A modular living system with built-in lighting sits at the meeting point of joinery, furniture and electrical design. That is exactly where project problems start: the designer draws a lit shelving elevation, the buyer sends out an enquiry for "one wall unit", and nobody has agreed what the light actually is, where its driver hides, or who terminates the cable. The Santerson Modular System with Lighting (Living System) is made to measure for each space, so alignment on a small number of decisions early keeps the unit buildable and the lighting serviceable.
What the product page does and does not fix
The published description is deliberately open: finish, layout and dimensions can be specified to suit each space, and the lighting and electrical specification for the chosen configuration has to be confirmed. There is no single standard width, no fixed light fitting, and no declared driver on the page. For a designer that is freedom; for a buyer it means the quotation you receive only matches what you intend to install if the following items are written down before order confirmation.
Six decisions both sides should sign off
| Decision | What the designer should provide | What the buyer should confirm |
|---|---|---|
| Layout and module mix | Elevations showing open shelves, closed compartments and where lit sections sit, with overall height, width and depth taken from site survey. | Whether the unit runs floor to ceiling or floats on a wall, and whether adjacent finishes (plasterboard, joinery, flooring) are already fixed to those dimensions. |
| Finish and material | Named finish reference per surface, plus any matching requirement to floor to ceiling modular systems or cabinetry elsewhere in the same project. | Which surfaces are visible from a circulation route, and whether samples are required before production release. |
| Lighting specification | Fitting type, colour temperature, output and mounting position for each lit element — shelf edge, recessed channel, vertical reveal. | That the same specification reaches both the joinery quotation and the electrical contractor's scope, with no gap in between. |
| Power, driver and control | Location of driver or transformer, switching arrangement, dimming method if any, and access panel to every driver. | Which trade supplies the cable run, back box and isolator, and which supplies the fitting inside the unit. |
| Interface with the building | Setting-out dimensions from a fixed datum line, plus clearance for skirting, cornice or floor finishes. | Site conditions at the time of measurement — completed wet trades, cured screed, finished ceiling level. |
| Delivery and installation sequence | Whether lighting modules are pre-wired in the factory or wired on site, and the assembly order for tall units. | Lift, corridor and door clearances for the largest module, plus who carries out installation and inspection. |
The single most common failure: electrical scope left unassigned
When a lit wall system goes wrong on site, the cause is rarely the panel or the shelf. It is that the fitting supplier assumed the electrician would run a cable to the driver position, and the electrician assumed the unit arrived pre-wired. Two simple lines in the order documents remove this: one stating which party supplies and installs the mains cable, isolator and any control gear outside the unit; one stating which party supplies and connects fittings inside it. Add a dimensioned driver location drawing and an access requirement, and the detail stops being an argument at handover.
Where this system fits alongside related ranges
Living-room walls rarely use one module type. The Modular Living Systems collection also covers open modular units, closed modular units and mixed open and closed systems, so a single elevation can combine display shelving with concealed storage. Where the wall is shelving-led rather than living-room-led, integrated lighting is specified through Santerson Integrated Lighting Systems in the modular shelving collection. Specify the collection that matches the room use, then carry one consistent finish reference and one consistent lighting specification across both.
How a manufacturer-led process closes the gap
Because these units are made to measure, the handover from drawing to production is where mismatches get caught. SANTERSON works as a furniture and building materials manufacturer on villa, hospitality and office projects, with interior design services covering space planning, layouts and drawings alongside production coordination, bespoke finish and material choices through its custom furniture and interior products manufacturing, door-to-door logistics, and installation and after-sales support. For a buyer this means one party holds the dimensioned drawing, the finish schedule and the lighting schedule — which is precisely what prevents the driver-location argument above from reaching site.
Before you place the order: confirm dimensions, storage layout, finish, and electrical specification for the chosen configuration in writing. Lighting output, colour temperature, driver position and control method are project-specific and should appear on the approved drawing rather than in an email thread.
If you are specifying a lit living system for a villa or hospitality project, send the elevation, the room datum dimensions and your intended lighting positions together. That single package lets the layout, finish and electrical questions be answered in one pass instead of three.