A wall-hung basin looks simple on a drawing, which is exactly why its finish surprises people on site. Before we start production for a guest-bath package, we ask project buyers to approve physical finish samples for the Wall Hung Ceramic Basin 1004B, Modern Wall Mount Bathroom Sink and everything it has to sit against: faucet, wall finish, tapware height and the matching pieces of the same series. Below is the sample-review routine our project team follows, written so you can run the same check with your own supplier.

What the 1004B actually is

The 1004B is a wall-mounted vitreous ceramic basin with a glossy glaze and a trapezoid silhouette, fixed to the wall by its back panel rather than standing on a pedestal or cabinet. Its listed body size is 510×420×380 mm, it has one tap hole for a single faucet, and it belongs to the 1004 sanitary series, which also covers the 1004A one-piece washdown toilet and the 1004S freestanding pedestal basin. Sample approval therefore has two levels: the basin surface itself, and how that surface reads next to the rest of the room.

Treat every dimension on a product page as a starting point. Our own records note that sizes and plumbing rough-in details must be confirmed against the current technical data sheet before publication, so the sample pack is also where you lock down the numbers your installer will work to.

Step 1 — Decide what a "finish sample" means for this item

For a glazed ceramic basin, there is no paint or veneer swatch to choose. The finish decisions you can genuinely verify are the surface quality of the glaze and the hardware that touches it. Ask your supplier to confirm, in writing, which of these the approved sample represents:

  • Glaze colour and gloss level on the visible faces, including the underside and back panel edge that stay partly visible after mounting.
  • Surface defects you will accept: pinholes, seed marks, orange peel, glaze run, or an unglazed patch at the fixing area.
  • Tap hole position and diameter relative to the faucet spout and lever you have selected.
  • The wall-fixing method shown on the sample — back-panel fixing — and whether it suits your wall build (timber stud, steel stud, brick, or framed cavity with a concealed cistern).

If your specification calls for a specific surface treatment, water-efficiency or performance standard for the destination market, that belongs in the same written confirmation. Do not assume a sample carries certification it has not been given.

Step 2 — Match the basin against the finishes around it

A glossy white ceramic face is a reference surface. Once it is on the wall, every nearby material is judged against it. Lay the sample, or a full-size mock-up board, next to the actual candidates you are specifying:

Element to reviewWhat to check with the basin sample present
Wall tile, stone or waterproof membrane finishWhite-on-white contrast, whether the ceramic reads grey or warm against the wall, and grout line alignment with the basin's trapezoid edges.
Faucet finish (chrome, brushed, matte, gold-toned)Reflection of the tapware in the glaze, plus spout reach and clearance over the bowl rim.
Waste and trap setVisible waste style against the underside curve, and whether the trap sits inside the wall cavity or shows below.
Matching 1004 series piecesGlaze consistency between basin, toilet and any pedestal basin in the same bathroom group; slight glaze differences between ranges are visible when items sit side by side.
Adjacent joinery or vanity in the same projectIf a room also uses made-to-measure pieces such as a floating vanity, check ceramic white against cabinet door white at the same time of day.

Do this review in the room, or under lighting that copies the room's colour temperature. A glaze that looked clean under a bright warehouse light can pick up a cast under warm vanity lighting.

Step 3 — Check the practical details a photo cannot show

The three complaints we hear most about wall-hung basins after handover are not about looks. They are about height, splash and cleaning access. Test these with the sample or mock-up in place:

  • Rim height and user reach. Mark the finished rim height on the wall and have people of different heights use it. Guest bathrooms shared by families and staff need one compromise height, not two ideal ones.
  • Backsplash zone. With water running at normal pressure, see where spray lands on the wall finish behind and beside the basin, then confirm that zone is tiled or otherwise sealed to full splash height.
  • Cleaning access under and behind the unit. Wall-hung basins leave the floor open, which is the point. Check that the gap underneath can be reached with the cleaning equipment your housekeeping team actually uses, and that no pipe or bracket blocks it.
  • Tap hole use. The 1004B is specified with a tap hole for single-faucet installation. If your design needs a different faucet configuration, settle it before production, not on site.
Practical note from our own documentation: rough-in and trap details for ceramic items in this range are recorded as "to be confirmed against the current technical data sheet". Ask for that sheet with the sample pack and have your plumber sign off the set-out before the first unit is fired to order.

Step 4 — Use the same sample round for the whole guest-bath group

Guest bathrooms are small, so mixing ranges shows up quickly. Where the design calls for a consistent look, review the basin alongside the rest of the sanitary set in one pass:

  • The 1004A one-piece toilet is offered with two drain options — P-trap wall outlet and S-trap floor outlet — so its rough-in has to be fixed per room type before ordering, not at installation.
  • Where a floor-standing option suits a room better, the matching 1004S pedestal basin shares the series glaze and can be sampled together with the 1004B.
  • If a project needs a decorative accent instead of a plain white surface, other wall-hung basins in the catalogue carry gold-line detailing, for example the 1050WB Luxury Gold Line wall basin. Sample both options side by side if the choice is still open.
  • Shower hardware in the same bathroom affects the perceived finish. A matte gun grey digital display rain shower system next to high-gloss ceramic needs one deliberate decision about contrast, not two separate purchases.

Step 5 — Sign the sample off in writing, then hold it

The approval itself is what protects you later. A sign-off sheet that works for ceramic orders records:

  • Sample reference number, product model, and the date the sample was received.
  • Named approver and the room or room type the sample applies to.
  • Confirmed dimensions from the technical data sheet, including rough-in and drain type per room type.
  • Agreed acceptable surface condition, with any defect limits written down rather than implied.
  • The packaging and protective packing agreed for bulk shipment, since glazed items are the ones that arrive chipped.

Keep one approved sample on site until handover. When a delivery looks different from what you ordered, comparing it against the retained sample settles the conversation far faster than comparing it against a photograph in an email thread.

How this fits a larger fit-out order

If the same project is also ordering cabinetry, flooring, lighting and wall finishes from one source, finish samples should arrive as one coordinated pack rather than in five separate parcels over two months. That single change removes most of the rework we see in guest-bath packages: the ceramic, the joinery whites and the tapware get compared once, by the same person, on the same day.

SANTERSON works as a furniture and building materials manufacturer supplying bathroom ceramics alongside cabinetry, lighting, flooring and interior fixtures, with custom and OEM service for project-specific requirements. Send us your room list, the finishes you are considering, and the technical drawings, and we will confirm specifications against current data sheets before production begins.

Contact PHILLIP on WhatsApp +86-13928214007 or email santerson@qq.com to arrange a sample pack for your project.