Open-plan guest suites and villa kitchens are no longer closed rooms behind a door. In the hotel and villa projects we supply, the kitchen runs into the lounge, the pantry becomes part of the living wall, and the cabinetry has to look like furniture rather than equipment. That is exactly the brief behind our open concept kitchen cabinets: modern open style interior fixtures made for shared, visible spaces. Below we set out where these cabinets actually work in a hotel or villa project, which configurations suit which space, and what a buyer needs to fix before production starts.
What changes when the kitchen is on show
A closed kitchen is judged on storage and workflow. An open kitchen is judged on those things plus appearance, from across the room. Three design consequences follow, and they drive every specification decision we make with project buyers:
- The cabinet exterior becomes wall finish. Door panels, shelf edges and tall-unit fronts sit in the same sightline as joinery, panelling and stone. Colour and grain have to be specified together, not separately by different suppliers.
- Storage has to hide clutter. Everyday items are visible from the sofa or the bed, so open bays need to be planned for display while small appliances and dry goods stay behind doors.
- Housekeeping and maintenance take over the specification. In a hotel suite the same run is cleaned daily by staff and used occasionally by guests. Surface, edge and hardware choices decide whether it still looks right in year three.
Our open concept cabinets are built on that logic: clean lines, customised layouts and panel surfaces specified as wear-resistant, waterproof and easy to clean, so they hold up to long-term commercial and household use. Layout, size, door style, colour and surface finish are all made to the drawing rather than to a fixed module.
Where they work in hotel projects
Serviced apartments and extended-stay suites
This is the strongest fit. Extended-stay and serviced-apartment units need a real kitchen, but the floor area is limited and the kitchen is in the same room as the living space. A run of open plan kitchen cabinetry lets one wall carry the worktop, appliances and dry storage while open bays and a tall unit continue the design language into the lounge. Because the units are custom-built to site dimensions, repeat floor plates can be produced in volume with the same detail, and variations handled per room type.
Hotel suites with kitchenette or wet bar
Full kitchen cabinets are not always needed upstairs, but a kitchenette usually is: a sink, a small refrigerator housing, a coffee station and glassware storage. Open style fixtures work well here because a shallow open bay reads as hospitality styling rather than as domestic cabinetry. Our custom built-in kitchen cabinets line covers this type of fixture, including matching hardware such as hinges, drawer slide rails, support legs and connecting brackets, so the joinery arrives ready for installation.
Back-of-house: F&B prep, room-service staging, minibar stocking
The same cabinet construction is useful where looks matter less than hygiene and durability. Neutral panel colours, waterproof surfaces and cleanable edges suit room-service staging areas and minibar replenishment rooms. Open shelving speeds up stocking; closed cabinets keep spare linen and consumables out of sight. We specify these areas separately from guest-facing joinery so the project does not pay furniture-grade finishes for a utility wall.
Where they work in villa projects
The main open-plan living, dining and cooking space
In villas the kitchen usually forms one volume with dining and lounge. Here the cabinet run is designed as a backdrop: handleless or minimal-profile fronts, tall units taken to ceiling height, and open bays positioned where display items will actually sit. Where the design calls for a lighter touch, open shelving minimalist cabinets carry the same material palette and let the wall breathe around the cooking zone.
Secondary kitchen, scullery and pantry
Villa owners who cook seriously still want a hidden working kitchen. The practical combination is a show kitchen in open style fixtures plus a scullery or walk-in pantry behind doors. We draw both from the same material and finish schedule, so the pantry door opens onto a space that matches the main kitchen without repeating its cost.
Villa amenities: bar, spa and guest annexe
Poolside bars, wellness rooms and guest annexes all need compact cabinetry that survives moisture and frequent cleaning. Open style fixtures with waterproof panels suit a wet bar or a spa preparation counter, while the same board material can be carried through to bathroom joinery so the amenity areas read as one scheme.
How to mix open and closed storage without it looking messy
Buyers often ask what proportion of a run should be left open. Our answer depends on who cleans it. As a working rule we apply on project drawings:
- Hotel and serviced-apartment suites: open bays limited to display positions and the coffee or glassware station; everything else behind doors. Fewer open surfaces means fewer daily wipe-downs and less damage risk from guest use.
- Private villas: a wider share of open shelving is workable, concentrated where the owner wants to see items, with small appliances kept in closed cabinets or appliance garages.
- Both: at least one tall closed unit per run for dry goods and equipment, so open styling does not become storage failure.
Integrated lighting is what makes the open bays look intentional rather than empty. Where a project wants shelf or cabinet lighting, it is specified with the cabinetry and confirmed for the electrical requirements of that market, rather than added on site afterwards.
Specifying to match the rest of the interior
Because these fixtures sit inside the living space, we coordinate them with the other surfaces in the same package. Panels and veneers from our wood veneer panels range can be carried from wall panelling into tall cabinet fronts, so a kitchen run and the media or storage wall next to it share one grain. Stone and marble surfaces are specified at the same time as worktops, and where a project needs display shelving beyond the kitchen, open display niches in an integrated storage wall continue the same module.
For buyers ordering several fixtures at once, this is where one supplier saves coordination effort: cabinetry, wall panelling, stone surfaces and bathroom joinery are all in the Interior Fixtures range, so they come from one production schedule with one set of dimensions and finish references.
What the buyer should confirm before production
Configurable open style cabinets are made to order, so the following must be closed out on drawings before we cut board. Missing any of these causes variation orders on site:
- Dimensioned elevations for each room type, with clearances for appliances and services.
- Panel material, colour and finish, confirmed against physical samples rather than screen images.
- Open-bay contents, decided at drawing stage: what will be displayed, and where it comes from.
- Hardware set, including hinges, slides and any integrated lighting, with electrical ratings confirmed for the project's market.
- Installation sequence, agreed against flooring, wall finishes and ceiling works.
Our project workflow runs from consultation and design through production, logistics, installation and after-sales support. Custom/OEM service is available where a designer needs bespoke finishes or detailing. Freight can be arranged door to door, which keeps cabinetry, panels and complementary fixtures on one delivery rather than several.
Before you send the enquiry
If you have a hotel, serviced-apartment or villa package in mind, send us the room layout and any finish references. We will come back with a cabinet proposal for each space, showing which runs use open style fixtures, which stay closed, and how the two tie into the panelling, stone and joinery around them. Dimensions, panel materials and hardware are confirmed per configuration on your drawings.
Contact SANTERSON to start a quotation on your drawings.