A proposal for integrated lighting always looks convincing on paper: a rendering of a lit shelving wall, a finish schedule, one price line. The problems surface later, on site — the light module does not match the carcass thickness, the driver has no access panel, or nobody routed the cable. If you are sourcing Santerson Integrated Lighting Systems as part of a villa, hospitality or office fit-out, the proposal review is where most of that risk gets removed. Here is the assessment sequence we apply to built-in lighting packages, with the questions to put back to the manufacturer at each stage.

1. Establish what the scope actually covers

Integrated lighting sits across two trades, joinery and electrical, so the first job is to work out which trade the proposal speaks for. This product belongs to our Modular Shelving Systems range, where layout, dimensions, material and finish options are set per project rather than picked from fixed sizes. A proposal that quotes only “integrated lighting, as shown” is therefore incomplete. Ask instead for a schedule that separates five things: the shelving or wall system, the light modules and diffusers, the drivers and dimming gear, the control interface, and any site electrical work that stays with the local contractor.

Write down the exclusions as clearly as the inclusions. Wiring back to a distribution board, wall chases and final on-site commissioning are usually done by others. Leave those undefined and you will be reading a variation order instead of a finished invoice.

2. Verify the electrical specification rather than assume it

This is the column most often left blank in furniture-based lighting proposals. The product pages for integrated shelving lighting and for Santerson Integrated Cabinet Lighting both state that electrical specification and compatibility have to be confirmed for each configuration, so treat the electrical data as something you specify and then check.

Confirm this in writingWhy it matters on site
Input voltage and driver locationSets the cable runs, where access panels are needed, and whether a local electrician must be briefed.
Wattage per module and total circuit loadDetermines driver sizing and circuit count, and how much heat builds up inside a closed cabinet.
Dimming protocol and switchgear compatibilityA driver that will not pair with the dimmers already on site gets replaced after installation, at your cost.
Colour temperature and colour renderingWarm residential shelving and hospitality display lighting are specified differently; mismatched batches show up the moment they are lit together.
Ingress protection rating for wet or humid areasBathroom vanities, laundry joinery and outdoor kitchens need a different rating from living-room shelving.
Replacement and spare-parts routeA module sealed inside a finished wall system is expensive to swap out if no service access was designed in.

3. Check the lighting against the joinery detail, not the rendering

A lit elevation sells the concept; it does not prove the thing can be built. Ask for the shelf and panel profile drawings that show where the channel, diffuser and cable pass through the carcass. Four checks pay for themselves: is the rebate depth enough for the chosen profile; is there a routed path from every light run to its driver; how is the diffuser retained, and can it come off without damage; and are mitre and end-cap details drawn at returns and corners.

Where the lighting forms part of a living or media wall, review it next to the surrounding system rather than on its own. Santerson Modular System with Lighting (Living System) is listed as a configurable modular living system with finish, layout and dimensions set to suit each space, which makes it a useful comparison point when you want one finish code running across open shelving, closed storage and illuminated niches.

4. Test consistency of finishes and dimensions across the package

Integrated lighting is rarely bought alone. It arrives inside a wider built-in package — media walls, storage walls, wardrobes, vanities, kitchen cabinetry — and that is where descriptions start to drift. Check that finish names, panel thicknesses and edge details are worded the same way in every line item. Where two items look like the same finish but are described differently, ask for a physical sample instead of accepting the wording. These configurable wall-system listings carry limited individual detail on each page, so dimensions, hardware and electrical options need confirming project by project before an order is raised.

5. Read the logistics and installation terms as closely as the price

Light components packed inside assembled cabinetry are the items most likely to arrive damaged. Ask how modules, diffusers and drivers are packed — loose in labelled cartons with spares, or pre-fitted into finished panels — and ask who inspects on arrival. Our service range covers freight forwarding by sea, air and rail, customs paperwork, container loading and door-to-door delivery, with installation, snag inspection, warranty coverage, spare parts and ongoing maintenance afterwards. Confirm the practical detail for your destination: port of discharge, access at the delivery address, Incoterms, insurance scope, and what happens if a module is damaged in transit.

Then establish who installs. Site installation and snagging are normally coordinated with the local builder or electrician, so the proposal should state what support you get — fixing drawings, wiring diagrams, remote guidance, attendance on site — and what is expected of the site contractor in return.

6. Put every quotation on the same basis before comparing numbers

If more than one quotation is on your desk, normalise them first. Take one wall elevation, one module count, one finish code and one control arrangement, then ask each supplier to price that identical scope. Once the scope is fixed, the remaining gaps are usually driver brand, diffuser profile and service access — which is exactly where you can decide what you are willing to pay for.

A short pre-order checklist closes the job: dimensions signed off on site; one approved physical sample of both finish and light output; a circuit diagram showing driver locations with access; an agreed spares quantity; and everything excluded from price recorded in writing. A proposal that survives those checks is one you can order against. One that does not is cheaper to fix now than after the joinery has been manufactured.

To discuss integrated lighting as part of a built-in furniture package, review our Turnkey Interior Project Solutions or send your drawings and lighting schedule to the project team for a scope review.