The catalogue entry for Outdoor Swim Spa WS-PC07ST-L gives a spec sheet, a footprint and a list of fitted features. It does not tell you whether that unit is the right one for your site. The useful next step is to line it up against the other configurations in the same range and decide, point by point, which differences actually matter for the project you are quoting.

Start from what the reference model already fixes

In our catalogue, WS-PC07ST-L is listed at 7490 × 2400 × 1470 mm, with one control system, one swim training system, one filter pump, six jets and four LED lights, at a total power figure of 6.55 kW. Water jets, LED lighting, ozone and the swim training system are all shown as fitted features.

Read those numbers as a starting position rather than a finished specification. The same page notes that included equipment and electrical requirements still need confirming for the configuration you select, and options such as heat pumps, water pumps, UV sterilisation, sand filtration, insulation and steps are listed separately with availability varying by model. So the first comparison question is never “which model looks nicer” — it is “what has to be added to this configuration before the unit can actually run on site”.

Compare within the family before comparing across families

The fastest comparison is usually against the closest siblings, because they share a shell design and a water system layout. Two examples from our range:

  • WS-PC07ST — 7000 × 2400 × 1470 mm, with the same control system, swim training system, filter pump, six jets, four LED lights and 6.55 kW total power shown in the catalogue.
  • WS-PC07ST-S — also 7000 × 2400 × 1470 mm, with the same equipment list plus an automatic cover option shown among its features.

That is a clean, practical comparison. The equipment specification of WS-PC07ST and WS-PC07ST-L reads the same in the catalogue; what changes is length — 490 mm of it — and, on the -S variant, whether an automatic cover is part of the conversation. If your constraint is a narrow deck, that half-metre decides the model. If your constraint is how often the spa is used and by whom, the cover option may matter more than the extra length.

If you want to see what sits either side of 7490 mm, WS-PC08ST-L is catalogued at 8490 × 2400 × 1470 mm with the same jet count, LED count and total power shown. A longer channel buys swimming length; it also consumes deck space and affects how the unit reaches the site.

The four criteria that actually separate the options

1. Usable length versus available footprint

Overall length is not swim length, but it is the number your drawings work from. Measure the clear opening, the access route from the delivery vehicle and the working space you want around the cabinet for servicing — not just the rectangle the unit occupies once installed. Then compare catalogued dimensions across models rather than assuming one shell size covers the site.

2. Electrical capacity at the board

A 6.55 kW total power figure is what you budget supply and protection against, and it moves once heating is added. If a heat pump or extra insulation goes into the specification, ask for the revised electrical requirement before the electrician prices the works. This is where two otherwise identical models can end up with very different installation costs.

3. Water treatment and maintenance routine

Ozone appears as a fitted feature on these configurations, with UV sterilisation and sand filtration offered as options. Decide who maintains the unit — an owner, a groundskeeper, a hotel engineering team — and choose the treatment package around that reality. A system no one is trained or rostered to maintain becomes a problem within a season.

4. How the unit is used, not how it looks

A swim training system and six jets point at daily laps plus hydrotherapy. If the brief is really an all-season plunge with seating, a spa configured around relaxation rather than swimming length may serve better — our luxury outdoor swim spa with massage jets, LED and water features and the customizable-shape outdoor spa cover briefs where the shell shape and the relaxation zone lead the design instead of a standard catalogue length.

Build a shortlist, then request matched quotations

Take two or three models that pass the footprint and power tests — for most buyers comparing against WS-PC07ST-L, that means WS-PC07ST and one longer or cover-equipped variant. Ask us to quote each on the same basis: confirmed equipment list, options included, total power with heating, insulation level, delivery scope and steps. Quotations that are built on different option sets are not comparable, and that is usually where a project later discovers it has bought the wrong configuration.

Browse the full range in Swimming Pools and Swim Spas, or send us your site dimensions, intended use and available power so we can tell you plainly whether WS-PC07ST-L is the right specification — or which alternative in the range is.