A black aluminium frame kitchen looks finished on the drawing and unfinished on site the moment the frames arrive before the stone, or the stone arrives before the wall openings have been adjusted. Minimalist Black Aluminum Frame Cabinets are made to measure for each project, so the cabinetry is never the item that can be swapped out at short notice. This guide sets out how to sequence the cabinets against the rest of the kitchen fit-out - who confirms what, in which order, and which site conditions have to be settled before the units leave the factory.

Why a made-to-measure frame fixes your schedule

Frame-front cabinets sit at the meeting point of three trades: cabinetry, joinery and stonework. Because each run is built to project-specific dimensions, with the layout and finish confirmed per project, the production file follows the site survey rather than the other way round. That gives you one fixed date - the moment the opening sizes and front specification are signed off - and everything upstream has to be finished by then.

Plan backwards from that sign-off instead of forwards from the order date. The steps below assume SANTERSON's project workflow, which runs through design and planning, production, logistics, installation and after-sales support, with custom and OEM work handled in-house alongside the manufacturing.

The sequence that keeps delivery and installation aligned

Stage What has to be settled Who signs it off
1. Layout and front specification Run lengths, corner and appliance positions, frame profile, glass or solid panel choice, handle detail Designer or client representative, with the supplier's drawings
2. Site survey of the actual openings Finished floor level, finished wall faces, ceiling and bulkhead heights, out-of-plumb walls, position of soil, water and electrical points Site contractor plus supplier's technical review
3. Production release Signed drawings and confirmed dimensions; nothing changes after this point without a written variation Project manager
4. Long-lead items ordered in parallel Worktops and splashback stone, integrated appliances, sink and tapware, internal lighting circuits Procurement, against the same drawing set
5. First fix complete before the cabinets ship Services in their final positions, walls made good and square, floor screed or finish laid, site dry and clean Site contractor
6. Shipping and receiving plan Freight mode, delivery address, access route, storage area, who receives and checks the cartons Logistics coordinator plus site foreman
7. Installation and handover Level and aligned carcasses, door alignment, worktop templating after the cabinets are fixed, snag list closed out Installer with the site foreman; supplier follow-up on any snags

Two of these stages cause most of the delay on real jobs: stage 2, when survey dimensions are taken from unfinished walls, and stage 4, when the stone is ordered off a drawing rather than off the installed cabinets.

Site conditions to close out before the units ship

  • Finished floor level confirmed and documented. A made-to-measure base unit set is sized from the completed floor, not the screed.
  • Wall faces rendered, squared and checked for plumb. Frame cabinets read every deviation, so packing has limits.
  • Electrical and plumbing outlets in their final positions, with the appliance schedule frozen. Moving one oven housing after production release means rebuilding a cabinet.
  • Bulkheads, ceiling heights and any structural columns re-measured on site, not taken from architectural drawings alone.
  • Adjoining finishes - tiling, wall panelling, flooring thresholds - fixed in their build-up thickness so the reveal around the frames stays consistent.
  • Site enclosed, dry and heated enough for storage. Cartons stay sealed and stored flat indoors until the day each run is fitted.

Practical rule: if a dimension depends on work that has not happened yet, it is not a production dimension. Either finish that work before the survey or record the item as a variation with an agreed adjustment.

Splitting the delivery so nothing waits on anything else

Frame cabinets travel well and are packed for container loading, but they should not be the first thing on site or the last. Bringing them too early puts panels in a wet, busy space; bringing them too late leaves the fitter waiting while the stone sits on pallets.

  • Set the delivery window after first fix and before final decoration, so touch-up paint can cover fixing points without covering the cabinets.
  • Order worktops to template from the installed carcase run. Templating after installation absorbs small site tolerances that no drawing can predict.
  • Keep appliances and tapware on the same delivery week as the cabinets where the store can hold them; otherwise confirm storage conditions at their supplier first.
  • Agree who signs for the shipment, and photograph any damaged carton before it is opened. Report damage with the carton, not after disposal.

For overseas projects, freight by sea, air or rail is arranged with customs paperwork and door-to-door delivery, so the receiving plan needs a named person and a clear access route at the site end of that journey. Confirm Incoterms, duties and the exact delivery point for your address before booking production, since those terms decide whether the truck stops at the kerb or at the lift lobby.

Coordinating the rest of the black frame palette in one package

Black frames rarely stop at the kitchen. Buying the adjoining built-ins from the same project file means one set of survey dimensions, one shipment window and one snag list.

Glass fronts change the internal specification, so decide them at stage 1 rather than at survey: shelving layout, lighting inside the cabinet and the glass type all interact, and each one changes what the fitter needs on the day.

Installation day, step by step

  • Check the carton count against the packing list before opening anything, and lay out the run in fitting order.
  • Set the base run level and line across the whole wall first; a frame cabinet shows misalignment at the top of the run, not at the start of it.
  • Fix to the wall as the manufacturer's fixing detail requires, and confirm substrate suitability where walls are tiled or lined with plasterboard.
  • Hang and adjust doors after all carcasses are fixed, then set reveal consistency along the run before templating the worktop.
  • Walk the installation with the site foreman and write one snag list - door alignment, hinge adjustment, sealant lines, hardware function - rather than chasing verbal corrections.

SANTERSON provides on-site installation support and follow-up after handover, including warranty cover and spare parts for the components supplied. Ask for the specific terms that apply to your order in writing before production release; response-time figures quoted in marketing material are not a substitute for a scope you can hold someone to.

Five points to put in the purchase order

  • Survey dimensions and signed drawings attached, dated, and referenced as the production basis.
  • Front specification stated per run: frame colour, glass type or solid panel, handle detail.
  • Delivery address, delivery point and receiving contact named in the shipping terms.
  • Variation cut-off date, after which changes are re-priced and re-scheduled.
  • Snag and handover process agreed, including who closes out punch-list items on site.

Send your layout, opening dimensions and appliance schedule to SANTERSON, and the technical team will return drawings for review before anything enters production. Email santerson@qq.com, or reach the team by phone and WhatsApp on +86-13928214007 (contact name PHILLIP).