Open concept kitchens remove the wall between cooking and living space, so the cabinetry has to work twice: it must perform as a kitchen fixture and read as part of the room behind it. That double job is exactly where project specifications go wrong. A drawing that shows the layout but not the panel, finish or hardware leaves the factory guessing, and every guess becomes a variation order later. Below is the specification sequence we use when supplying open concept kitchen cabinets for apartments, hotel suites and villa renovations, written so a buyer, designer or contractor can hand it straight to a supplier and get comparable quotations back.
1. Fix the layout before you fix the door style
Start with the plan drawing, not a mood board. In an open-plan room the cabinet run is usually visible from the lounge or dining area, so the elevations need to show three things at once: overall run length and module widths, the height relationship between wall units, worktop and base units, and where the tall elements sit. Mark appliance positions with model references rather than generic blocks, because a built-in oven, a wine cooler and a drawer stack each demand different carcass depths and ventilation gaps.
Then decide how much of the run stays open. Open shelving, display niches and an island without doors soften a long cabinet wall, but they also expose the internal edges and the shelf supports. Specify which sections are open and which are closed at this stage; it changes panel quantities, edge banding and whether the carcass interior needs the same finish as the exterior.
2. State the materials by layer, not by adjective
Words such as "modern" or "minimalist" cannot be manufactured. Split the specification into four layers and describe each one separately:
- Carcass and back panels — board type, thickness and which faces are finished. Open sections show the inside, so a finished interior is a line item, not an assumption.
- Door panels — construction (flat panel, shaker, handleless), core material and edge treatment. Flat and handleless doors look simple but depend on precise edge alignment across a long run.
- Surface finish — matte or high gloss lacquer, acrylic, melamine, PVC or wood veneer, plus the colour reference. Same door shape, different film, completely different price and light reflection.
- Worktop and splashback — material, thickness, edge profile and the joint detail where it meets the wall.
For surfaces that face a shared living area, wear resistance, water resistance and cleanability matter as much as colour, because an open kitchen counter is used as a serving and working surface. Our cabinets are built on quality board materials with finishes specified for long-term indoor use in both residential and commercial settings; the exact finish you choose should follow the traffic the project expects.
3. Specify the hardware, because it decides how the kitchen feels
Hardware is the most commonly omitted section of a cabinet enquiry. List the hinges and whether soft closing is required, the drawer slide type and load rating, support legs and plinth detail, connecting brackets, handles or the integrated profile used for handleless fronts, and any internal fittings such as corner mechanisms, pull-out trays or waste bins. Where an island or open section has no doors, state how the shelves are supported and whether adjustable shelf pins are acceptable.
We supply matching cabinet hardware on request — hinges, drawer slide rails, support legs and connecting brackets — which keeps one supplier accountable for the way doors align and drawers close. If a project already has a preferred hardware brand, name it in the specification and ask for that brand's fixing dimensions to be reflected in the shop drawings.
4. Resolve the open-plan details that only appear on site
A few decisions are easy to miss on paper and expensive to fix after delivery:
- End panels. In an open plan the return of a cabinet run is on show. Specify whether ends continue in the door material or stop at a carcass edge.
- Island backs and plinths. State the island cladding material, whether the plinth is recessed, and how services are routed to any sink or hob on the island.
- Lighting. Under-cabinet and in-cell lighting needs a cable route, a transformer position and a switch location agreed before the carcasses are built.
- Floor and ceiling interfaces. Give the finished floor level and the ceiling condition so scribe pieces and toe-kick heights can be set correctly at handover.
5. Match the specification to the project type
The same layout behaves differently depending on who uses it. For a private apartment, the priority is usually visual continuity with the living space: consistent panel tones, concealed storage and a quiet handleless front. For serviced apartments and hotel suites, the priority turns to maintenance — surfaces that wipe clean, hardware that survives daily use by strangers, and layouts repeated across units so replacements are simple. Our open plan kitchen cabinetry is customised per project on layout, dimensions, door style and finish for exactly this reason: the specification should follow the occupancy, not a catalogue.
Where the kitchen sits inside a wider fit-out, it is worth specifying it together with the custom built-in kitchen cabinets, wardrobes, wall panelling, flooring and lighting for the same building. One material schedule across those trades keeps veneer tones and edge details consistent and puts a single production and delivery programme behind them.
6. Turn the specification into an approval drawing
Before cutting any board, ask the supplier for shop drawings that repeat your material schedule: every module numbered with its width and height, door and drawer fronts identified with finish codes, hardware listed by item, and the open sections drawn from the inside so you can see the shelf positions. Check three things on those drawings — dimensions against the site survey, the direction of every door and drawer, and that the finishes named in your schedule are the finishes printed on the drawing. Sign that document and it becomes the reference for inspection when the goods arrive.
7. What to send with an enquiry
A complete open concept kitchen cabinet enquiry contains: plan and elevation drawings with dimensions; the material schedule (carcass, door, finish, worktop); a hardware list; appliance models; the number of identical units if it is a multi-unit project; destination city for delivery; and the target handover date. With those items we can quote accurately and move through design confirmation into production, packing and container loading without reopening the specification.
SANTERSON has manufactured furniture and building materials since 2008 and supplies project customers worldwide as a one-stop furniture and building materials supplier, covering custom cabinet production, freight and door-to-door delivery, installation support and after-sales service. If you are specifying cabinetry for an apartment block, hotel suite or villa renovation, send your drawings and material schedule and we will return shop drawings and a firm quotation.
Contact PHILLIP — Phone / WhatsApp: +86-13928214007 · Email: santerson@qq.com · Enquiries: https://www.santerson.com/contact/