A swim spa that looks right on a mood board can still fail on site if the structure, power and drainage were never reconciled with the drawings. The Outdoor Swim Spa WS-PC01A is a compact, configurable unit in our outdoor swim and hydrotherapy range, and it is exactly the kind of product that rewards early coordination. This guide walks through what to check on the drawings, what to confirm with the site team, and where our design, custom/OEM and installation services fit into the process.
Start from the catalogue footprint, not the brochure photo
The published catalogue entry for WS-PC01A lists a 3000 × 930 mm footprint. Treat that as the starting envelope for setting-out, and then work out the clearances that a real installation needs: an access route for delivery and rigging, working space around the control system and pumps, room for steps at the chosen entry side, and a maintenance gap so a technician can reach the filter pump without draining or lifting anything.
On our drawings we ask for the finished level of the surrounding deck, the position of nearby walls and glazing, and the route from the delivery point to the final position. Those three items decide whether a 3000 mm shell can actually be moved into place, and they are the most common reason a spa that fits on paper does not fit on site.
Read the specification as a configuration, not a fixed list
WS-PC01A is shown in the catalogue with one control system, two water pumps, one filter pump, 28 jets in total, one LED light plus nine small LED lights, and a total power figure of 3.25 kW. The features marked on the page are water jets, LED lighting and ozone. A swim training system is not listed for this model.
| Catalogue footprint | 3000 × 930 mm |
| Control system | 1 set |
| Water pump / filter pump | 2 pcs / 1 pc |
| Jets | 28 in total |
| Lighting | 1 LED light plus 9 small LED lights |
| Total power (catalogue) | 3.25 kW |
| Features shown | Water jets, LED lighting, ozone |
Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so the equipment list in your order is the document that matters — not the marketing page. Every option you add changes the power draw, the plant space and sometimes the shell detail, which is why we recommend locking the configuration before the electrical drawings are issued.
Please confirm the included equipment and the electrical requirements for your selected configuration with us in writing before the site works begin. The figures above come from the catalogue page and can change between configurations.
What the design drawings should carry
For a project to move smoothly, we ask the architect or landscape designer for a small, specific set of information rather than a full spa design from us:
- A setting-out plan showing the spa position, deck finish levels and the access route for delivery.
- A supporting base detail — slab thickness, reinforcement and whether the shell sits fully supported or on a perimeter frame with a void.
- An electrical layout with the supply location, circuit rating, isolation position and the earthing/bonding arrangement your local electrician will use.
- Drainage and overflow routes, plus where the filter pump and control system sit relative to service access.
- Finishes for the coping and deck edge, so the shell rim meets stone, tile or timber cleanly instead of with an on-site workaround.
If any of those five are missing, we flag it before production rather than during installation. That single step removes most of the arguments that appear on site.
Site requirements to confirm with the builder
Three conversations settle the practical side. First, structure: a filled and supported base is generally simpler than a recessed pit, and a recessed installation needs drainage behind the shell so rainwater cannot build up against it. Second, power: the total power figure on the catalogue page reflects one configuration, so the electrician should size the circuit from the confirmed equipment list, with a dedicated isolator within the reach distance their regulations require. Third, environment: where the spa sits in relation to pergolas, glass balustrades and planting affects both splash-out and how much leaf litter the filtration system has to handle.
If you are comparing configurations, our wider swimming pools and swim spas range covers different footprints and jet layouts. Where a standard shell does not suit the space, the Customizable Shape Outdoor Spa supports square, round, oval and curved forms in an acrylic shell with structural reinforcement, which is often the better answer for terraces and irregular garden rooms.
How our services fit into procurement
SANTERSON works as a one-stop furniture and building materials supplier, so the swim spa is ordered alongside the rest of the outdoor and interior package rather than through five separate vendors. In practice that means one specification sheet, one production schedule and one delivery plan. Our services cover design consultation and space planning, material and product selection, manufacturing with quality control, project management and site coordination, then installation and after-sales support.
For villa and hospitality projects in Australia we have delivered packages on residential schemes including villas in Sydney, Melbourne, Perth and Willoughby. Freight is arranged by sea, air or rail with the customs paperwork handled at our end, and door-to-door delivery can be planned around your site programme. Import terms, duties and any local installation requirements are confirmed project by project with your local team — we do not assume a standard applies that has not been checked.
A short checklist before you order
- Confirm the model code on the order matches the shell being delivered; codes in this range are close and easy to mix up.
- Confirm the option list: heat pump, insulation, UV sterilisation, sand filtration and steps each change power and space needs.
- Confirm who supplies and installs the electrical work, and who signs off the bonding arrangement.
- Confirm the base detail and its cure time against your site programme.
- Confirm the delivery route, lifting method and access date while the site is still open.
Send us your drawings, the intended location and the configuration you are considering for the Outdoor Swim Spa WS-PC01A, and we will return a confirmed specification, a base and clearance requirement sheet, and a delivery plan. Contact PHILLIP on +86-13928214007 or santerson@qq.com to start the coordination.