A README is the one-page brief that sits at the front of a project folder. On a building or furnishing job it tells every supplier, estimator and site team the same thing: what is being delivered, in what quantity, to what standard, and by when. When one package covers several product families at once — loose furniture together with built-in joinery, wall and ceiling finishes, lighting, sanitaryware and flooring — that single sheet has to carry far more detail than a line-item purchase order. This guide explains how to write that README so the budget it produces is one you can actually sign.

Why multi-product packages need a different brief

Single-product buying is forgiving. If a chair specification is thin, the buyer chases one sample and the risk stays contained. A mixed package behaves differently: each product family has its own material language, its own measurement method, and its own lead time, and they all land on site in the same window.

Take a villa or hospitality job as an example. One delivery may include outdoor lounge sets, kitchen cabinetry, wardrobes, decorative wall panels, aluminium ceiling tiles, engineered timber flooring, pendants and basins. Six of those categories are measured off drawings and fixed to the building; the rest are loose items that can be adjusted later. If the README treats them as one undifferentiated list, the quotation comes back as one undifferentiated number — and every change order after that has no baseline to be measured against.

A supplier that handles both categories under one contract is in a better position here. SANTERSON works as a one-stop furniture and building materials supplier, producing loose and built-in furniture alongside wall, ceiling, flooring, lighting and sanitary products for villa, hotel and office projects. The advantage is not simply convenience: with one party responsible for the whole scope, quantities are taken off the same drawings once, and the README becomes a shared document rather than a set of parallel briefs that drift apart.

Section 1 — Project frame

Open with the facts that do not change between trades:

  • Project name, location and the stage of construction the fit-out starts from.
  • Who issues the README, who receives it, and which drawings or schedules are attached as the measurement source.
  • Delivery address or addresses, plus site access conditions — floor level, lift dimensions, working hours, storage on site.
  • Required delivery window per phase, not one blanket date.

Site access belongs in the README more often than it does. A 40-piece outdoor collection for a resort terrace or a full set of wardrobes delivered to an upper floor behaves very differently once stair widths, crane windows and lift capacities enter the picture. Stating those conditions up front means the freight allowance in the price is real rather than assumed.

Section 2 — Product schedule by family

Split the scope into families and give each one its own block, with the same fields repeated. That repetition is what makes the totals comparable across suppliers.

FieldLoose furnitureBuilt-in / interior fixturesBuilding finishes
Unit of measurePiece, setLinear metre, m², itemm², linear metre
Specification depthFrame material, weave or upholstery, finish, dimensionsSubstrate, door type, hardware, edge treatmentProfile, surface treatment, fixing method
Approval needed before productionSample or 3D renderingShop drawing sign-offSample panel and detail drawing
Change toleranceQuantity can move until packing list is cutFrozen once drawings are signedFrozen once substrate is set out on site

Name the reference products you are working from. Pointing to catalogue pages — an aluminium outdoor swing bench and chaise lounge set, a run of aluminium suspended ceiling tiles, or custom built-in kitchen cabinets for hotel and apartment projects — gives the estimator a defined starting point, after which your deviations are listed as deviations. That is far cheaper than describing an item from scratch in prose.

Section 3 — Custom and OEM lines

Every multi-product project carries items that do not exist yet. State them separately, because their cost sits in prototyping and approval as much as in production. For custom and OEM work the README should record:

  • Which items are bespoke to this project and which are existing models with a finish change.
  • The materials under consideration — wood, metal, engineered stone, laminate — and who decides between them.
  • Prototype and sample requirements: what must be physically approved, by whom, and how long that approval takes.
  • Order quantity per line, so the buyer can see where small batches carry a different unit price from volume lines.

Section 4 — Cost structure, not just a total

Ask for the quotation in the same shape as your README. A single figure is where budgets die. The breakdown you want to see:

  • Product cost per line, with unit rate and quantity visible.
  • Tooling, prototype and sample costs listed separately — they are one-off and should not be hidden inside unit rates.
  • Packaging and container loading allowance, stated as its own line.
  • Freight by sea, air or rail per phase, with the incoterm written next to it.
  • Customs documentation and any permit handling.
  • Installation labour and snag rectification on site.

Documentation is a real budget line on international jobs. Invoices, packing lists, certificates of origin and import permits all take time to prepare, and logistics and door-to-door delivery arrangements should say plainly which documents the supplier issues and which fall to the buyer. Write that split into the README before prices are requested.

Section 5 — Phasing and dependencies

Multi-product scopes fail on sequence more often than on price. Build a short dependency list into the README:

  • Finishes that must be installed before loose furniture is delivered — flooring, wall panelling and ceilings first, or the delivery team blocks completed work.
  • Built-in joinery that depends on services being fixed — cabinetry and wardrobes cannot be finalised until plumbing and electrical positions are set out.
  • Long-lead items identified by name, with the latest date each can be ordered without moving the handover date.

Then group deliveries to match that order. A shipment carrying ceiling tiles and a sofa set to the same site on the same week usually means one of them sits in storage at someone's cost.

Section 6 — Assumptions, exclusions and change control

Write down what the price does not include, in the same document as the price. Site preparation, local trades, building permits, structural fixings and out-of-hours access are the usual omissions. Then state how a change is handled: who can instruct it, what happens to quantities after production has started, and how a variation is priced. On a project where turnkey scope runs from design through production, logistics, installation and handover, that clause is the difference between a controlled budget and an open-ended one.

A short pre-tender check

Before the README goes out for pricing, confirm six things: every product family has its own block; quantities trace to a named drawing; samples and prototypes are listed with an approval owner; freight and documentation appear as separate lines; delivery phases match site sequence; and exclusions are written down. If any of those is missing, fix it now — the cost of rewriting one page is trivial next to the cost of reconciling five quotations that were answering different questions.

Send your README and drawings to us and we will return a quotation structured line for line against it, with prototype requirements, freight phases and installation scope shown separately. Send your enquiry to the SANTERSON team to start that review.