An outdoor swim spa is not a shelf item ordered by model code alone. The same shell can carry different pumps, sanitation, heating and cover options, and the site conditions change what has to be delivered with it. That is why an enquiry that only says "please quote WS-PC07ST" usually comes back with more questions than a price. Below is the information we need from a buyer or specifier to turn that model code into a firm, comparable quotation.
Start with the site, not the catalogue
Before sizing anything, send the installation setting. A villa terrace, a resort pool deck, a rooftop and an indoor leisure room each create different requirements for access, drainage, structure and services.
- Project location and delivery address, plus whether the goods go to a builder, a site or a freight forwarder.
- Indoor or outdoor installation, and whether the spa sits above ground, semi-recessed or fully recessed with a surround.
- Clear access route from the delivery vehicle to the final position: gate and door widths, stairwell, lift capacity, lifting equipment needed, and any site limits on working hours.
- Slab or deck load capacity, how level and flat the prepared base is, and where overflow and drain water will go.
Confirm which variant of the PC07ST family you mean
The catalogue lists three closely related models. Their published shell sizes differ, and one carries an automatic cover option, so a quotation built on the wrong code cannot be compared fairly with another offer.
| Catalogue model | Listed dimensions | Features shown on the product page |
|---|---|---|
| Outdoor Swim Spa WS-PC07ST | 7000 x 2400 x 1470 mm | Water jets, LED lighting, ozone, swim training system |
| Outdoor Swim Spa WS-PC07ST-L | 7490 x 2400 x 1470 mm | Water jets, LED lighting, ozone, swim training system |
| Outdoor Swim Spa WS-PC07ST-S | 7000 x 2400 x 1470 mm | Water jets, LED lighting, ozone, swim training system, automatic cover option |
The specification block for these models shows one control system, one swim training system, one filter pump, six jets and four LED lights. If your drawings or bill of quantities name a different jet count, lighting layout or water pump arrangement, send that document with the enquiry so we quote against your paperwork instead of the catalogue default.
Decide the equipment options before asking for a price
Catalogue-listed add-ons for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option should be confirmed on your selected configuration rather than assumed.
- Water treatment: ozone appears in the listed features for this family, with UV sterilisation and sand filtration available as options. Tell us what the operator or owner expects for the maintenance routine and chemical handling.
- Heating: whether a heat pump is required, and the water temperature you want the spa to hold through the coldest month on site. Both drive the equipment selection and the running-cost estimate.
- Insulation and cover: which insulation package, and whether you want the automatic cover option where it is offered. On exposed sites a cover changes heat retention and safety, so it belongs in the first quotation rather than an add-on later.
- Steps and access: integrated steps, handrail or entry arrangement, particularly for hospitality use where children and older guests are among the users.
- Controls: how the spa will be operated, whether by an owner panel, front-desk control or building management oversight, and whether remote monitoring is needed.
Supply the services and electrical information
Power is where most quotations stall. The catalogue shows a total power figure for these models, but that figure describes the standard configuration, and your chosen options change the load. Please provide:
- Available supply: phase, voltage and frequency at the site, and where the distribution board sits relative to the spa.
- Confirmation of who handles final connection, isolators, protective devices and earthing in line with local wiring rules. We provide the connected load and the location we need the supply brought to; your electrician selects the protection to suit their jurisdiction.
- Water supply and fill strategy, drain or pump-out route, and ventilation arrangements for indoor rooms.
- Structural and waterproofing details already drawn by your engineer or architect.
Project type, quantities and commercial terms
A single residential spa and a resort block of several units are quoted differently. Let us know:
- Quantity, and whether the units are identical or mixed across the site. For hospitality schemes we can quote from the wider swimming pools and swim spas range so alternatives sit side by side in one comparison.
- Who specifies, who buys and who installs: developer, builder, landscape contractor or pool specialist. Naming these roles early avoids gaps between trades.
- Required delivery window, port of destination and preferred Incoterms. Freight by sea, air and rail with customs paperwork and door-to-door delivery forms part of our turnkey project service.
- Warranty expectations, spare-parts needs and commissioning support for the handover stage. Our service scope covers installation support and after-sales assistance; tell us which of these you want us to carry out and which stay with your local contractor.
Match the spa to the rest of the poolside specification
Poolside loungers, shaded pergolas and wet-area decking usually reach the site in the same shipment as a swim spa. Coordinating them early avoids mismatched finishes and split deliveries. If your scheme also needs outdoor furniture for villas and resorts, send those line items with the spa enquiry so one order covers the whole poolside area.
A short checklist to send with your enquiry
- Model code from the PC07ST family, or your drawing reference if the code is not fixed yet.
- Site photos, plan and access route; indoor or outdoor; recessed or above ground.
- Option list: treatment, heating, insulation, cover, steps, controls.
- Electrical supply details and who performs the final connection.
- Quantity, delivery address, target date and Incoterms.
- A contact name available for technical clarification, not only purchasing.
Send those items and the first quotation returns with a defined configuration, a comparable specification sheet and a clear statement of what is included and what is site-supplied. Send only the model code, and you receive a price that cannot be compared fairly, which is the most common reason swim spa tenders stall.