Rammed earth walls have become one of the most requested finishes in hospitality, retail and villa projects, but building one in situ is slow, heavy and weather-dependent. The MCM flexible rammed earth panel solves that by reproducing the layered earth texture as a thin, bendable sheet you fix to the wall like tile cladding. Because the look is manufactured rather than built, almost every visual and dimensional detail can be adjusted to a drawing. The problem for buyers is knowing which adjustments are actually available before a sample is approved and a container is booked. This guide sets out the customisation topics worth putting on the table with your supplier, in the order they normally come up during specification.

Why projects choose a bendable soft stone panel at all

MCM is a modified clay material formed into a flexible sheet, sometimes described as soft ceramic or soft stone. The surface carries the stratified, hand-built look of traditional rammed earth, while the body stays thin enough to be bent onto curved walls, columns and other shaped surfaces that solid stone panels cannot follow. Three practical consequences drive most project decisions:

  • Curved geometry becomes buildable. Arched niches, round columns, reception desks and sweeping feature walls can be clad without fabricating a curved substrate from scratch.
  • Wall load drops. A thin sheet adds far less weight than stone or a built-up earth wall, which matters on partition walls, gypsum board backgrounds and renovation work over an existing structure.
  • Site work simplifies. Panels are fixed to a cement-based background or gypsum board with tile adhesive and cut on site with simple hand tools, so joints and edge details can be handled by the tiling crew rather than a specialist earth-wall contractor.

Typical applications seen on these projects include homestays and boutique hotels, cultural and heritage-style renovation, exhibition halls, restaurants and retail shopfronts, villa feature walls and exterior wall renovation. That application mix is exactly why the customisation conversation matters: a restaurant facade and a hotel lobby corridor need different decisions.

Surface colour and texture range

The rammed earth product line is offered in white and earth brown tones, which cover the two directions most designers ask for: a pale, sandy strata for bright interiors, and a warmer soil tone for feature walls and facades. When you raise colour with your supplier, treat it as the first of three separate questions rather than one.

DecisionWhat to askWhy it matters on site
Tone and bandingWhich base colour, and how strong should the horizontal strata read from a distance?Banding contrast changes the character completely: subtle bands stay quiet behind furniture, bold bands become the focal point.
Texture depthHow pronounced is the surface relief, and can the mould produce a shallower or deeper profile?Deep relief catches grazing light and shows every imperfection in the substrate; shallow relief is safer in high-touch areas.
Batch consistencyWhich batch does the production run come from, and can the whole order be pulled from matched batches?Cladding ordered across separate batches can arrive with visible tone drift once a full wall is up.

If your project wants a different stone character rather than earth tones, the same flexible-sheet approach is available as MCM flexible travertine stone veneer, which replicates the pitted surface of natural travertine and comes in several colours for interior walls and exterior facades. Specifying both finishes from one material family keeps curved detailing consistent across a building.

Panel format, thickness and cutting layout

Sheet size and thickness decide how much cutting your crew does and how tight a radius the panel will accept. Ask for the standard sheet dimensions and thickness options in writing, then send your elevations so the supplier can mark up a cutting layout against them.

  • Module size. Larger modules mean fewer joints but more waste around openings; smaller modules make curved and small-format walls easier to dress.
  • Thickness. Thinner sheets bend onto tighter curves and add less weight, but the background must be flatter for the finish to look right.
  • Bend radius. Give the supplier the smallest radius in your drawings and ask which panels can take it, rather than assuming every format behaves the same on a column.
  • Cutting allowance. Panels are cut on site with simple tools, so confirm how corners, external edges and service penetrations should be finished, and whether pre-cut pieces are an option for repeat details such as reception desks.

Send the actual elevation drawings, not a mood board. Almost every other decision in this article — format, radius, joint width, background build-up — depends on real dimensions.

Substrate and fixing method for your wall type

The product is bonded with tile adhesive to a cement-based base or to gypsum board. What you should agree with the supplier depends on where the panel is going:

  • New interior partition. Confirm the board type and fixing detail that gives a flat, rigid background before any cladding starts.
  • Renovation over an existing wall. Check whether the old surface needs levelling or a new boarding layer, since thin flexible sheets follow whatever is behind them.
  • Curved wall or column. Ask how the curved substrate should be formed and whether the panel can be dry-applied first to test the radius before adhesive goes on.
  • Exterior wall. Confirm the fixing and joint treatment recommended for facade use, including the weather-resistant and anti-crack properties stated for outdoor applications.

These are questions to settle with your supplier and your local contractor together. Fixing details, background build-ups and any local building-code requirements remain the responsibility of the design team and installer in the project country; a material supplier's guidance is not a substitute for that.

Interior or exterior exposure

The flexible stone range is used on both interiors and facades, and the travertine product is described with weather resistance plus anti-freezing and anti-crack properties for outdoor use. Before ordering, state clearly which walls are inside and which are exposed, because the same wall can carry different detailing at a soffit, a planter edge or a ground-level base course. Ask your supplier to confirm, per location, which product and which joint detail they recommend, and keep interior and exterior orders documented separately even when the colour looks similar.

Edge, corner and joint detailing

The difference between a convincing rammed earth wall and an obvious cladding job is almost always at the edges. Put these details in the drawing set and get them confirmed on the approved sample:

  • External corners. Whether panels are mitred, wrapped with a pre-formed piece, or stopped with a shadow-gap trim.
  • Joint treatment. How joints are closed and what finish the joint line should read as — invisible, deliberately linear, or part of the strata.
  • Transitions. Where cladding meets flooring, ceiling, glazing, joinery and door frames, including which trade executes each junction.
  • Lighting interaction. Wall lights and grazing light reveal relief and substrate faults; agree the lighting detail with the sample in hand.

Samples, mock-ups and approval documentation

Free samples are available on the flexible stone range, which makes a physical review straightforward. Ask for a sample of the exact colour and surface you are specifying, plus an offcut that has been bent onto a curve so you can judge how the texture behaves when stretched around a radius. For hospitality and retail work, a small on-site or workshop mock-up including one external corner and one joint is worth the time: it settles detailing questions before they become variations.

Record what was approved — colour reference, batch, format, joint detail and fixing method — in one document that both your team and the installer hold. Most disputes about cladding work trace back to an approval record that nobody kept.

Ordering quantities, packaging and lead time

Cladding orders go wrong on quantity more often than on appearance. Ask the supplier to review your cutting layout and give a take-off with a stated wastage allowance for cuts, corners and breakage in transit, then hold a small reserve of matched-batch panels for future repairs. Confirm packaging and container loading arrangements, and agree how partial replenishment orders will be handled if a wall needs more material after installation begins — replacement panels from a later batch may not match.

Coordinating cladding with the rest of the fit-out

Wall finishes rarely arrive alone. When cladding, joinery, lighting and flooring are sourced separately, junction details get argued out on site at the worst possible moment. SANTERSON works as a one-stop furniture and building materials supplier, covering wall panels alongside building and construction materials such as aluminium ceilings, honeycomb cladding panels and engineered flooring, plus the joinery and fixtures they meet. That single-supplier scope makes it easier to agree transitions once, in one drawing set, and to keep several finishes on the same production and shipping schedule through logistics and door-to-door delivery.

For projects that need more than catalogue items, custom and OEM service covers bespoke finishes, prototyping and flexible order quantities, and project work can be coordinated from design through production, delivery and installation. Buyers should still confirm current options, minimum order quantities and schedules for their own project rather than assuming published capabilities apply unchanged.

Buyer questions before you specify

Can the panel wrap a curved reception desk, not just a wall?

Yes — flexibility is the point of the material, and shaped surfaces such as cylinders and special-form geometry are listed applications. Confirm your smallest radius with the supplier before ordering, since format and thickness affect how tight a bend is comfortable.

Who installs it — a tiler or a specialist?

The fixing method is tile adhesive onto a cement base or gypsum board, with on-site cutting using simple tools, so an experienced tiling crew can normally handle it. Corner, joint and facade detailing should be agreed in advance with the supplier's guidance and executed by your local contractor.

Is rammed earth the only look available?

No. The same flexible-sheet family includes travertine-effect veneer for interiors and facades, and the wider wall range covers decorative panels, 3D panels and acoustic panels if a project needs a different finish in adjacent spaces.

Can I get a sample before committing to a full wall?

Samples are available on request for the flexible stone range. Ask for the exact colour under consideration and, where curves are involved, check how the sheet reads once bent.

Bring your elevations, your smallest radius, your interior and exterior wall list and your lighting drawings to the conversation, and most of the customisation decisions on MCM flexible rammed earth panel can be settled before a single sheet ships.

Related products: MCM Flexible Travertine Stone Veneer · Wall Panel Systems · Luxury Decorative 3D Wall Panel · Santerson Acoustic Panels