A swim spa of this size is not an impulse purchase. Before you sign an order for the Outdoor Swim Spa WS-130CⅢ, you need a written checklist that covers the shell, the water system, the electrical supply, the base, and what arrives in the container. The list below follows the order we work through on real projects, so every item can be closed out before production starts.
1. Site access and the footprint you actually have
The catalog lists this model at 11830 × 3000 × 1430 mm. Treat those numbers as the starting point for a site check, not as an assumption: confirm them against the drawing that will be issued with your order. Then measure three things on site — the clear length and width of the position, the height clearance under any overhead structure, and the route from the delivery vehicle to that position.
Write down gate widths, turning radii, overhead wires, and whether a crane or a long-reach forklift is needed. A shell this long rarely passes through a standard side gate, so access is often the item that decides whether the spa sits on a deck, a patio slab, or a prepared ground pad.
2. The foundation and drainage decision
Decide early who prepares the base: you, your local builder, or us as part of the package. A full-perimeter reinforced concrete slab, level in both directions, is the usual answer for a unit of this mass, but the exact thickness and reinforcement are structural questions for the engineer on your project — we work to their drawing rather than issuing one.
Agree drainage before the slab is poured: an overflow connection, a drain-down point, and space around the cabinet for the equipment access side. Once concrete is down, moving a drain costs far more than specifying it on paper.
3. Electrical supply and protection
The catalog shows total power of 10.85 kW for this configuration. That figure drives the supply size, cable run, and protective device, so confirm it in writing together with the required supply voltage and phase for your country before any electrician quotes. Ask us to state the connection details on the production drawing, and have your local electrician handle the final connection under their own licence and local rules — we do not certify installations in a market we are not registered in.
Also settle where the control system sits. It needs to be reachable for routine operation yet outside splash reach, and its position should be fixed on the drawing rather than decided on site.
4. What is included in the quoted configuration
Read the specification line by line and match it to your intended use. For this model, the catalog shows one control system, one swim training system, one water pump, one filter pump, a jet total of 20 pcs, and seven LED lights. If a figure matters to your decision — jet count for hydrotherapy, lighting for an evening entertaining zone — ask for it in the quotation text, not in a brochure.
Then compare the variants on their merits rather than their names. The Outdoor Swim Spa WS-130CⅢ-U shares the same catalog footprint but is listed with a different pump and jet arrangement, so it suits buyers whose priority is massage seating rather than swim training. The wider Swimming Pools and Swim Spas range covers shorter shells too, which matters when access or plot length rules out a nearly twelve-metre unit.
5. Options that change the running experience
Catalog-listed options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Two of them usually decide year-round usability: a heat pump and insulation. If the spa will be used outside the warm months, ask what heater capacity is proposed for your climate and what insulation is specified for the shell and cabinet — both change running cost more than any cosmetic choice.
Ozone is shown as a feature on this model. Ask how water sanitisation is handled in the configuration you are quoted, and what consumables you will need to buy locally each year.
6. Surrounding furniture and the outdoor room
A swim spa is used with deck furniture, shade, and storage for towels and chemicals. Because we manufacture furniture and building materials under one roof, these can be specified in the same order instead of chasing three suppliers. Poolside seating such as the Aluminum Sling Sun Lounger Collection pairs with a spa terrace, and pergolas, daybeds and outdoor dining sets from the same range keep frames, finishes and delivery dates consistent.
7. Delivery, packaging and unloading
Ask which Incoterms apply, what container type is proposed, how the shell is crated, and who organises unloading at your address. Confirm the paperwork package — commercial invoice, packing list, certificate of origin — and who handles customs clearance in your country. Import rules differ by market, so get the duties and clearance responsibilities confirmed for your specific delivery address rather than relying on general statements.
8. Installation sequence and after-sales terms
Get a written sequence: base ready date, electrical rough-in, unit set, plant connection, commissioning fill, handover. Ask what inspection is carried out before shipment, what the warranty covers and excludes, and how spare parts such as pumps, jets and light fittings are supplied later. Consumables and wear items are where buyer expectations most often go wrong, so put them in writing.
9. Documentation to receive before payment
- Production drawing with confirmed dimensions, access side and control position
- Configuration sheet listing pumps, jets, lights, swim training system and options
- Electrical requirement statement: voltage, phase, total power, protection
- Base loading note for your engineer to check against their slab design
- Packing list, container plan, and the shipping terms you agreed
How we fit into this process
We have manufactured furniture and building materials in China since 2008, and a swim spa order normally travels with other items from the same project list. That is where a single supplier helps: one configuration sheet, one production schedule, one shipment. Our Custom & OEM Service covers bespoke finishes and dimensions where a standard model does not fit the plot, Logistics & Door-to-Door Delivery handles freight and documentation, and Installation & After-sales Support covers site guidance, snag inspection and spare parts. Send us your site measurements, your country's supply details, and the way you intend to use the water — exercise, therapy, or family leisure — and we will return a configuration sheet with those numbers filled in before you commit.
Send your dimensions and delivery city, and we will confirm the specification line by line.