A 7-metre swim spa is not a catalogue item you simply drop into a back yard. On Outdoor Swim Spa WS-PC07ST, the shell, the swim unit, the filtration circuit and the power supply all have to agree with each other and with the site they land on. Before we put this model into production, we walk buyers through a short list of confirmations. Each one changes either the build or the cost, so settling them early keeps the project moving.
1. The footprint: shell size versus the space you actually have
The catalog lists this model at 7000 × 2400 × 1470 mm. Those three numbers are the outer shell, and they are only half of the picture. A spa sitting on a deck or partly recessed into a patio also needs working room: access to the control system and filter pump for routine service, clearance for steps, and a route for the delivery crew. Buyers regularly find that a slab poured to the exact shell size leaves no room to open an equipment compartment.
Send us the plan of the intended location with three things marked: the finished floor level, where the power will come from, and which sides need to stay reachable after installation. If the space is tight, the related WS-PC07ST-L and WS-PC07ST-S variants in the same family give different overall lengths, which is often easier than reworking a slab.
2. The configuration: what is included and what is optional
The captured specification for this model shows one control system, one swim training system, one filter pump, six jets and four LED lights, with water jets, LED lighting and ozone listed as the features shown on the page. Note that the water pump is not listed in the specifications we hold for this configuration — which is exactly why the equipment list has to be confirmed in writing before an order is placed, rather than inferred from a neighbouring model.
Catalog-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so the same option code can behave differently across the family. Please confirm:
- which pump set is quoted for your build, and whether a heat pump is included or supplied separately;
- whether insulation is specified for the shell and base — this matters in cooler highland or southern climates;
- whether an automatic cover is wanted, which is shown on some variants of this family rather than as a universal option;
- steps, handrail and any deck-side seating as separate line items.
3. Power: total connected load and the local supply
Total power for this model is listed at 6.55 kW. Treat that figure as the connected load to be checked against your electrical plan, not as a consumption number. The actual circuit depends on your supply voltage and phase, the route from the switchboard, earthing arrangements and any local requirements for equipment near water. We build to the electrical parameters you confirm; your electrician handles the supply side, and local rules on protection and bonding should be checked with the installer in your area before the cable is run.
4. Structure and drainage at the site
- Support. A filled shell is a heavy point load. Deck framing and slab thickness should be confirmed by your engineer for the exact installation position, especially for first-floor terraces and rooftop positions.
- Level. The base must be level and continuous. Spot supports under a long shell are a common source of later stress on panels and finishes.
- Water in and out. Confirm the fill connection, and where the drain and any overflow will discharge. For an elevated site, the drainage route has to exist before the spa arrives.
- Access for the crew. Delivery route, door widths, crane or lift requirements if the site is not at ground level.
5. How we work with you on these confirmations
For a custom swim spa, our sequence follows the same steps as our wider project work: a brief and design proposal, then quotation and detail confirmation, then production, shipment and follow-up. Under Custom & OEM Service we confirm dimensions, finish and equipment options against your drawings before the shell goes into production. Freight, customs paperwork and door-to-door delivery are arranged through our Logistics & Door-to-Door Delivery service, with installation and after-sales support coordinated afterwards.
If the swim spa is one part of a larger outdoor fit-out — pergola, loungers, dining set, poolside cabinetry — it is worth specifying it together with those items. One coordinated order means one production schedule, one shipment plan and one point of contact for snags at handover.
Quick pre-production checklist
| Item to confirm | Who confirms it |
|---|---|
| Overall shell size and clearance for service access | Buyer's plan + our team |
| Included equipment list: pumps, jets, ozone, lighting, control system | Our quotation |
| Options: heat pump, UV, sand filtration, insulation, steps, cover | Buyer's selection |
| Supply voltage, phase and circuit route | Buyer's electrician |
| Slab or deck load, level base, drainage discharge | Buyer's engineer / builder |
| Delivery access and any lifting requirement | Both sides |
| Finish, colour and surround detail against the project drawings | Our design team |
The dimensions, jet counts and power figure above are transcribed from the catalog page for this model. Options vary by configuration, so the equipment list in your signed quotation is the one that governs the build.
Planning a swim spa on a terrace, in a villa garden or as part of a resort pool deck? Send us the location plan and your preferred configuration, and we will return a specification sheet and quotation for this model.