A swim spa quotation is only as good as the brief behind it. Two buyers can ask for the same Outdoor Swim Spa WS-S04X and receive very different prices, because the shell dimensions are only part of the order. Jet layout, filtration, heating, control system, insulation, access and site preparation all sit behind the model number. The checklist below is what we ask project owners, contractors and dealers to settle before requesting a quotation, so the specification you approve in the drawing stage is the unit that arrives on site.

Start with the catalogue baseline for WS-S04X

WS-S04X belongs to our configurable outdoor swim and hydrotherapy range. The published catalogue entry lists a shell of 3990 × 2260 × 950 mm, one control system, three water pumps, one filter pump, a jet total of 85 pieces, LED lighting, ozone sanitation and a waterfall feature, with a total power figure of 8.85 kW. Treat those numbers as the starting point rather than the finished specification: equipment included and the electrical requirements depend on the configuration you select, and we confirm both in writing before production.

If your project needs a different footprint or jet count, compare the neighbouring models in the same range. Outdoor Swim Spa WS-S04, for example, is listed at 4090 × 2200 × 1110 mm with a different jet arrangement and lighting package. Reviewing two or three models side by side usually shows which dimensions are fixed by the mould and which can be adjusted to your space.

Six items to fix in the brief

1. Site, access and structure

Send a dimensioned plan of the intended location: terrace, rooftop, garden deck, villa courtyard or resort podium. Note the finished level, the load-bearing capacity of the slab or deck, clearances for maintenance access, and how a packaged unit will physically reach that point — crane lift, side access, or assembly in place. This single drawing prevents most schedule problems later.

2. Water system and jet layout

State the intended use: lap-style swimming against a current, hydrotherapy seating, children's play, or a mixed arrangement. That determines pump allocation, jet positions and whether a swim training system is required — WS-S04X does not list one as standard, so it is specified separately when needed. Tell us which seats or loungers need targeted massage and where the waterfall should discharge.

3. Sanitation and water treatment

Ozone appears in the catalogue specification for this model. Where a project calls for additional UV sterilisation, sand filtration or an alternative dosing arrangement, list it as an option so we can confirm compatibility with the selected shell and plumbing layout rather than improvising on site.

4. Heating, insulation and energy

The catalogue power figure covers the standard equipment set. A heat pump, thicker insulation, a cover or a fully enclosed cabinet changes both the specification and the running cost. Provide the ambient climate, target water temperature and expected season of use, and we will size the heating option accordingly.

5. Electrical and controls

Confirm supply voltage, phase, available circuit capacity and the location of the isolator and control panel. Local electrical requirements are set by your engineer or local authority; we match the equipment to the supply you confirm and state the requirement clearly on the wiring schedule.

6. Finish, accessories and branding

Specify cabinet finish, steps, lighting colour, control interface and any brand marking. Our Custom & OEM Service covers bespoke finishes, prototyping, private labelling and flexible minimum order quantities, which suits resorts, villa developers and dealers ordering a matched set of units.

What the brief unlocks on our side

With those six items settled, the process follows the workflow we run for every project: design and specification confirmation, quotation with detailed line items, production and quality control, then logistics and handover. We are a China-based furniture and building materials manufacturer supplying swim spas alongside outdoor furniture, bathroom ceramics, lighting, cabinetry and interior finishes, so a pool deck can be specified as one coordinated package — spa, loungers, pergola, storage and paving details — instead of several unrelated purchase orders.

Logistics is arranged as door-to-door freight with the export paperwork handled on our side, and installation support, inspection and after-sales service are part of the same scope. For hospitality and villa developments, that single point of contact across the whole outdoor area is where the real saving sits: fewer interfaces to manage, one specification to sign off.

Documents that speed up an accurate quotation

  • Dimensioned site plan with levels, access routes and lifting constraints
  • Intended use per unit: swim training, hydrotherapy, family or guest use
  • Target water temperature, season of use and climate data
  • Electrical supply details from your engineer
  • Required options: heat pump, UV, sand filtration, insulation, steps, cover
  • Finish schedule, quantities, delivery location and required site date

Send that package and the proposal comes back with a configuration you can check line by line — dimensions, pumps, jets, treatment, heating and controls stated explicitly, not implied by a model number. It is the difference between approving a specification and hoping one arrives.

FAQ

Can WS-S04X be built to a non-catalogue size?

Where the shell mould allows it, yes. Our Customizable Shape Outdoor Spa line covers square, round, oval and curved configurations for spaces that a standard footprint will not suit. Send the plan and we will confirm which geometry is feasible.

Is the listed power figure the final running load?

It reflects the catalogue equipment set. Heating, additional pumps and lighting options change the total, so the wiring schedule is issued against your confirmed configuration.

Can the spa be ordered together with poolside furniture?

Yes. Swim spas sit in the same Swimming Pools and Swim Spas range as our outdoor collections, and one project order can cover the spa, loungers, dining sets and shade structures for the same area.

To start a specification review, send your site plan and use case to SANTERSON. Contact: PHILLIP, Phone/WhatsApp +86-13928214007, Email santerson@qq.com — Contact Us.