Stone and marble wall panels travel better than most buyers expect — provided the packaging is agreed before production starts, not after the panels leave the factory. Because Santerson Stone & Marble Panels are made to measure for each project, the packing method has to suit the exact sizes on your shop drawings. This guide sets out what a procurement team should confirm with the supplier so the panels arrive ready to install.
Why packaging is a specification item, not an afterthought
These panels are configured per project: dimensions, material and finish are selected to suit each space, and the same configuration sheet that drives production should also drive how the goods are crated. A standard-size tile can travel in generic cartons; a made-to-measure panel with a cut-out for a switch plate or a full-height feature piece cannot. Ask the supplier to show you the packing plan against your dimension schedule, so you can see which panels share a crate and which travel alone.
Confirm the crate build and internal protection
For export freight, get the specifics in writing:
- Crate material and construction — plywood or timber cases suitable for sea freight, and whether they are fumigated or heat-treated where your import country requires it.
- Panel orientation in the crate — upright or flat — and how edges and corners are protected.
- Interleaving between faces, so polished surfaces do not rub during handling.
- Moisture barrier inside the case, which matters on long ocean passages and in humid port storage.
- Marking on each case: project reference, crate number, room or elevation, and panel code that matches your layout drawing.
Marking is the detail most often skipped and most keenly missed on site. When every case is labelled to a room or wall elevation, the installation crew can pull the right panel without opening everything in the sequence.
Agree how fragile pieces are separated from volume
A wall cladding order usually mixes full field panels with small cut pieces — niches, reveals, sills and matching offcuts. Small cut pieces in the same crate as large slabs tend to arrive chipped. Confirm that offcuts and trim are packed separately and boxed, and that spares for high-traffic areas travel in their own labelled container rather than loose at the bottom of a case.
Match packing to your delivery terms and unloading setup
SANTERSON's logistics service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. Those services only work smoothly when the crate sizes match what your site can receive. Before production, confirm:
- Whether you are taking container space or groupage, and how many crates that allows at the agreed dimensions.
- The heaviest single crate and its footprint, checked against your lift, forklift capacity and doorway widths.
- Who unloads at destination, and whether a tail-lift or crane is needed for the largest cases.
- Which documents arrive with the shipment — commercial invoice, packing list and certificate of origin — and that the crate count on the packing list matches the physical count.
If your project is in Australia or another long-haul market, ask for the loading plan for your container. A well-loaded container keeps crates braced and blocked so nothing shifts against a container wall during the voyage; a badly loaded one turns a good crate into a broken panel.
Decide what to do with related stone items in the same order
Many projects order wall panels alongside other stone elements, such as Santerson Stone & Marble Surfaces for bathrooms. Countertops, vanities and panels have different centre of gravity and different breakage points, so they should not be assumed to pack the same way. Confirm each line item has its own packing note, and check whether you want them on the same delivery or staged to suit your site sequence.
If part of the wall treatment uses a thin, flexible cladding such as our MCM flexible travertine stone veneer, packing differs again: sheet material that can wrap curved surfaces is packed flat or rolled per the supplier's instruction, not crated upright like rigid panels. Flag mixed rigid and flexible items in your enquiry so they are quoted and packed separately.
Set the inspection and claim procedure before shipping
Agree these points with the supplier in advance:
- Photographs of the packed crates and the loading plan before the container is sealed.
- Whether cargo insurance is included or arranged separately, and who holds the policy.
- The window for reporting damage after delivery, and the photographic evidence required.
- How replacement panels are produced and shipped if damage is found — replacements have to match the original batch in material and finish.
Replacement matching is worth stressing. With natural stone and marble-look finishes, batch variation means a replacement made later may not blend with the panels already on your wall. Ordering spares with the original shipment costs little and removes that risk.
A short checklist for your next enquiry
Send the supplier your dimension schedule, project location and delivery terms, then ask for: the crate specification and marking method; the packing list format with room or elevation references; the container loading plan; the heaviest crate weight; how cut pieces and spares are separated; and the damage reporting window. Confirm dimensions and selected specifications for each project before production release, so packaging is built around the panels you actually need rather than a generic case size.
As a China-based manufacturer of furniture and building materials working on villa, hospitality and office projects, SANTERSON handles packaging and container loading as part of its logistics service. Share your panel schedule early and the packing plan becomes a straightforward line in the order rather than an argument after delivery.