a year you intend to use the spa, and whether you want a heat pump or a conventional heater quoted. Insulation and a cover affect the same figure, so request them in the quote even if you expect to decline one of them.
4. Use case and who operates it
Say plainly what the spa is for: daily swim training, hydrotherapy, a villa garden, a resort or hotel leisure area, or a clubhouse open to residents. A private owner and a facility manager maintain equipment differently, and that changes what spare parts and controls you should buy at the same time as the shell. For hospitality and community facilities, ask which consumables and replacement parts you should order with the unit.
5. Delivery, installation and after-sales terms
Ask each supplier to state the delivery term explicitly — port, door or site — plus who handles customs clearance, who pays duty, and how the spa is packaged and loaded. For an imported unit this belongs in the quote, not in a later invoice. Then ask what happens on arrival: whether installation and commissioning are included, who inspects and signs off, what warranty covers, how long it lasts, and which spare parts remain available afterwards.
As a manufacturer and one-stop supplier of furniture and building materials for villa, hospitality and office projects, SANTERSON handles this part through named stages — production, logistics and door-to-door delivery, installation and after-sales support. Details on those services are on our logistics and door-to-door delivery page and our installation and after-sales support page. We confirm freight terms, warranty scope and response arrangements for your specific site rather than quoting general marketing figures.
6. What a complete quotation should return to you
A usable quote lists the model and configuration by name, itemises included equipment against optional extras, states dimensions and required services, gives the delivery term and packaging, and separates product price from freight, duty and installation. Ask for that structure in your request, and you will be able to put two or three offers side by side without guessing what is missing.
If you would like a quotation prepared for WS-SP500-MS with your site details and options specified, send us the dimensions, services and use case above. Our WS-SP500 page shows how the same shell size is configured differently, which is exactly the comparison your request for quote should make explicit.