An outdoor swim spa is not a product you can order from a photograph. The model name, the dimensions in the brochure and the price on the sheet all look settled long before the site slab has been poured or the electrical supply has been sized. Outdoor Swim Spa WS-130CⅣ sits at the long end of our configurable swim and hydrotherapy range, and it is exactly the kind of unit where a question asked too late turns into a change order. The list below follows the order a procurement officer or project owner actually meets these decisions in: footprint first, then equipment, then power and services, then what arrives on the truck.

1. Does the footprint match the way you intend to use it?

The product page for WS-130CⅣ lists 11830 × 3000 × 1430 mm. The range also carries a variant named WS-130CⅣ-U under its own product page with the same overall dimensions, and neither listing spells out what changes between them. Ask us which variant you are being quoted and what the difference means for the shell, seating layout and water volume on your site.

Then measure the use case, not just the pool. A long channel with a swim training system is for lap swimming against a current; a hydrotherapy area with jets is for sitting still. If both matter to the household or to the guest rooms of a villa or hospitality project, ask how the two zones are divided in this configuration and where the seats, steps and access points sit. Ask for the plan drawing with clear-water dimensions rather than outer cabinet dimensions, because the difference is what your slab, deck edge and drainage have to work around.

Height is the dimension buyers most often forget. At 1430 mm the shell rises well above a standard deck level, so decide early whether the unit sits on a raised platform, is partly recessed, or is approached with steps — and who supplies those steps.

2. Which equipment is actually included in this configuration?

The features shown for WS-130CⅣ are water jets, LED lighting, ozone and a swim training system. The product page for this model records the following figures:

ModelWS-130CⅣ
Dimensions as listed11830 × 3000 × 1430 mm
Control system1 set
Swim training system1 set
Water pump1 pc
Filter pump1 pc
Jet total20 pcs
LED lights7 pcs
Total power (as listed)10.85 kW

Ask for that table to be reissued as a signed equipment schedule, item by item, with the exact quantity for your order. A jet count of 20 is meaningless without knowing which jets are in the swim zone and which are in the seating area, and whether any are adjustable. The same applies to the seven LED fittings: confirm where they are mounted and how they are reached for replacement.

Options listed for the range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so every option you want should be quoted as a named line with its own price — not folded into a single lump figure.

One point worth being blunt about: the total power shown on the product page belongs to one particular configuration. Add a heat pump or change the filtration route and the electrical load changes with it. Never let your electrician size anything from the brochure.

3. What does the site need before the unit arrives?

This is where most swim spa projects lose weeks. Ask us, in writing, for:

  • the load-bearing expectation for the base or slab, and whether the platform is cast on site or supplied;
  • the electrical requirement for your chosen equipment list — supply capacity, circuit protection and where the isolator should sit;
  • drainage, overflow and access to the filter pump and control system for routine servicing;
  • for a heated unit used through cooler months, whether additional insulation is specified and how it is fitted.

If your project has an architect or landscape contractor, put them in the same email thread as the spa supplier. A single coordinated drawing set avoids the situation where the deck is finished and the plant access panel is unreachable.

4. How does it reach your site, and what happens on delivery day?

A shell of this length is a freight problem before it is an installation problem. Ask which transport route is proposed — our logistics and door-to-door delivery service covers sea, air and rail forwarding with customs paperwork, packaging and container loading plans — and then ask the harder local questions: what vehicle can reach your address, is a crane or HIAB needed to set the shell, and who books that lift. Confirm the delivery address, access restrictions and receiving hours before the unit leaves the factory.

Ask how the shell is protected for transit and what you should inspect and photograph while the crate is still open. Damage claims get easier in the first hour after the truck leaves.

5. Who commissions it, and who supports it afterwards?

Clarify the handover boundary before you sign: does the supplier handle installation and after-sales support, or do they supply to a local plumber and electrician while staying available remotely? Ask what commissioning includes — filling, leak check, jet and swim-system operation, control settings, water chemistry start-up — and ask for an as-built pack: wiring diagram, pump and control documentation, spare-parts list and consumable sizes.

Then ask what is covered, for how long, and what voids it. Jet seals, shell, pumps and the swim system can each carry different terms, so get those terms stated on the proforma rather than left in a brochure.

6. What should you compare against WS-130CⅣ?

If a format of this length turns out to be more than your plot can take, look at the shorter models in the same range and ask for their equipment schedules on the same template, so you are comparing like with like. The Swimming Pools and Swim Spas category covers configurations from compact square spas to long swim channels, including customizable-shape outdoor spas where the shell geometry follows the terrace rather than the other way round.

For project buyers ordering a swim spa as part of a wider package, ask whether the spa can be coordinated with the rest of the fit-out under one supplier. Ordering outdoor water features together with other furniture and building materials means one set of drawings, one shipment plan and one point of contact for snags at handover.

Before you sign: the short version

  • Confirm which variant you are being quoted — WS-130CⅣ or the separately listed WS-130CⅣ-U — and get the difference in writing.
  • Get clear-water dimensions, not just outer cabinet dimensions.
  • Get a signed equipment schedule with quantities for your configuration.
  • Get the electrical and structural requirement for that configuration, not the figure printed on the product page.
  • Agree freight route, offloading method and who books the crane.
  • Agree commissioning scope, warranty terms by component, and the spare-parts list.

Send us your site photos, a plan of the terrace or deck, and a note on how the spa will be used — daily laps, guest use at a villa, or year-round hydrotherapy — and we will quote WS-130CⅣ against that brief instead of against the product page.