A single line on a plumbing schedule — “wall hung basin” — is enough to start an argument on site. It does not say whether the basin is vitreous ceramic or a lower-density body, how it is fixed to the wall, whether a tap hole is provided, or what trap and rough-in the waste connection expects. When we receive enquiries for Wall Hung Basin 1038WB, Ceramic Wall Mounted Wash Basin for Bathroom, the projects that run smoothly are the ones whose brief already answers those questions. This note sets out what to put in a procurement brief so the specification, the quotation and the delivered goods all describe the same basin.
What the 1038WB is, in the supplier's own terms
The 1038WB is a wall-mounted wash basin made from high-grade vitreous ceramic and fixed to the wall through a back panel, so it occupies no floor area and leaves the floor beneath clear for mopping. Its shape is a streamlined modern profile intended to sit with a range of bathroom decoration styles rather than one period look, and the bowl has depth designed to limit splashing during use. The listed applications are family bathrooms, guest washrooms, and hotel and commercial restroom projects, supplied for wholesale and bulk project orders.
That description is deliberately narrow, and a brief should be equally narrow. Write down what the product actually does — wall-fixed ceramic basin, no floor contact, back-panel mounting — and hold the supplier to it line by line. Anything else belongs in your own performance requirement, not in the product blurb.
Fixing method and wall build-up
“Wall hung” covers two very different situations on site: a basin carried by an embedded steel frame inside a stud wall, and a basin fixed into masonry or a solid backing. The 1038WB is described as fixed by back panel, which means the load path runs into the wall behind it. Before you issue the brief, confirm with your structural or services engineer what that wall will be — brick, block, framed with solid backing, or a lightweight partition with reinforcement — and state it in the brief. Ask the supplier to confirm the fixing detail for that build-up rather than assuming one fixing kit suits every wall type across a development.
This matters most in guest washrooms and high-traffic commercial restrooms, where basins take leaning, bags hanging off the rim, and daily cleaning. A brief that names the wall construction and asks for a matching fixing detail removes the most common reason a wall-hung basin is rejected at handover.
Trap, rough-in and drainage — the line item to leave open until it is verified
Ceramic basins of this type are supplied for either P-trap (wall outlet) or S-trap (floor outlet) arrangements, and the wrong choice means re-work at the waste connection. Our own product records for the 1038 series carry a caution here: dimensions, trap type and rough-in for these items must be checked against the final technical sheet before publication, because the marketing copy on the page is not a substitute for a drawing. So in the brief, do not state a rough-in figure taken from a web page. State the requirement instead:
- the outlet type your drainage design uses — wall outlet or floor outlet;
- the centre line and height of the waste connection as set on your services drawings;
- a request that the supplier return a dimensioned technical sheet, sized against your drawing, for written approval before production.
The same rule applies to the tap arrangement. Some wall-hung basins in this family carry a reserved tap hole for a single faucet; others are paired with concealed mixers or tall taps set on a ledge. Say which one your design uses, and ask for confirmation that the basin you are quoted matches it. A mixer arriving for a basin with no tap hole is a site problem nobody can solve neatly.
Specifying the ceramic body and glaze as a requirement
Vitreous ceramic with a seamless, dense glaze is what makes this category work in hotels: the surface resists water marks and limescale, wipes clean, and holds its colour under daily cleaning regimes. Write it as an acceptance criterion — vitreous ceramic body, fully glazed including the underside and the mounting face — and ask for the finish to be confirmed on a sample before bulk production. Housekeeping teams care about the result more than the material name: how the basin behaves after months of cleaning agents is what determines whether it still looks acceptable at the end of the warranty conversation.
Matching basins, WCs and bidets into one suite
Where a project repeats the same bathroom detail across many rooms, ordering to a single series keeps the profile, radius and glaze consistent from guest floor to guest floor. In this catalogue the 1038 items are designed to sit together: the Wall Hung Toilet 1038W, Rimless Ceramic Wall Mounted WC for Modern Bathroom shares the same clean-lined approach and leaves the floor empty in the same way, and the Floor Standing Bidet 1038F, Ceramic Bidet Basin for Bathroom Hygiene is offered as a match for the same series where the market expects a bidet. Where a project wants a different size or profile, alternatives in the same mounting type are worth putting side by side in the brief — the Wall Hung Ceramic Basin 1051B, Modern Wall Mount Bathroom Sink is a smaller curved option listed at 400×380×450 mm for compact bathrooms, while the Wall Hung Ceramic Basin 1004B, Modern Wall Mount Bathroom Sink is a wider trapezoid form. Comparing two or three candidates on one page of the brief — size, fixing, outlet type, tap hole — makes the value-engineering decision visible rather than something done verbally at a site meeting.
Quantities, spares and batch consistency
Sanitaryware is usually shipped in containers, so order quantities should follow your room schedule plus a spare allowance for the maintenance team — typically spares held for the first years of operation rather than none at all. Ask for the whole of one bathroom group to come from a single production batch where glaze tone and profile consistency matter across a visible run of rooms, and record the model code exactly as quoted on your schedule so that a later top-up order can be matched. Where a project needs non-standard quantities or finishes, our Custom & OEM Service covers bespoke material finishes and textures along with flexible minimum order quantities.
What the brief should ask the supplier to return
A procurement brief is only finished when it tells the supplier what evidence to send back. For a wall-hung basin package we recommend asking for:
- a dimensioned technical sheet for the exact model quoted, including outlet type and rough-in;
- the recommended fixing method for your stated wall build-up;
- confirmation of tap hole or no-tap-hole configuration against your mixer selection;
- a physical sample or approved image of the glaze finish before bulk production;
- packing and loading information, so your receiving team can check cartons against the room schedule on arrival;
- the written scope for delivery, installation support and after-sales cover — our service pages describe door-to-door freight with customs paperwork, plus on-site installation, snag inspection, warranty and spare-parts support.
Ask for those six items in the enquiry itself. Suppliers who cannot return them are not going to be useful twelve months later when a replacement part is needed.
A short checklist for the brief
| Section of the brief | What must appear |
|---|---|
| Product identity | Exact model code and product name, not a category term; link or drawing reference. |
| Material | Vitreous ceramic body, seamless full glaze including underside and mounting face. |
| Mounting | Wall-fixed by back panel; state the wall build-up and request the matching fixing detail. |
| Drainage | Your outlet type and connection setting-out from services drawings; supplier to confirm against technical sheet, not marketing copy. |
| Taps | Tap hole or concealed/tall mixer, stated explicitly and cross-checked with the basin quoted. |
| Suite consistency | Series code for WC and bidet where a matching set is required; single batch for visible runs. |
| Commercials | Room-schedule quantities, spares allowance, packing list format, delivery and after-sales scope in writing. |
Every figure that is not on an approved drawing should appear in the brief as a question, not as a number. That single habit prevents the majority of disputes over sanitaryware on fit-out projects.
Send us your bathroom schedule
If you are putting together a sanitaryware package for a hotel, villa or commercial restroom project, send the room schedule and services drawings and we will quote against them — including the dimensioned technical sheet, fixing detail and packing plan described above. As a China-based furniture and building materials supplier working on turnkey villa, hospitality and office projects, SANTERSON supplies bathroom ceramics alongside the cabinetry, lighting, flooring and finishes that surround them, so one specification can be coordinated across trades instead of defended separately. Contact PHILLIP via the contact page to start the review.