A swim spa is one of the easiest wellness amenities to add to a hotel or villa scheme, and one of the easiest to get wrong. The unit itself arrives as a finished shell with pumps, jets and lighting already installed; what decides whether it performs on site is where you put it and how the services around it are planned. Outdoor Swim Spa WS-S04 sits in the compact end of our configurable swim and hydrotherapy range, which is exactly why it keeps appearing on villa terraces and small resort sites where a full swimming pool simply will not fit.
What WS-S04 Actually Is
WS-S04 is a self-contained acrylic-shell spa with a reinforced cabinet, supplied as part of the Swimming Pools and Swim Spas category. The catalogue sheet lists it at 4090 × 2200 × 1110 mm, with a total power figure of 8.25 kW, three water pumps, one filter pump, a control system, and 26 jets including four water columns. Lighting is provided by three LED fittings plus eighteen small LED lights, and the features shown for this model are water jets, LED lighting, ozone and a waterfall.
Two details in that list matter more to a project than any marketing line. First, the depth: at 1110 mm the shell is shallow enough that most adults can stand or sit comfortably in it, which suits family villas and hotel wellness areas where guests include children and older users. Second, the footprint: just over four metres by 2.2 m means the unit can be set on a deck, a terrace slab or a paved garden platform without restructuring the building around it.
WS-S04 — catalogue figures
Dimensions: 4090 × 2200 × 1110 mm
Total power: 8.25 kW
Water pumps: 3 pcs · Filter pump: 1 pc
Jets: 26 pcs, including 4 water columns
Lighting: 3 LED lights + 18 small LED lights
Features shown: water jets, LED lighting, ozone, waterfall
Figures above are the catalogue values published on the product page. Included equipment, options and electrical requirements should be confirmed for the specific configuration you order.
Villa Projects: Terraces, Sunken Courts and Garden Decks
In a private villa, WS-S04 usually solves a spatial problem rather than an ambition. A plot may comfortably take an outdoor lounge, a barbecue island and planting, but not a long lap pool. A spa of this size gives the owner cold-season swimming, physiotherapy sessions and a daily soak without consuming the garden.
- Paved terrace next to the house. The most common setting. The unit sits on a prepared slab close to the internal wall, which keeps the electrical run, the filter pump access and the plumbing short.
- Elevated timber deck. Works well where the villa steps down a slope. Structural loading for a full shell must be checked by the project engineer before the framing is built, not after.
- Sunken courtyard or light well. Where a villa has an internal void, the spa becomes a visual feature from the upper floor as well as a usable room.
- Roof terrace on larger villas. Possible, but only with a structural assessment, a drainage layer and a service route agreed at design stage.
Because our villa work is delivered as Turnkey Villa Furnishing, the spa is specified in the same package as the terrace furniture, the paving and the lighting. That coordination is worth real money on site: a spa ordered after the deck is laid almost always means coring, re-waterproofing or a second concrete pour.
Hotel and Resort Projects: Wellness Floors and Guest Villas
For hospitality the argument is different. A full pool needs plant rooms, filtration halls, lifeguard provision and code compliance for public bathing. A spa of this size is treated as a wellness facility instead, which opens up positions a pool could never occupy.
- Spa and wellness floor. Placed inside or adjacent to the treatment area, where guests book hydrotherapy sessions between treatments. Ozone and the filter pump support the water-quality regime your operations team will already be documenting.
- Rooftop bar or sky lounge. A four-metre shell fits on a podium slab where a pool would exceed the loading envelope, and the waterfall plus LED lighting gives the space an evening presence without additional landscaping.
- Private-pool villas and resort cabanas. One unit per villa, sized so that the outdoor room can still hold a dining set and loungers. This is where the compact width of 2200 mm earns its place.
- Fitness club or gym extension. Adds contrast therapy and recovery capacity to an existing gym without new structural works.
Where a project needs something longer, our range runs up through the eight-metre and ten-metre models with optional swim training systems — Outdoor Swim Spa WS-S10 is the step-up we usually quote for resorts that want genuine lap swimming. Where the brief calls for a shaped feature rather than a rectangular shell, the Customizable Shape Outdoor Spa covers square, round, oval and curved layouts.
Site Conditions to Settle Before You Order
The following are the items that decide whether installation runs smoothly. All of them are design-stage decisions, and all of them come back to two numbers on the catalogue sheet: 8.25 kW of connected load and a shell that weighs a great deal once filled.
- Power supply. Confirm the available supply, the circuit rating and the distribution board location against the total power figure for your configuration. This is local-electrician work and should be shown on the electrical drawings before the shell arrives.
- Structure and drainage. A deck or slab has to carry the filled shell plus guests, with a drained substrate beneath it so that backwash and overflow do not pond.
- Access for delivery. The unit is shipped as a complete shell. Check gate widths, turning circles and whether a crane or a route through the building is required.
- Wind and exposure. An exposed ridge or coastal terrace loses heat quickly; insulation is one of the catalogue options and should be discussed at quotation stage rather than added later.
- Water quality plan. Ozone is shown as a feature on this model, and UV sterilisation, sand filtration and additional pumps are listed options. Agree what your operator will test with, and how often.
Electrical compliance, permits and structural certification follow local rules in each country. We supply the unit, the specification and the coordination drawings; the local approvals remain with the project's engineer and contractor, and we do not present any certification as covering a specific jurisdiction.
How Specification Fits into Project Procurement
For consultants and procurement teams, the practical benefit of buying the spa through the same one-stop furniture and building materials supplier as the rest of the fit-out is a single specification document. The shell, the outdoor furniture on the deck, the wall cladding behind it, the lighting above it and the paving under it all arrive on one production schedule and in one shipment plan, handled through furniture logistics and door-to-door delivery. Where a hotel group wants the cabinet finished to match its joinery standard, that falls under our custom furniture manufacturing service rather than a separate subcontract.
Send us the terrace or wellness-floor drawing, the guest profile for the facility and your local supply details, and we will confirm which of the S-series shells fits the space, what options the configuration needs, and how the spa sequences with the rest of the package.
Quick Answers
Can WS-S04 be installed indoors?
The catalogue presents it as an outdoor spa. Indoor installation is possible, but it changes the requirements — ventilation and humidity control, a drained floor build-up and access for delivery — and those need to be resolved on the drawings before ordering.
Is there room for swimming exercise in a 4 m shell?
The catalogue does not list a swim training system for WS-S04. It is built as a hydrotherapy and family spa: jets, water columns, ozone and lighting. For counter-current lap swimming, look at the longer models with a listed swim training system.
What is included in the price?
Options such as heat pumps, UV sterilisation, sand filtration, insulation and steps are catalogued separately, and availability varies by model. The quotation for your configuration lists exactly what ships.