A stone or marble panel quote that lists only a unit price is not comparable with any other quote on your desk. Two suppliers can both write "travertine finish, feature wall" and deliver completely different assemblies, fixing systems and freight arrangements. Before you sign anything, work through the checklist below — it is the sequence we use ourselves when our engineering team prepares stone & marble panels for villa, hotel and office projects.
1. What exactly is being priced: material, assembly or finished wall
The first line to read is the scope statement, not the number. Ask whether the price covers the panel face only, or a full wall build-up including substrate, framing, adhesives, trims, corner pieces and sealants. A low unit rate that excludes substructure usually lands higher than a fully described assembly once site works are added.
- Natural stone or marble slab panels, cut to the dimensions on your setting-out drawings.
- Thin, bendable stone veneer for curved walls, arches and columns — see MCM flexible travertine stone veneer, which is supplied in rolls and can be cut and bent on site.
- Mineral decorative sheets with a stone-look surface, such as our flexible rock stone panel, used where weight and logistics cost matter.
- Rammed-earth appearance cladding for lobbies, restaurants and homestay projects, described on the product page as MCM flexible rammed earth panel.
- Metal composite cladding with a stone finish, for example the aluminium honeycomb panel offered with natural stone veneer or solid coating.
Each of these behaves differently on a wall. The quote should name the system you actually designed, not a generic "stone panel" line item.
2. Dimensions, tolerances and the setting-out drawing
Ask for a panel schedule attached to the quotation: every size, thickness, edge condition and quantity, tied to a numbered wall elevation. Where the panels are made to measure — as our stone & marble panel range is configured — the schedule is the document that protects both sides.
- Confirm who produced the setting-out drawing and whether openings, skirtings, cornices and service outlets are dimensioned on it.
- Check stated tolerances for panel size, thickness and joint width, and how site deviations will be handled.
- Ask how corners, reveals and edges are detailed: mitred, bull-nosed, square arris or covered with a trim profile.
- Confirm the allowance for cuts and breakage, and who pays for re-orders caused by measurement error.
3. Finish, veining and approval samples
Stone and marble are variable materials, so the finish description needs to be more specific than a trade name. Ask the supplier to state the surface treatment — honed, polished, flamed, bush-hammered or split-face — and whether veining and colour tone will be selected and numbered at the factory.
- Request physical samples before production, and keep signed samples with your purchase order.
- Ask whether a first article or mock-up panel is produced for approval before the full batch is released.
- Check whether sealers or anti-stain treatments are included in the price or quoted as an extra.
- For patterned and customised finishes, confirm how colour matching is agreed: sample number, RAL reference or a signed visual standard.
4. Fixing method and interface with the substrate
This is where most stone panel quotes become vague. Ask which fixing system the price assumes, because it changes both cost and programme on site.
| Fixing approach | What the quote should state |
|---|---|
| Adhesive to a flat cementitious or gypsum board base | Adhesive type and coverage rate, required substrate flatness, whether primer is included |
| Mechanical fixing to framing | Battery or rail layout, bracket and anchor specification, allowable panel weight per square metre |
| Dry-hung or rail system for facades | Rail material, drainage and joint detailing, access provision for services behind the wall |
Flexible stone sheets are installed with tile adhesive onto a cement or gypsum base and can be cut on site with simple tools, so their quotes should confirm base preparation rather than heavy lifting gear. Rigid natural stone slabs require the opposite assumption. If your quotation does not make this clear, ask for it in writing before award.
5. Packaging, freight terms and delivery sequence
Breakage claims almost always trace back to a packaging line that was never specified. Ask how panels are crated — edge protection, vertical or flat packing, moisture barrier — and what the quotation excludes.
- Incoterms and named destination: door-to-door delivery is convenient, but confirm who handles customs clearance, duties and last-mile unloading at your site.
- Packing list detail: crate marks matched to the wall numbers on your setting-out drawing, so crews know which crate goes to which level.
- Delivery sequence for phased projects, especially when interior feature walls are installed room by room.
- Cargo insurance: whether it is included in the price or offered as an option.
Our logistics service covers sea, air and rail freight forwarding with commercial invoices, packing lists and certificates of origin prepared for the shipment; terms, duties and transit times are confirmed project by project rather than assumed from a brochure.
6. Commercial terms that change the real cost
| Clause to check | Why it matters |
|---|---|
| Price validity period | Stone, resin and freight costs move; an open-ended quote can be re-priced mid-project. |
| Payment stages and release of production | Confirms when long-lead cutting starts and what happens if your site programme slips. |
| Minimum order quantity | Determines whether a small feature wall is priced as a sample run or a production batch. |
| Warranty scope and exclusions | Distinguishes coverage on the panel body from coverage on finish, sealant and installation workmanship. |
| Spare parts and future batches | Tells you whether a matching batch can be produced years later for repairs or extensions. |
7. A five-minute comparison routine
Put every quote into the same table before you decide: scope covered, panel system and thickness, finish and sample status, fixing method, packaging standard, delivery terms, price validity, warranty scope. Two quotes that look 20% apart on unit rate often converge once these columns are filled — and the difference that remains is usually a real one you can negotiate.
Before signing, confirm in writing:
☐ Full panel schedule tied to numbered wall elevations
☐ Surface finish and sample reference recorded on the order
☐ Fixing system and substrate preparation stated
☐ Packaging standard and crate marking method agreed
☐ Delivery terms, insurance and unloading responsibility defined
☐ Warranty scope, exclusions and spare-batch policy documented
Frequently asked questions
Should I compare stone panel quotes by price per square metre?
Only after the scope columns match. Price per square metre is meaningless when one supplier includes framing, trims and sealants and another supplies panels alone.
What if my wall is curved?
Rigid slabs cannot wrap a curve. Flexible stone veneer and mineral decorative sheets are supplied in rolls, bent onto the prepared base on site, and detailed for arches, columns and special-shaped surfaces.
Can one supplier handle both wall panels and the rest of the fit-out?
Coordinating wall finishes with joinery, countertops, doors and lighting through a single furniture and building materials manufacturer reduces interface disputes between trades. That is how we work on villa and hospitality projects, from design coordination through production to site installation.
Send us your wall elevations, the panel system you have specified and your destination port or site address, and we will return a quotation with a full panel schedule, fixing notes and delivery terms you can compare line by line against your other bids. Enquiries go to our project team.
SANTERSON — furniture and building materials manufacturer in China, supplying custom stone and marble panels, wall systems and interior fixtures for residential, hotel and office projects worldwide.