A Wall Hung Ceramic Basin 1050WB, Luxury Gold Line Wall Mount Bathroom Sink looks simple on a fixture schedule: one wall-mounted sink, one gold accent line. What decides whether it installs cleanly on site is the paperwork that travels with it. A product submittal is the document package a buyer, designer or contractor reviews before an order is confirmed — dimensions, mounting method, drainage arrangement, finish, matching pieces and the commercial terms attached to them. When that package is complete, the same basin arrives at a boutique hotel or villa bathroom without a site query stopping the works.
This guide sets out what we include in a 1050WB submittal, and what to ask your supplier for if their version leaves gaps.
1. The exact item: model, name and where it sits in the range
Start with a line that cannot be misread. Model number 1050WB, product name as published, category (bathroom sanitary fixtures) and the product page URL. Bathroom ranges reuse similar numbers across different formats, so a submittal that only says "gold line wall basin" invites the wrong item into the order.
The 1050WB is one member of a matched 1050 series. A complete submittal names its siblings — the 1050A one-piece washdown toilet, the 1050B freestanding pedestal basin and the 1050WC tall wall-hung basin — and states which of them are being ordered for the same bathroom. Specifying the series in one document keeps the gold line detail consistent across fixtures instead of mixing it with unrelated ceramics.
2. Dimensioned drawing, not just a photograph
The published outline size for 1050WB is 495 × 440 × 390 mm (width × projection × height). Treat that figure as the starting point for setting out, and ask for a dimensioned drawing before any wall is closed up. A photograph tells you what the basin looks like; it does not tell a plumber where the waste drops or where the water outlets belong.
From the drawing you can confirm three things that actually move on site:
- whether the basin clears the mirror, vanity lighting and towel rail already scheduled for that wall;
- how much clear floor is left beneath it — relevant in a small guest bathroom or villa secondary bathroom, where the open floor under a wall-hung basin makes mopping easier and the room reads larger;
- whether the projection conflicts with a door swing, partition return or shower screen.
Dimensions shown on product pages are the nominal outline. Confirm them against the current technical sheet for the batch being ordered before the drawing is issued to site.
3. How it is fixed, and what the wall has to do
The 1050WB is a wall-mounted basin carried on its back panel, with no pedestal and no vanity cabinet under it. That single sentence creates three items in your submittal:
- The fixing method. How the back panel is supported, what fixings are supplied, and whether a concealed frame or carrier is needed.
- The substrate. What wall construction the fixings are designed for — masonry, framed stud with noggins, or a reinforcement plate set during the framing stage. This has to be resolved before the wall is lined and tiled, not when the basin arrives.
- The finished floor level. Rim height is measured from the completed floor finish. State the finish build-up so the set-out height matches once tiles are down.
If your project uses a wall-hung WC as well, coordinate the carrier heights of both fixtures on one drawing so the gold-line family reads as a deliberate set rather than two separate installations.
4. Drainage and water supply
This is where incomplete submittals cause the most rework. For each bathroom, the document should record:
- waste type and position relative to the finished wall face;
- trap arrangement — bottle trap or concealed offset trap, and how it will be accessed for servicing;
- hot and cold outlet positions and the tap set being used;
- the tap hole configuration on the basin itself: 1050WB is supplied with a pre-drilled faucet hole, so a single-lever mixer is the straightforward pairing. If your design calls for a different tap arrangement, raise it before the order, because drilling and waste details are not adjustable after production.
Rough-in positions should be issued as a dimensioned sketch that the plumbing contractor can mark out on site. Where a project mixes 1050WB with the taller 1050WC as a feature basin, each fixture needs its own rough-in note — they are not interchangeable in the wall.
5. Material, glaze and finish confirmation
State the body material and the surface treatment in plain terms: 1050WB is made of vitreous china with a smooth glazed surface, decorated with a gold line accent. A dense glaze resists water staining, limescale and yellowing, which is why these basins wipe clean with ordinary daily maintenance rather than specialist products.
Two things belong in the submittal here:
- a close-up image or finish sample showing the gold line, so the decoration is approved before production and there is no argument about it at handover;
- the cleaning and maintenance note for the specifying team — what to use, and what to avoid on metallic-decorated surfaces.
6. Matching pieces and the rest of the bathroom
A basin rarely fails a project on its own; it fails when the pieces around it were specified separately. Your submittal should list what else is being supplied for that room, and what is not:
- same-series ceramics: 1050A toilet, 1050B stand basin, 1050WC tall wall basin;
- mixers, traps and waste sets — confirm whether they are included or to be sourced locally;
- vanity and storage alternatives. Wall-hung basins are often specified with no cabinet at all, but where counter storage is needed, options such as a floating vanity or a double vanity have to be re-planned with the basin, not bolted on afterwards;
- mirror cabinets and vanity lighting, whose positions depend on the basin height you have set out.
For a full guest-floor or villa bathroom package, it is worth specifying across the wider bathroom sanitary fixtures range in one pass, so shower sets, toilets and basins are quoted together instead of three separate enquiries.
7. Where it is being used, and what that changes
The 1050WB appears most often in boutique hotel restrooms, luxury apartments and villa secondary bathrooms — rooms where floor area is tight and the fixture carries visual weight. The setting changes what your submittal should prove:
- Hotel guest rooms and public restrooms: quantity per floor, spare units held for future replacement, and whether the gold-line decoration is consistent across a repeated room type.
- Villa bathrooms: how the basin relates to wall finishes and joinery, and whether the tall 1050WC is used as a feature piece in one room while 1050WB serves the others.
- Renovation work: existing waste positions are rarely where a new wall-hung basin wants them, so include an existing-conditions check before ordering.
8. Commercial terms and delivery information
The technical half of the submittal gets the fixture approved; the commercial half is what stops it sitting in a port. Include:
- unit price, order quantity and minimum order quantity;
- packing details — how each basin is protected, carton dimensions and the container loading plan for a multi-bathroom order;
- freight mode and the delivery terms being quoted, plus the shipping documents supplied with the consignment;
- production lead time stated against an on-site installation date you have actually fixed;
- what happens if units arrive damaged, which spare parts are available, and how warranty is written — read the terms rather than assuming them.
SANTERSON works as a China-based manufacturer and one-stop supplier of furniture and building materials, so a single enquiry can also cover turnkey project solutions for villas, hospitality and offices — basins alongside flooring, cabinetry, wall panels, lighting and outdoor furniture. For a whole fit-out, ask for one consolidated submittal organised by room or floor rather than one document per supplier line.
9. Customisation: what to settle before production starts
If the standard 1050WB specification needs adjusting, custom and OEM work is available — bespoke finishes and textures, private labelling, and flexible order quantities. The practical rule is that changes must be agreed before manufacturing begins: a tap hole position, a waste arrangement or a finish variation is cheap to change on paper and impossible to change on a fired basin.
Ask for the confirmation sample or approved drawing with your sign-off recorded in the submittal. That single page is what protects you if the delivered batch does not match the expectation set at quotation stage.
A pre-order checklist
Before you approve a 1050WB order, check that the submittal answers all of these:
- model and full product name, with the series it belongs to;
- outline dimensions plus a dimensioned drawing from the current technical sheet;
- fixing method and the wall reinforcement or substrate required;
- waste position, trap type and hot/cold outlet positions;
- tap hole configuration matched to the selected mixer;
- body material, glaze and a sample or image of the gold line decoration;
- matching series items listed, and items not included clearly marked;
- quantities per room or floor, plus spares;
- MOQ, packing, freight terms, documents and lead time against your installation date;
- damage handling, spare parts availability and written warranty terms.
If a supplier cannot produce these items, that is the gap to close before the order — not after the basin is on the wall.
Get the submittal pack for your project
Send us the room layout or fixture schedule and we will return a 1050WB submittal with dimensions, mounting and rough-in details, matching 1050-series pieces and a quotation built around your installation date. Enquiries go through our contact page; include the number of bathrooms and your target on-site date so the lead time is realistic from the start.