A request for quote for an outdoor swim spa usually fails in one of two ways: it is too short, so every supplier quotes something different, or it is so long that nobody reads it. Neither produces a comparable price. If you are specifying the Outdoor Swim Spa WS-S08B for a villa terrace, a resort deck or a private residence project, the RFQ is the document that decides whether the delivered unit matches what your architect drew. Below is the checklist we work from when an enquiry arrives for this model, and what each item changes in the quotation you get back.
Start with the shell size, not the model number
Model codes are internal shorthand. Two projects can order "WS-S08B" and expect different things. Put the physical envelope in writing first: our catalogue shows this model at 7800 × 2200 × 1500 mm, and that is the figure your RFQ should quote back to us with your own site dimensions, stating clearly which side is the long axis on your plan.
Then add the three measurements that cause the most rework on site:
- Access route — door widths, lift dimensions, stair turns, gate clearances and the turning radius between the truck and the pad. A shell of this length that cannot reach the terrace has to be re-planned or built in sections.
- Support structure — whether the spa sits on a reinforced concrete slab, a raised timber deck or a plinth, and who is responsible for building it. Deck loading is a structural question for your engineer, not something a spa supplier can decide for you.
- Water level and overflow — where the drain, overflow and any spill containment run, and whether the surround finish (tile, stone, decking) meets the shell edge or overlaps it.
List the equipment you actually want in the cabinet
The specification published for this model shows 2 control systems, 4 water pumps, 2 filter pumps, 98 jets in total, 7 LED lights with 46 small LEDs, and a total power figure of 14.6 kW, with water jets, LED lighting, ozone and a waterfall shown as fitted features. Quote against that list line by line rather than accepting it as a block: the same shell can be built with different jet counts, pump arrangements and lighting layouts, and the electrical design follows from whatever is finally confirmed for your configuration.
For each item, state in the RFQ whether you want it included, excluded or optional:
- Jets — count and placement. Hydrotherapy zones for shoulders, back and legs are laid out differently from a general massage arrangement.
- Filtration and sanitisation — the standard filter pumps plus ozone; whether you also want UV sterilisation or sand filtration, which are catalog-listed options on this range.
- Heating — a heat pump is an option rather than an assumed inclusion, and it drives both the quotation and the electrical design. State your target water temperature and the coldest month the spa must stay in service.
- Insulation and cover — insulation level affects running cost more than any single component; specify whether an automatic or manual cover is in scope.
- Water features — the waterfall on this model, plus lighting colour behaviour if your designer has a scheme in mind.
- Accessories — steps, handrails and any cabinetry cladding or exterior finish that must match surrounding joinery.
One line worth adding: which features are not required. Buyers rarely say this, and it is the fastest way to bring a quotation down without cutting quality.
Give the electrical supply in full
With a total power figure of 14.6 kW on the standard configuration, the supply arrangement cannot be left for later. In your RFQ, provide:
- Supply voltage and phase — single-phase or three-phase, and the exact voltage available at the spa location.
- Available breaker capacity and cable run length from the distribution board.
- Whether a dedicated circuit, isolator and RCD/ELCB protection are already installed or must be added by your electrician.
- Local earthing and bonding requirements as set out by your electrical contractor and local regulations.
If you do not know these answers yet, say so explicitly and ask for the recommended supply specification instead. A supplier who quotes without this information is guessing, and the guess appears later as a variation order.
State the delivery terms and the site conditions
An outdoor spa is heavy freight with water, electrical and acrylic components in one package. Our furniture logistics and door-to-door delivery service covers sea, air and rail freight with customs paperwork and container loading, but the quotation only holds if the terms are fixed at enquiry stage. Include:
- The delivery address, port of discharge and the Incoterms you want quoted (FOB, CIF or delivered to site).
- Whether your own customs broker and importer of record are in place, or whether you need guidance on documentation.
- Crane, forklift or abseiling needs at the site, and the date the pad is ready.
- Inspection points you require before shipment — factory acceptance photos, a water-fill test, or your third-party inspector attending.
Say what happens after installation
Ask in the same RFQ for the commissioning support, warranty scope and spare-parts position for pumps, jets, controls and lighting. Also ask what is excluded. Our installation and after-sales support covers on-site installation, inspection and snags, warranty coverage, spare parts and ongoing maintenance; the exact terms depend on the configuration you order, so get them in writing against that configuration.
Ask about the surrounding outdoor fit-out at the same time
A swim spa is rarely ordered alone. Loungers, shade structures, storage and the pool-deck furniture usually arrive on the same project timeline, and coordinating them with one supplier removes a whole category of interface problems. If your enquiry covers more than the spa, say so — we supply outdoor furniture for villas and resorts alongside swim spas and building materials as a one-stop furniture and building materials supplier, so the deck furniture, pergola and spa can be quoted against one programme.
A short RFQ template you can copy
Send these eight items and a comparable, accurate quotation comes back:
- Model reference and shell dimensions as you intend to install them.
- Site photos plus the access route from kerb to pad.
- Support structure details and who builds it.
- Equipment list — included, optional and excluded.
- Electrical supply: voltage, phase, breaker capacity, cable run.
- Target water temperature and months of use.
- Delivery terms, port, Incoterms and site readiness date.
- Commissioning, warranty and spare-parts expectations.
Send that package for the Outdoor Swim Spa WS-S08B or any other model in our swimming pool and swim spa range, and you will receive a quotation you can compare line by line against your project budget — with the assumptions written underneath it.