A light grey shaker kitchen rarely fails because of the door style. It fails at the handover point, when a supplier is asked to build something from a mood board and two room photographs. If you are specifying cabinetry for a villa, an apartment block or a boutique hotel, the difference between a clean production run and a costly rework comes down to what you send in your first enquiry. The measurements and project inputs listed below are the ones our team works from when a light grey shaker style kitchen cabinet package moves from concept into manufacturing.

Start With the Room, Not the Colour

Grey is a finish decision; the measurements are the specification. Send the shell dimensions first, and record them the way an installer would take them on site rather than the way a floor plan prints them.

MeasurementWhat to recordWhy it changes the build
Wall run lengthsEach wall from corner to corner, plus any return into a hallway or living areaSets module widths and where scribes and filler panels land
Room depth at three pointsLeft, centre and right of the main runOlder villas and renovated apartments are rarely square; base depth has to absorb the variance
Floor to ceiling heightFinished floor level to underside of slab or bulkhead, at both ends of the runDecides whether a full-height top box is possible or whether a soffit detail is needed
Ceiling irregularitiesBulkheads, beams, exposed services, AC ducts and their heights and offsetsTall cabinets and integrated appliance housings must clear these before the doors are cut
window sill and head heightsSill height above finished floor, window height, reveal depthConstrains wall unit height and where a glass display section can sit
Door and opening positionsSwing direction, clear opening width, distance to the nearest cornerAffects traffic flow and whether a tall bank blocks a walkway when open
Existing finishesFloor build-up, wall plaster thickness, tile line where tiling stopsDetermines scribe allowance and how the cabinet carcase meets the wall

Two practical notes on this stage. Photograph each wall straight on with a tape visible in the frame, and mark the position of every socket, switch, gas point, water outlet and floor drain on a simple sketch. Cabinet design is where those points get moved or hidden, and finding that out after production starts is the most expensive mistake in the whole package.

Appliance Schedule: The Part Most Enquiries Get Wrong

Shaker kitchens in villa and hospitality projects are almost never built around freestanding equipment. Our light grey shaker style kitchen cabinets are configured with a built-in wine refrigerator, oven and microwave, with glass display cabinets and open niches lit by warm LED lighting. That kind of integration only works if the appliance list arrives before the drawings do.

  • Model numbers for every built-in appliance, not just categories: oven, microwave, wine refrigerator, dishwasher, hob, extractor, refrigerator.
  • Niche dimensions from each manufacturer's installation sheet, including required ventilation gaps and minimum drawer clearance below an oven.
  • Electrical load and socket location per appliance, plus who is supplying the equipment and who is installing it.
  • For a wine refrigerator, whether you want it displayed at eye level in a glass-fronted section or concealed behind a matching shaker panel.

Where appliances are not yet chosen, tell us the intended sizes and let the cabinetry reserve the space. Integrated appliance tall cabinets can be built to a manufacturer's niche standard you confirm later, but only if we know the target envelope now.

Layout Inputs: How the Kitchen Is Actually Used

A working triangle of washing, preparing and cooking is the starting point, and layout type follows from the room rather than from preference. L-shaped runs suit narrow villa kitchens; galley layouts work in apartments; an island or peninsula needs real clearance around it, not just a drawing that looks balanced.

Send us how the space is used, because this drives internal specification more than anything else:

  • Daily cooking intensity and whether the kitchen doubles as a serving or breakfast area for guests.
  • Storage inventory worth planning around: tableware sets, glassware, small appliances, dry goods, pots, trays, cleaning supplies.
  • Whether display matters. Glass-fronted sections with LED lighting work well in boutique hotel and villa projects; in a rental or high-turnover apartment they increase maintenance.
  • Corner strategy. Pull-out mechanisms recover usable depth that fixed shelving wastes.

If the kitchen opens into the living area, plan it as one visual composition. Open plan kitchen cabinetry lets the same door profile, colour and worktop continue into media walls, pantries and sideboards, so the joinery reads as built-in architecture instead of furniture pushed against a wall.

Specifying the Grey Itself

"Light grey" covers a wide range on a sample card and an even wider range under site lighting. To avoid a colour dispute at handover, send three things:

  • A reference: a RAL or Pantone code, a physical swatch you already approve, or a photograph of the exact shade in daylight.
  • The finish sheen you want. A soft matte reads differently from a lacquered surface under the same LED tape lighting.
  • The pairing decision. Two-tone schemes pair a light grey body with off-white upper cabinets, or with a darker tall bank; state which elements carry which colour.

Hardware is part of the palette, not an afterthought. The shaker configuration shown on our site pairs raised panel doors in light grey and off-white with golden hardware for a softer luxury look. Send the tone you want for handles, knobs and hinges, plus your preference for soft-close fittings, and we match the set across the package. If the same shaker language needs to continue into bedrooms, shaker panel wardrobes can be built in the identical door profile and colour so the joinery is consistent through the building.

Order physical samples of the door panel and worktop edge before you sign off a production run. Screens and renders shift grey toward blue or beige; a board sample under your own site lighting settles the question in one afternoon.

Interface Details That Decide Whether the Kitchen Looks Custom

These are the items that separate built-in joinery from flat-pack cabinetry, and each one needs a decision in your enquiry:

  • Worktop and upstand. Thickness, edge profile, whether the surface wraps the island, and how it meets the wall. Stone surfaces can be coordinated with the cabinet package.
  • Backsplash. Material, joint layout and where it starts and stops relative to the tiling line.
  • Lighting. Under-cabinet tape, in-case lighting for glass display sections, transformer locations and switching. Electrical specification has to be agreed with your electrician before panels are drilled.
  • Scribe and filler allowance. How the carcase closes against an out-of-plumb wall.
  • Kick plinth and legs. Recessed or flush, and matching colour.

Project Inputs We Need for a Usable Quotation

Beyond the drawings, procurement context is what allows us to price a package rather than a single kitchen. For multi-unit or hospitality work, this is where enquiries either speed up or stall:

InputWhy it matters
Project type and unit countVilla, apartment block or boutique hotel; quantities drive both price and the sampling plan
Destination country and delivery addressSets freight mode, packaging standard and container loading plan
Incoterms preferenceWhether you take delivery at port or door-to-door
Site access for installationLift size, stair width and floor protection rules decide how modules are sized and packed
Local trade sequenceWho handles plumbing, electrical and stonework around the joinery
Programme datesProduction slots and shipment windows are planned backwards from site readiness

SANTERSON works as a turnkey furniture and building materials supplier, covering design coordination, custom manufacturing, logistics and door-to-door delivery, installation support and after-sales service. Because the same team handles cabinetry alongside flooring, lighting, wardrobes, sanitaryware and wall finishes, one package can carry a single shaker language through every room in a project instead of reconciling several suppliers' interpretations of the same grey.

A Practical Checklist Before You Send an Enquiry

  • Measured shell drawings or on-site photographs with dimensions marked, including heights and irregularities.
  • Appliance schedule with model numbers and niche dimensions, or the intended envelope if undecided.
  • Colour reference, sheen, hardware tone and two-tone allocation.
  • Worktop, backsplash and lighting decisions, with electrical coordination named.
  • Internal storage brief: what is stored, where, and how much display you want.
  • Project type, quantities, destination, Incoterms preference and target dates.

Frequently Asked Questions

Can a light grey shaker kitchen be matched to an existing colour in a renovation?

Yes, within limits. Send a physical swatch or a RAL reference and we produce samples for approval before the run. Very old factory finishes can sit outside a standard colour range, which is why sample sign-off happens before production rather than after.

Do you supply the appliances with the cabinets?

Cabinetry is built to the appliance niche dimensions you confirm. Where equipment is supplied by others, we need installation sheets early; where integration is part of the package, we coordinate it during design confirmation.

Can the same grey be repeated across wardrobes and other joinery?

Yes, when colour, sheen and material are specified once for the whole project. That is the main argument for consolidating cabinetry, wardrobes and interior fixtures with one manufacturer.

What if the walls are not square?

Record the variance in your measurements. We build scribe and filler panels into the design so the front line stays true, rather than forcing standard modules onto an uneven shell.

Send the Measurements and Project Inputs, Get a Buildable Specification

A light grey shaker kitchen is specified by numbers before it is specified by taste: wall runs, ceiling heights, appliance niches, scribe allowances, colour references and interface details. Send those measurements and project inputs with your drawings and the design stage becomes a confirmation exercise instead of a discovery process.

Share your measurements, appliance schedule and project location with our team, and we will return a cabinetry specification sized for your site, with production, delivery and installation coordinated as one package.

Product configurations, materials, finishes and service scope are confirmed per project. Dimensions, electrical requirements, appliance niches and delivery terms should be verified against your site drawings and local trade arrangements before order confirmation.