A seven-metre swim spa is a large, long commitment item on any villa or resort procurement list. It arrives as a single oversized module, it carries pumps, lighting and water treatment inside a shell that must stay watertight for years, and it has to pass through site access, electrical connection and handover without becoming the item that delays the rest of the landscape works. That is why the shortlisting decision matters more than the brochure.
This guide uses our Outdoor Swim Spa WS-S07M as the worked example, because it shows the kind of specification a buyer should be able to obtain in writing from any supplier under consideration. The checks below apply whether you compare us with other factories or simply want to confirm that a model we build matches your site.
Start With the Specification Sheet, Not the Render
Marketing images tell you how a swim spa will look on a terrace. They do not tell you whether it fits the pad, the crane route or the supply pillar. Before any supplier goes on a shortlist, ask for the same six data points in writing and compare them line by line:
- Overall envelope — length, width and height, plus shell depth, so you can check clearance against fencing, gates and setbacks.
- Pump count and duties — how many water pumps and how many filter pumps, since these drive both performance and the electrical load.
- Jet configuration — total jets, plus any separate water columns or waterfall features, because hydrotherapy zones are defined by layout as much as by count.
- Total connected power — the figure your electrician designs to, and the basis for any upgrade works.
- Water treatment included as standard — ozone, filtration type and what is optional.
- Options quoted separately — heat pump, UV sterilisation, sand filtration, insulation, steps and control upgrades.
A supplier who cannot produce these numbers quickly, or who answers with "it depends" every time, will be difficult through production and handover as well. A supplier who sends a structured sheet is showing you how their project documentation will look later.
What the WS-S07M Specification Shows
For reference, this is the catalog specification we publish for the WS-S07M. It is one of the deeper configurations in our seven-metre group, and it adds waterfall and water-column features:
| Specification | Outdoor Swim Spa WS-S07M |
|---|---|
| Catalog dimensions | 7000 × 2200 × 1480 mm |
| Water pumps | 3 pcs |
| Filter pump | 1 pc |
| Jet total | 40 pcs |
| Total connected power | 10.75 kW |
| Control system | 1 set |
| Features shown | Water jets, LED lighting, Ozone, Waterfall, 4 water columns |
Figures are the catalog values published for this model. Included equipment and electrical requirements depend on the configuration selected, so confirm them for your order before any site works begin.
Compare Within the Same Range Before Comparing Factories
Most buyers shortlist factories too early. The cheaper decision is to first settle on the size and feature set, because that comparison changes your foundation, power supply and maintenance plan far more than the name on the shell does. Within our swimming pool range, these models show how the numbers shift from one footprint to the next:
| Model | Catalog dimensions (mm) | Water pumps | Jet total | Total power |
|---|---|---|---|---|
| Outdoor Swim Spa WS-S04 | 4090 × 2200 × 1110 | 3 pcs | 26 pcs, plus 4 water columns | 8.25 kW |
| Outdoor Swim Spa WS-S06 | 5820 × 2220 × 1110 | 2 pcs | 56 pcs | 6.35 kW |
| Outdoor Swim Spa WS-S07B | 7000 × 2200 × 1335 | 3 pcs | 48 pcs | 13.35 kW |
| Outdoor Swim Spa WS-S07M | 7000 × 2200 × 1480 | 3 pcs | 40 pcs | 10.75 kW |
| Outdoor Swim Spa WS-S08M | 8020 × 2260 × 1280 | 2 pcs | 58 pcs | 6.95 kW |
| Outdoor Swim Spa WS-S10 | 10000 × 2200 × 1420 | 2 pcs | 76 pcs | 7.65 kW |
| Outdoor Swim Spa WS-S12 | 11740 × 2200 × 1470 | 2 pcs | 73 pcs | 7.65 kW |
Two things stand out in a table like this, and both are useful when you interrogate any quotation. First, length does not track connected power — a longer shell can run on fewer pumps at a lower total load than a shorter one. Second, models of identical length differ in shell depth, jet count and connected power, which is why "7 metre swim spa" is never a sufficient line item on a purchase order. Ask for the model code and its sheet.
Where a standard footprint will not work at all — a curved terrace edge, an oval well, a spa set into a deck with a specific sightline — we also build customizable shape outdoor spas in square, round, oval and curved layouts, with an acrylic shell and structural reinforcement sized to the design.
Six Checks That Separate Manufacturers on the Shortlist
1. Does the factory build it, or broker it?
Ask which production line the unit comes from and request a video walk-through of that line with your model code visible. SANTERSON has operated as a furniture and building materials manufacturer in China since 2008, and our project scope covers design, custom/OEM production and door-to-door delivery, so a swim spa can sit on the same project file and documentation process as the joinery, outdoor furniture and finishes around it — one point of accountability rather than several intermediaries.
2. Can they quote options separately and honestly?
Heat pumps, UV sterilisation, sand filtration, insulation and steps are catalog-listed options across our range, but availability and compatibility vary by model. A manufacturer who flags incompatibilities at the quotation stage is saving you a site variation later. One who says yes to everything is guessing.
3. Is the electrical information usable?
Total connected power is only the start. Ask for the supply arrangement, protection expectations and how control system placement works on site, then hand that pack to your electrician rather than relying on a generic figure. Confirm the requirement for the configuration you order, not for the base model in the brochure.
4. How is the unit packaged, loaded and tracked?
A swim spa is a low-value-density, high-risk shipment: one shell, no spare, and damage on arrival means months of delay. Ask how the shell is crated, how it is positioned in the container, who prepares customs paperwork, and whether you get a named logistics contact. Our logistics service covers sea, air and rail freight forwarding, packaging and container loading, commercial invoices and packing lists, shipment tracking and door-to-door delivery.
5. Who answers when something fails after handover?
Pumps, control boards and jet fittings are service items. Ask which parts the manufacturer ships as spares, how a failed component is replaced, and what inspection and snagging happens at installation. Our service pages list on-site installation, inspection and snags, warranty coverage, spare parts and replacement, and ongoing maintenance; ask for the current terms in writing for your project before you rely on them.
6. Do they understand the rest of your project?
A swim spa rarely stands alone. It sits beside pergolas and cabana daybeds, poolside loungers, outdoor dining sets and wet-area storage, and all of it has to agree on levels, materials and handover dates. A supplier who can produce several of those categories under one project file reduces the coordination burden on your site team.
A Shortlisting Checklist You Can Send Today
- Model code and full specification sheet, signed and dated
- Catalog dimensions versus the prepared pad, with access route confirmed
- Pump, jet and water feature layout drawn to scale
- Total connected power and supply requirements for the selected configuration
- Standard inclusions listed separately from priced options
- Crating drawings and container loading plan
- Named project and logistics contacts, with tracking arrangements
- Installation scope, snag list process and spare-parts policy
- Written confirmation of anything a salesperson promised verbally
Send that checklist to three or four suppliers. The quality of the returned documents is itself the shortlisting result — it tells you who will produce reliable submittals during production and who will not.
Next Step
If the WS-S07M envelope, jet layout and connected load suit your site, send us the pad dimensions, access constraints and supply arrangement and we will return a specification pack with options priced separately. If it does not, the same pack will show which model in the range does — and if no standard footprint works, we will quote the custom shape instead.
Talk to us about swim spa configurations for villa, resort and hospitality projects. Contact SANTERSON or browse the full swimming pool range.