A built-in wall that runs from the floor slab to the ceiling looks simple on a drawing and causes expensive rework when it is not specified properly. If your project brief calls for Santerson Floor to Ceiling Modular Systems, the level of detail you hand over in the first round decides whether production starts on a confirmed layout or on assumptions. This guide sets out what a procurement brief should contain, using the configuration options Santerson actually lists for these systems.

Start with the exact product family, not just "built-in joinery"

Santerson publishes floor-to-ceiling modular built-ins across more than one collection, and they are not interchangeable in a bill of quantities. The Floor to Ceiling Modular Systems listing sits under Modular Living Systems and covers full-height living walls for residential projects. The separate Floor to Ceiling Systems listing sits under Modular Shelving Systems and is written around residential wall systems that are shelving-led. Santerson Floor to Ceiling Bookshelves is catalogued separately again, in the Bookshelves range.

Name the collection and the exact page title in your brief. Two projects that both say "floor to ceiling unit" can end up being quoted against different product families, with different carcass depths, door options and hardware schedules behind them.

What the product pages actually offer

For these modular listings Santerson states three configuration points on the product page itself. Everything in your brief should map onto them:

  • Made-to-measure sizing — dimensions are set per project rather than chosen from fixed widths.
  • Material and finish options — carcass, door and surface finishes are selected per project.
  • Layout tailored to the project — the internal composition and open/closed split follow the space and how it will be used.

That is deliberately a configurable system, not a catalogue item with a fixed spec sheet. Your brief supplies the variables; Santerson's design and production coordination turns them into shop drawings for sign-off.

The six items to lock down in the brief

1. Room, wall and reference dimensions

Give a dimensioned sketch or marked-up plan for each wall: overall width, floor-to-ceiling height, depth, and the position of skirting, cornices, architraves and any recessed niches. Note floor finishes and ceiling build-ups, because a change in either alters the scribe and plinth detail on a full-height unit.

2. Layout zoning: open, closed and mixed

State how much of the wall is display and how much is concealed storage. If you want to see what already exists in the range, reference it explicitly: Open Modular Units and Santerson Closed Modular Units are both listed under Modular Living Systems, and Santerson Mixed Open & Closed Systems covers the combination. Naming a starting point gives the design team something to react to instead of an empty page.

3. Shelf spacing and load use

Say what goes on the shelves — books, glassware, AV equipment, artwork — and give the tallest single item you need to accommodate. Fixed versus adjustable shelving follows from that answer, and it is far cheaper to change on a drawing than on site.

4. Materials, finishes and edges

List preferred substrates, door profiles and surface finishes, and identify which elements are visible from the room versus enclosed. Santerson's Custom & OEM service covers bespoke finishes and textures alongside material selection, so a finish reference — a sample, a code, or a photograph of an existing installation — is worth more than a colour name.

5. Integrated lighting and services

If the wall carries lighting, specify it in the same brief rather than as a later variation. Santerson Modular System with Lighting is listed within Modular Living Systems, and the shelving side of the catalogue includes Santerson Integrated Lighting Systems. For each lighted bay, state fitting type, switching position, driver location and access. Electrical details for the chosen configuration need confirming before production.

6. Fixing conditions and site interface

Full-height units interact with structure. Record wall construction and what it can carry, floor level variations across the run, expansion joints, skirting removal, and where adjacent trades — plasterboard, paint, flooring, electrical — hand over to the joinery installation.

Brief sectionWhat to stateWhy it matters at production
Product referenceExact collection and page titlePrevents quoting against the wrong product family
DimensionsWidth, height, depth per wall; finish levelsSets scribe, plinth and ceiling interface details
LayoutOpen/closed split, bay widths, door typeDrives carcass count, hardware schedule and cost
ContentsTallest item, load type, shelf adjustabilityDetermines span, shelf thickness and spacing
FinishesSubstrate, profile, surface, sample referenceAvoids colour-matching disputes at handover
ServicesLighting, cabling, driver accessRequires cut-outs and ventilation from the outset
Site conditionsWall build-up, levels, adjacent tradesAffects fixing method and installation sequence

How the specification moves through production

Santerson's stated cooperation steps run from project brief and design proposal to quotation and detail confirmation, then production, shipment and follow-up. The One-stop Solution service adds material selection and product specification, manufacturing with quality control, project management and site coordination, and final installation and handover.

For a modular wall, the practical implication is that your brief becomes drawings, and those drawings are the document you sign. Review them line by line: bay widths, door swing direction, shelf heights, finish codes and lighting positions all appear there. A correction at drawing stage is an edit; the same correction after cutting is new material.

Specify related built-ins in one package. Modular walls rarely stand alone. Wardrobes, tall cabinets, media walls and Santerson Modular Bookshelf Systems are usually detailed together so carcasses, trims and finishes match across the project. Grouping them in one enquiry keeps the finish schedule consistent and consolidates production and shipping.

A pre-submission checklist

  • Collection name and exact product title quoted for each wall.
  • Dimensioned drawing per wall, with floor and ceiling finish levels marked.
  • Open/closed split and door type confirmed for every bay.
  • Tallest stored item and shelf adjustability stated.
  • Finish references attached as samples or codes, not colour names alone.
  • Lighting schedule with switching and driver access positions.
  • Wall construction, levels and interface responsibilities recorded.
  • Delivery address, access constraints and installation window included.

Dimensions, storage layout, finishes and electrical arrangements for a chosen configuration should be confirmed with Santerson before production. The product listings describe configurable systems rather than fixed specifications, so the signed drawings — not the catalogue page — are what govern the delivered unit.

Send the brief with drawings attached and ask for a proposal against the named collection. For project enquiries, contact details are on the Santerson contact page.