A stone or marble quotation rarely arrives as one number. It arrives as a set of interlocking decisions — which material, which thickness, which edge, which substrate, who fixes it, and how the pieces are packed and shipped. Before you sign a purchase order for a hotel lobby, a restaurant feature wall or a block of guest-room vanities, here is what to check line by line in a Santerson stone and marble proposal, and what to ask us to put in writing.
Start with the scope, not the slab
The first thing we need from your team is the same information every project starts with: where the material goes, how many square metres or linear metres of each finish, and whether the surfaces are flat, curved or interrupted by reveals and services. A commercial interior almost never needs one product; it needs several families that must look coherent next to each other. Our Santerson Stone & Marble Surfaces range sits in the countertops and basins collection, while matching wall finishes are handled through Santerson Stone & Marble Panels in the paneling systems collection. Both are specified per project — finish, layout and dimensions are chosen for the space rather than picked from a fixed size list.
That made-to-measure approach is where most evaluation errors begin. A proposal that quotes "stone panels" without stating per-panel dimensions, total area per finish, and which drawings those dimensions come from is not comparable with a competitor's quotation. Ask for a schedule: one row per finish, with the drawing reference, quantity, thickness, edge treatment and fixing method. Once every supplier prices from the same schedule, price differences start to mean something.
Read the specification lines carefully
For each line in the proposal, confirm four details before you compare cost per square metre:
- Material and finish. The exact material name, surface finish (honed, polished, textured) and colour reference should be written out, not left as "as per image". Photographs on a product page are indicative; the finish you approve is the one recorded in the order.
- Dimensions and thickness. Panel sizes, thickness and total quantity for each area. Note which dimensions are fixed by the manufacturer's standard format and which are cut to your drawings.
- Edge and joint detail. Mitred corners, square edges, bullnose on a vanity top, expansion joints on a long run — these change both price and site time.
- Substrate and fixing. What the panels are fixed to, which adhesive or mechanical fixings are supplied, and who is responsible for the preparatory work. This is the single most common gap between a factory quotation and a finished wall.
Where a product page lists dimensions or configuration options, treat those as the starting point of a conversation rather than a certified datasheet. We ask every commercial buyer to confirm dimensions and selected specifications against their own drawings before production begins; we would rather change a drawing now than re-make a panel later.
Curved and feature surfaces: check the material family
Not every project should be quoted in solid stone. On curved reception desks, column wraps, arched niches and long feature walls where weight and build-up are constraints, our MCM Flexible Travertine Stone Veneer is an ultra-thin, bendable soft stone that replicates natural travertine texture and wraps curved and special-shaped surfaces. It is cut on site without heavy equipment, which shortens installation on renovation jobs where the existing structure cannot take a wet trade or a heavy substrate.
The honest trade-off: flexible stone veneer is a cladding product with a stone face, not a structural stone element. It is a good answer to a decorative wall in a hotel, restaurant, villa, mall or office; it is not the right answer for a worksurface that takes direct impact, standing water or heavy point loads. A useful proposal tells you which of the two you are being quoted and why. If a quotation quietly swaps a solid surface for a veneer — or the reverse — on a curved detail, ask for the reasoning in writing.
Ask how samples and approvals work
Stone is approved by eye and by touch, not by a PDF. Before commercial production we confirm the finish and configuration you have chosen, and for our flexible stone range samples are available so your design team can check colour and texture against the rest of the palette. Build one approval step into your own programme: one named person on your side signs off the sample, the drawing and the finish reference together, and that sign-off becomes the reference point for everything delivered afterwards.
For multi-finish projects, request that all finishes be sampled in a single package. Comparing a marble-look panel against a travertine veneer side by side on one lightbox reveals clashes that never show up in separate email threads.
Check the logistics and installation lines
Stone fails on site more often in transit than in the factory, so treat the delivery terms as part of the specification. Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and delivery to site. What we ask buyers to verify for their own import is the commercial detail: Incoterms, duties, insurance cover and the delivery address on the packing list. A landed cost that looks competitive often hides a quotation priced ex-works with no insurance.
Then look at who installs. Our services include site installation, inspection and snagging, spare parts and ongoing maintenance under installation and after-sales support. Whichever route you choose, the proposal should state clearly whether installation is included, whether a fixing detail drawing is provided for your contractor, and how breakages and shortages are handled — because replacement panels made to a different batch can differ in veining from what was already fixed.
Compare like for like
When two proposals sit side by side, the cheapest total is rarely the lowest risk. Score them on five questions: does each line state material, finish, thickness and dimensions from your drawings; is the substrate and fixing method defined; has a physical sample been approved and referenced; are packaging, insurance and delivery terms written down; and is responsibility for installation and replacement panels assigned to a named party. A proposal that answers all five can be priced confidently. One that does not will cost more later, whatever the headline figure says.
If you are evaluating a fit-out that combines stone surfaces with cabinetry, ceramics, lighting and other finishes, our turnkey project solutions coordinate furniture and building materials as one package, so the stone schedule is checked against the rest of the specification instead of being reconciled on site.
Send us the drawings
To get a comparable, fully specified quotation, send the room layouts and elevations for the areas in question, the finishes you want for each surface, your target delivery location and your programme dates. We will come back with a scheduled proposal — material, finish, dimensions, thickness, edge detail and fixing method per line — and confirm every specification with you before production starts.
Talk to us about stone and marble surfaces for your project: contact SANTERSON.