A compact swim spa looks simple on a specification sheet: one shell, a set of jets, a pump or two, a light. In practice the difference between a smooth handover and an expensive site problem usually sits in the finish details — what is actually included in the shell package, how the equipment is arranged, and which items are supplied by the factory versus prepared locally. This guide walks through the confirmation points we ask buyers to sign off before production starts on Outdoor Swim Spa WS-PC01A, using the catalogue figures for this model as the reference.
Start from the shell size, not the marketing photo
WS-PC01A is listed at 3000 × 930 mm. That single line drives three decisions you need to lock early: where the unit sits, how it reaches the site, and what the surrounding deck or plinth has to do. A swim spa in this footprint suits a villa terrace, a poolside corner, a rooftop deck or a resort guest-area alcove where a full swimming pool would waste space. Confirm the internal water depth against how the space will be used — lap-style training with an opposing current, seated hydrotherapy, or family splashing all want different water depths and seating positions.
Ask us to send the outline drawing with the shell dimensions plus clear-service zones around it. Access panels need to stay reachable after the cladding goes on; a jet or filter pump buried behind fixed tiling is a maintenance problem you will pay for twice.
Specification items to confirm line by line
| Item on the catalogue sheet | Catalogue figure for WS-PC01A | What to confirm before order |
|---|---|---|
| Total jet count | 28 pcs | Jet layout and mix (seat jets, back jets, directional jets), because the seat positions decide where the hydrotherapy zone actually works. |
| Water pumps | 2 pcs | Pump make, flow rating and which jet group each pump feeds. |
| Filter pump | 1 pc | Filter type and micron rating, plus how the filter housing is reached for cleaning. |
| Control system | 1 set | Touch-panel location, whether a second control point is wanted, and language/keypad options. |
| Total power | 3.25 kW | Whether the figure covers only this standard configuration; heating, heat pump or UV options change the load. |
| LED lighting | 1 pc plus 9 small LED lights | Fitting positions, colour/white choice and controller grouping with the spa lighting circuit. |
| Sanitation | Ozone shown as a listed feature | Whether UV sterilisation is added on top of ozone, and where the unit is mounted in the plant space. |
The catalogue also lists control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps as options. Availability and compatibility vary by model, so we confirm each option against the configuration you select rather than assuming it fits.
Finish details that get missed in a purchase order
- Shell and cabinet finish. Acrylic shell colour, exterior cladding colour and whether the cladding is supplied with the spa or made on site to match the deck.
- Seating and lounger layout. Number of seats, dry lounger versus in-water seat, headrests and pillow positions relative to the jet groupings.
- Steps. Integrated steps versus loose steps, left/right orientation, and step height against your finished deck level.
- Insulation package. Shell insulation, lid type and whether a thermal cover is included — these decide running cost more than any jet option does.
- Filtration route. Standard cartridge arrangement versus sand filtration, and where the filter sits relative to the access panel.
- Water treatment. Ozone as standard feature plus optional UV; confirm dosing or maintenance access for whichever you choose.
- Drainage and overflow. Drain point, overflow arrangement and any priming pump needed once the spa is below deck level.
For projects where the swim spa has to match a wider outdoor scheme — pergola, loungers, poolside dining — we coordinate it in the same package as the modern aluminium outdoor sofa set and other poolside furniture, so finishes are specified together instead of being reconciled on site.
When a different configuration makes more sense
WS-PC01A is one entry in our configurable swim and hydrotherapy range. Two neighbouring references help frame the choice:
- Outdoor Swim Spa WS-PC01 shares the 3000 mm length but a deeper 1050 mm shell, with a different jet total and power figure — worth comparing when seated hydrotherapy matters more than footprint.
- Customizable Shape Outdoor Spa, Personalized Hydrotherapy Pool covers buyers who need square, round, oval or curved geometry to fit an awkward terrace or a designed landscape feature rather than a standard rectangular shell.
If the brief includes a long swimming channel plus a separate relaxation area, an extended model is the better starting point. Send us the plan drawing and we will tell you honestly when the compact unit is the wrong choice.
Delivery, site preparation and handover
Our scope covers production, packing, container loading, export paperwork and door-to-door freight by sea, air or rail. On the receiving side you still need a crane or forklift route from the truck to the foundation, an approved electrical supply installed by a local licensed electrician, and a level structural base built to the load figures we provide. Local permits, water connection and code compliance are handled by your team, because requirements differ by country and municipality.
Before shipping we run a factory fill test on the assembled unit: jets, pumps, filtration, controls and lighting checked with water in the shell, plus a packing list matched item by item to the confirmed configuration. Photographs of the tested unit and the equipment schedule go out with the shipping notice, so your site team can verify the delivery against the same document.
Questions buyers ask us most often about this model
Is the 3000 × 930 mm figure the shell or the finished footprint?
It is the catalogue dimension for the spa. The finished footprint grows once steps, cladding and access panels are added, so request the outline drawing before you set out the deck.
Can the jet count be changed on WS-PC01A?
Jet layouts are configured with the buyer against the seat positions, and pump grouping is adjusted to suit. The catalogue figure of 28 pcs reflects the listed configuration; your confirmed schedule becomes the production reference.
Do you supply the heat pump and insulation with the spa?
Heat pumps, insulation packages and covers are listed options. We specify them with the selected configuration and include them in the same equipment schedule so the electrical design is done once.
Send us the terrace plan, intended use and target finish for your project, and we will return a configured specification for Outdoor Swim Spa WS-PC01A with an itemised equipment schedule, electrical load list and freight quotation. As a China-based manufacturer of furniture and building materials serving villa, hospitality and resort projects, SANTERSON coordinates the swim spa together with the surrounding outdoor furniture and finishes, so one specification covers the whole poolside package.