A decorative wall panel can change the look of a villa living room, a hotel lobby or an apartment bedroom within one trade package. The difficulty is that two panels with the same catalogue photo can behave very differently on site once size, substrate and finish change. Before you place an order, put these customisation points in writing.

1. Panel Format: Size, Thickness and Module Layout

Standard catalogue sizes rarely fit a real wall exactly. Off-cuts, joints on visible sightlines and uneven reveals usually start with a drawing that was never checked against the panel module. Confirm the working size of each panel, its thickness, and how the joint pattern will read across the full wall — not just on a sample tile.

  • Overall wall dimensions taken on site after finishes (plaster, screed, insulation) are accounted for.
  • Panel module and joint direction agreed with the drawing, including where the last cut piece lands.
  • Thickness confirmed against door reveals, skirting, switch plates and any built-in joinery it meets.
  • Made-to-measure sizes for niches, arches, TV recesses and headboard walls rather than field cutting.

SANTERSON produces these panels to custom specification, so send the marked-up elevation instead of asking for a "standard" sheet. Our Decorative Wall Panel for Interior Home Decoration is offered in various colours and textures for custom selection, and the same approach applies to the rest of the range.

2. Surface Finish and Texture: What the Sample Must Prove

Photographs flatter a surface. A matte texture that looks like stone on screen can read flat under warm 2700K lobby lighting, and a high-sheen finish that looks premium in a showroom will show every fingerprint in a corridor with heavy traffic.

  • Ask for the physical sample of the exact finish, not just the colour family.
  • View it under the same light temperature and angle used in the room.
  • Check sheen level, grain direction and whether the pattern repeats or runs randomly across panels.
  • For wood, stone and fabric effects, confirm which effect you are buying — surface film and embossing differ between product lines.

The Modern Decorative Wall Panel for Interior Decoration simulates stone, wood, fabric and other effects, with diverse surface finishes and custom patterns. If your design intent is a specific look, name it in the enquiry and request the matching sample.

3. Substrate and Room Conditions

Interior panels are not interchangeable across rooms. A feature wall in a dry living room has different requirements from a lift lobby, a spa corridor or a coastal villa where humidity moves through the wall.

ConditionWhat to specify
Humid indoor areasMoisture-resistant panel body and approved adhesive method; confirm the wall is correctly waterproofed behind the cladding.
Curved walls, arches, columnsA flexible sheet instead of a rigid board. Our Flexible Wood Grain Cement Wall Panel is a bendable mineral sheet that wraps curved walls and arches, is non-combustible, and arrives with a raw white surface you can paint to project colour.
Feature walls with depthOur Luxury Decorative 3D Wall Panel gives a three-dimensional relief for TV backgrounds and lobby feature walls, with custom size, colour and pattern.
Facade and external exposureInterior decorative panels are not facade material. For exterior cladding, discuss the Aluminum Honeycomb Panel for Building Exterior & Interior Wall Cladding instead.
Acoustic-sensitive roomsDecorative relief is not sound treatment. For reverberation control, specify Santerson Acoustic Panels with made-to-measure sizing and finish options.

4. Installation Method and Site Sequence

Panels are lightweight and can be cut and assembled on site, which is why they are popular for renovation. That flexibility only pays off when the fixing method and the trade sequence are agreed before delivery.

  • Fixing method — adhesive, mechanical clip or batten frame — decided by substrate, panel weight and site conditions.
  • Substrate preparation: flatness, dryness and priming requirements stated in writing.
  • Cutting allowance and edge treatment for corners, outlets and ceiling junctions.
  • Sequencing with electrical, lighting coves and joinery so the panel goes on after concealed works are signed off.
  • Cleaning and protection regime during the rest of the fit-out.

For projects that need support beyond supply, our Custom & OEM Service covers bespoke finishes, textures and prototyping, and we also coordinate logistics and on-site installation support as part of a turnkey package.

5. Ordering, Sampling and Delivery Details

The commercial terms matter as much as the specification. Lock these down before production starts:

  • Sample approval in writing, with the approved sample retained as the reference for delivery inspection.
  • Batch and lot quantity: order the full wall plus spares in one production batch to keep colour consistent.
  • Packing method and pallet layout matched to site access and storage.
  • Freight mode, Incoterms and delivery address for each project stage.
  • Spare panels held for future maintenance or snag replacement.

We arrange sea, air and rail freight with customs paperwork and door-to-door delivery, so the same team that produces the panels can move them to your site.

Enquiry Checklist: Send These With Your Request

  • Room type, project location and quantity of panels or square metres.
  • Marked-up elevations with finished wall dimensions.
  • Preferred texture and colour reference, plus the light condition on site.
  • Substrate description and whether the area is dry, humid or curved.
  • Required fixing method and installation responsibility.
  • Delivery terms and destination for each project.

Product descriptions above reflect the specifications published on our product pages. Confirm technical data, fire performance and any local code requirements for your project before ordering.

Send us your wall elevations and finish references. Our team will match the panel format, texture and fixing method to your project and quote a complete package — panels, spares and delivery.

Talk to our team about wall panels and wall cladding for your villa, hotel or apartment project.