A swim spa in the 5-metre class is one of the easier ways to put a lap-swimming channel and a hydrotherapy zone on the same shell. That is exactly where Outdoor Swim Spa WS-115Fⅴ sits, and it is also where most specification arguments start. The shell itself is only the starting point: pumps, jets, water treatment, heating, controls and the finish all get chosen separately, and two buyers with the same model number can end up with very different installations.

If you are a builder, a villa owner or a procurement lead comparing quotations, the questions below are the ones worth putting in writing before an order is placed. They decide whether the delivered unit matches the site it is being built for.

Start with the shell, then confirm what the quoted configuration includes

The catalog entry for WS-115Fⅴ lists an outer footprint of 5000 × 2200 × 1250 mm. That length is long enough for a continuous swim channel against a counter-current unit, while the width leaves room to seat jet groups along one side without intruding into the swimming lane. Depth matters most for who uses the spa: an adult standing in it behaves differently from a child or an older family member using it for gentle exercise, and steps and seating depth should be settled at the same time as the shell.

The catalog specification for this model lists one control system, one swim training system, one water pump, one filter pump, 24 jets in total, four LED lights and a total power figure of 8.05 kW. Treat that list as the baseline you are quoting against, not as a fixed delivery package. The equipment actually fitted, and the electrical supply it expects, should be confirmed for the specific configuration you order.

Six customisation topics worth settling before you order

  • Swim training system. WS-115Fⅴ is listed with a swim training system as part of the shown configuration. Ask which unit is being quoted, how the flow is adjusted, and whether variable speed control is included. A swim channel used for daily training and one used occasionally for play do not need the same setup.
  • Jet layout and count. The catalog lists 24 jets in total. Where those jets sit, and how strong they are, is what separates a relaxation zone from a targeted massage area. Send your plan view and mark who sits where; jet positions behind a seat are very different from jet positions in open water.
  • Filtration and water treatment. The baseline includes one filter pump, and the catalog options include UV sterilisation and sand filtration alongside ozone. Which combination you choose affects how often the water needs attention, and it should match how heavily the spa will be used.
  • Heating and insulation. Heat pumps and insulation appear in the catalog option list. These are the items that decide running cost in a cool climate, and they interact with how often the cover is on. A spa used year-round should be specified differently from one used seasonally.
  • Controls and lighting. One control system and four LED lights are listed. Confirm the controller interface you want and where the lights sit, especially if the spa will be viewed from a terrace or pool deck at night.
  • Access and cabinet finish. Steps are on the option list, and the cabinet exterior is what the spa presents to the rest of the landscape. Deck height, step position and cladding colour need to be agreed with the landscaper, not left to the installation week.

Power, site work and the paperwork that follows

The 8.05 kW total power figure is a specification input for your electrician, not something to assume is compatible with an existing circuit. Supply capacity, protection devices and cable routing should be confirmed against the configuration you have chosen, and against local requirements in the country of installation. The same applies to drainage, a level load-bearing base, and access for delivery.

Buyers outside China usually receive these units by sea, so the order also carries packaging, container loading and customs paperwork. That is why it is worth specifying everything at once rather than adding options later: a heat pump or a filtration upgrade agreed after production has started costs far more than the same item quoted up front.

Baseline specification as listed in the catalog

ItemAs listed
ModelWS-115Fⅴ
Catalog dimensions5000 × 2200 × 1250 mm
Control system1 set
Swim training system1 set
Water pump / filter pump1 pc each
Jet total24 pcs
LED lights4 pcs
Total power8.05 kW
Features shownWater jets, LED lighting, Ozone, Swim training system

Catalog-listed options include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so the selected configuration should be confirmed before ordering.

If you need a different size or shape

The 5000 mm length will not suit every plot. Where the terrace is shorter, the 3880 mm WS-115Aⅴ keeps a comparable width and height in a more compact footprint. Where the site is wider, longer models in the same range run to 8000 mm and beyond. For layouts that cannot follow a rectangular cabinet at all, Customizable Shape Outdoor Spa covers square, round, oval and curved shells in an acrylic body with structural reinforcement, which is the route to take when the architecture, rather than the product line, sets the shape.

All of these sit inside a wider Swimming Pools and Swim Spas range, alongside pools and hot tubs that often get specified for the same project. SANTERSON is a China-based furniture and building materials manufacturer operating since 2008, so an outdoor area can be specified as one package: the swim spa together with aluminium-frame outdoor lounge pieces and pergolas that stand beside it, plus the flooring, wall panels and lighting around the deck. Cabinet finish, cladding colour and step design can then be matched across the whole space under Custom & OEM Service, instead of coordinating three separate suppliers on one site.

A practical note on comparison: quotations that look identical at model level often differ once jet count, filtration type, heating method and insulation are itemised. Ask every supplier to list the same items in the same order, then compare line by line rather than comparing headline prices.
Send us your plan. Share the site dimensions, how the spa will be used, and your local power supply, and we will confirm which configuration of WS-115Fⅴ fits — including options, packaging and door-to-door delivery. Contact PHILLIP, phone / WhatsApp +86-13928214007, email santerson@qq.com, or use the contact page.